# The SFB Master Plan as a database (7 November 2026)

passes traced the six terminal floor plans (Figures 2-16 to 2-21) and took the facts the Exploder needed. This pass
reads the whole plan and writes it down as cited records.

- The database: `projects/sfb-terminal/02-evidence/master-plan-db.json`
- Its schema: `projects/sfb-terminal/02-evidence/master-plan-db.schema.json`
- The builder: `tools/master-plan-db.py` (it refuses to write a file that fails the schema)
- Rows read by eye from page images: `tools/master-plan-db-curated.json`

Rebuild with `python3 tools/master-plan-db.py`. The build reads only local files and the two PDFs in
`01-intake/master-plan`.

## What was read

| Document | Pages | Source |
|---|---:|---|
| 2021 Airport Master Plan Update, Volume I: Main Narrative (Final 2.0, October 2021) | 438 | flysfb.com, already in `01-intake` |
| Chapter 5 Development Alternatives, Draft v1.3 (August 2021) | 61 | fetched from flysfb.com for this pass, entered in `01-intake/files.json` |

Volume I was read from its text layer (`02-evidence/master-plan-pages/ampu.txt`). The 49 full-page drawings were
also read from their own text layer in reading order, so their labels ("PROPOSED PARKING STRUCTURE (4,000 SPACES)")
are records too. Table 7-2, the capital programme, is a picture in the PDF. It was read from a page render, row by
row, and every phase subtotal and the grand total were checked against the sum of the rows.

The draft was compared with the final. Where a draft sentence appears in the final it is not recorded twice. Eight
statements are draft only (see Chapter 5 below).

## How a record is shaped

Each fact cites where it was printed: document and chapter, then section with any unnumbered heading under it, then
page with table or figure. The number is
kept as printed (`cell` for a table, the sentence for prose) beside the parsed `value` and `unit`. A table row is
written once as printed (`kind: table row`) and then once per cell (`kind: table cell`) with its row and column
labels, so any cell can be checked against its row.

`planning_year` holds the year as the plan names it. The plan states its later needs by Planning Activity Level. The
PALs map to years because Table 4-31's annual enplanements for PAL 1 to PAL 4 equal the Table 3-33 forecast for
2022, 2027, 2032 and 2037. Baseline is 2017. Section 4.7 puts PAL GA 1 to 4 on the same years. CIP rows carry their
phase years from section 7.5: Phase 1 is 2022-2026, Phase 2 is 2027-2031, Phase 3 is 2032-2041.

`category` comes from a controlled list of 50 categories, set by section and refined by a few keyword rules.
`entities` names what the fact is about and the twin id it maps to, with `in_twin` true when that id exists in
`exploder.json` or `asset-list.json`. The plan stage, RFP requirement and sensor class for each entity are kept once,
in `twin_coverage`.

## Counts

13,081 facts, 163 tables and 123 figures in Volume I, plus the draft's 19 tables and 27 figures.

### By chapter

| Chapter | Title | Facts | Tables | Figures |
|---|---|---:|---:|---:|
| ES | Executive Summary | 416 | 15 | 0 |
| 1 | Introduction | 10 | 0 | 1 |
| 2 | Inventory of Existing Conditions | 660 | 11 | 30 |
| 3 | Aviation Demand Forecasts | 6543 | 33 | 6 |
| 4 | Demand Capacity and Facility Requirements | 2916 | 63 | 27 |
| 5 | Development Alternatives | 574 | 19 | 27 |
| 6 | Environmental Overview | 321 | 6 | 19 |
| 7 | Financial Plan | 1424 | 11 | 9 |
| 8 | Public Involvement Program | 6 | 0 | 0 |
| 9 | Airport Layout Plan | 13 | 0 | 0 |
| 10 | Sustainability Plan | 198 | 5 | 4 |
| | All | 13081 | 163 | 123 |

The Chapter 5 draft adds 19 tables and 27 figures (the same numbers as the final) and 8 statements the final does not carry.

### By category

| Category | What it holds | Facts |
|---|---|---:|
| `context.purpose` | Purpose, goals, process and key issues of the plan | 13 |
| `context.setting` | Location, role, history, management of the airport | 64 |
| `context.meteorology` | Weather and wind coverage | 16 |
| `inventory.airfield` | Existing runways, taxiways, aprons and pavement condition | 256 |
| `inventory.navaids-lighting` | Existing NAVAIDs, approach procedures, airfield lighting, signs and markings | 16 |
| `inventory.terminal` | Existing passenger terminal, gates and terminal spaces | 67 |
| `inventory.landside` | Existing roads, curbs, parking, rental cars and ground transport | 40 |
| `inventory.general-aviation` | Existing GA hangars, FBOs, tenants and GA aprons | 66 |
| `inventory.cargo` | Existing air cargo facilities | 2 |
| `inventory.support` | Existing support facilities: ARFF, ATCT, maintenance, fuel, police | 83 |
| `inventory.airspace` | Airspace structure, ATC, nearby airports | 42 |
| `inventory.land-use` | Land use, zoning, vacant land | 6 |
| `socioeconomic` | Market area population, employment, GDP, tourism | 300 |
| `forecast.enplanements` | Passenger enplanement forecasts | 1531 |
| `forecast.based-aircraft` | Based aircraft and their fleet mix | 1618 |
| `forecast.operations` | Aircraft operations forecasts by type | 2045 |
| `forecast.fleet-mix` | Air carrier fleet mix | 192 |
| `forecast.cargo` | Air cargo tonnage forecast | 131 |
| `forecast.peak` | Peak month, day and hour activity | 186 |
| `forecast.summary` | Forecast summaries and comparison with the FAA TAF | 577 |
| `design-standard` | Critical aircraft, AAC, ADG, TDG, RDC, safety areas, RPZs, separations | 370 |
| `capacity.airfield` | Hourly capacity, annual service volume, delay | 276 |
| `capacity.airspace` | Airspace and converging approach limits | 180 |
| `requirement.runway` | Runway length, width, pavement, safety area needs | 486 |
| `requirement.taxiway` | Taxiway width, geometry, pavement and safety area needs | 164 |
| `requirement.navaids-lighting` | Lighting, signage, marking and NAVAID needs | 22 |
| `requirement.terminal` | Terminal space needs: gates, ticketing, screening, FIS, hold rooms, concessions, baggage, services | 879 |
| `requirement.general-aviation` | GA terminal, hangar and apron needs | 229 |
| `requirement.apron` | Commercial and based apron needs | 140 |
| `requirement.landside` | Roads, curb, parking and rental car needs | 392 |
| `requirement.support` | ARFF, fuel, maintenance, ATCT and other support needs | 94 |
| `alternative.considered` | Development alternatives as considered, with their options | 479 |
| `alternative.evaluation` | Evaluation criteria and scoring of the alternatives | 2 |
| `alternative.preferred` | The preferred development alternative | 107 |
| `environmental.noise` | Noise contours and impacts | 187 |
| `environmental.water` | Wetlands, floodplains, water quality, drainage and stormwater | 22 |
| `environmental.biotic` | Species and biotic communities | 40 |
| `environmental.hazmat` | Hazardous materials and pollution prevention | 2 |
| `environmental.cultural` | Historic, cultural and Section 4(f) resources | 42 |
| `environmental.other` | Air quality, land use compatibility, light, energy, socioeconomic and other NEPA categories | 53 |
| `cip.project` | Capital improvement programme projects, phases and costs | 62 |
| `financial.historical` | Historical revenues, expenses and operating statistics | 336 |
| `financial.forecast` | Forecast revenues, expenses and net revenues | 802 |
| `financial.funding` | Funding sources, needs, shortfalls and contingency plans | 235 |
| `public-involvement` | Technical advisory committee and public meetings | 6 |
| `alp` | Airport Layout Plan set | 14 |
| `sustainability` | Sustainability plan, initiatives and action plan | 197 |
| `covid` | Covid-19 disclaimer and assumptions | 12 |

### By kind

| Kind | Facts |
|---|---:|
| table cell | 9327 |
| table row | 1891 |
| statement | 1560 |
| figure label | 269 |
| layout line | 26 |
| draft statement (not in the final) | 8 |

## Summary by chapter

### Executive Summary (pages 15 to 29)

Base year 2017, a 20-year forecast from 2018 to 2037, approved by the FAA on 24 March 2020. The summary repeats the
key tables as Tables 1-1 to 1-15. Enplanements grow from 1,436,224 (2017) to 2,747,325 (2037), a 3.3 percent rate.
Based aircraft grow from 350 to 498. Operations grow from 303,044 to 382,167. The Annual Service Volume is 451,619,
and 2019 operations of 356,212 stood at 79 percent of it. The Covid-19 note asks the reader to treat the forecast
years as activity levels, not dates.

### 1. Introduction (pages 31 to 36)

Purpose, goals and the planning steps (Figure 1-1). Ten records.

### 2. Inventory of Existing Conditions (pages 37 to 110)

- **Site.** About 2,400 acres. History from the naval air station commissioned in 1942 to the latest terminal expansion.
- **Airfield.** Four runways in Table 2-1: 9L/27R 11,002 by 150 ft, 9C/27C 3,578 by 75 ft, 9R/27L 5,839 by 75 ft,
  18/36 6,002 by 150 ft, each with surface, lighting, marking, approach aids, gear strengths and end coordinates.
  Declared distances (Table 2-2) and design codes (Tables 2-3 to 2-8). Pavement condition from the APER:
  46 percent of taxiway pavement was poor to serious.
- **NAVAIDs and lighting.** Eight instrument approaches (Table 2-9), ILS on 9L, 9R and 27R. The SAA reports
  approach lights, REILs, edge lights, threshold lights and apron lighting in good condition.
- **Terminal.** Former Terminal B: built 1992, about 178,000 sq ft conditioned. Former Terminal A: built 1996 with a
  60,000 sq ft FIS, about 209,000 sq ft conditioned. The latest expansion added Gates 1 to 4. Figures 2-16 to 2-21 are
  the floor plans the twin already traced.
- **Landside.** Curb frontage of 906 ft, 764 usable. Lot capacities on Figure 2-22, among them the 830-space garage
  (Lot G), Lot H at about 230, Lot L at 806 and Lot E at 608. Eight rental car companies.
- **General aviation.** 348 based aircraft. Building sizes for MillionAir, CE Avionics, Constant Aviation, Hill
  Dermaceuticals, L3Harris and the South East Ramp complex (24 buildings, over 275,000 sq ft, with the 48,610 sq ft
  GSA hangar).
- **Cargo and support.** A cargo building of about 53,000 sq ft with 6,600 sq ft of cold storage. ARFF Index D with
  five vehicles. The ATCT. Table 2-10 lists 24 fuel tanks with owner, address, capacity and grade. The 30th Street
  fuel farm holds 950,000 gallons of Jet-A.
- **Airspace and land use.** Airspace classes, nearby airports (Table 2-11), zoning and on-airport land use.

### 3. Aviation Demand Forecasts (pages 111 to 180)

The largest chapter by records (6,543), because its tables give every year from 1997 to 2037. Socioeconomic tables
(3-1 to 3-5). Enplanement methods and the preferred forecast (3-6 to 3-11). Based aircraft and fleet mix (3-12 to
3-18). Operations by type (3-19 to 3-30). Peak activity (3-31). The comparison with the FAA TAF (3-32). Table 3-33
holds every forecast year: enplanements, itinerant and local operations by type, total operations and based aircraft.
Air cargo was 332 tons in 2017.

### 4. Demand Capacity and Facility Requirements (pages 181 to 278)

- **Design.** Critical aircraft by runway (Tables 4-5, 4-6): Boeing 787-8 on 9L/27R (D-V, TDG 5). The future critical
  aircraft for 9R/27L and 18/36 is the A320 family (C-III, TDG 3).
- **Capacity.** Hourly capacity of 353 VFR and 118 IFR in the east-west flow (Table 4-12). Demand reaches 85 percent
  of ASV by 2037 (Table 4-14). Converging approaches with ORL, DED, X50, MCO, EVB, X21 and DAB (Figures 4-4 to 4-16).
- **Runways and taxiways.** Length needs: 7,200 ft for 18/36 and 9R/27L, 4,200 ft for 9C/27C. Width: 9R/27L to
  150 ft. Pavement condition per runway (Tables 4-21 to 4-24). Safety areas (4-25 to 4-27). Width-deficient taxiways
  R and S (4-28). Taxiway PCI (4-29).
- **Terminal.** Gates from 16 to 19 by PAL 4 (Table 4-32). Space by function, existing against PAL 4 (Table 4-42).
  Ticketing grows from 11,648 to 29,452 sq ft. Hold rooms grow from 61,604 to 66,918 sq ft. Screening lanes grow
  from 8 to 12.
- **General aviation.** T-hangars short by 17 units at baseline and 87 by PAL GA 4. Conventional hangar space turns
  short at PAL GA 3 (Tables 4-43 to 4-54).
- **Landside.** Road volume over capacity on Airport Boulevard by PAL 2 (Table 4-55). Curb, long-term,
  hourly, employee and rental car needs (4-56 to 4-62). The long-term need reaches 5,156 spaces by PAL 4.
- **Support.** Jet-A storage turns short from PAL 1 (Table 4-63). The ATCT fails the FAA siting criteria.

### 5. Development Alternatives (pages 279 to 334)

Three alternatives (Figures 5-1 to 5-6) for runways, taxiways, aprons, terminal gates and services, GA, landside,
support and ancillary items (Tables 5-2 to 5-12). Alternatives 1 and 2 tied at nine points and Alternative 3 scored
minus two (Figure 5-23). The preferred alternative (Tables 5-13 to 5-19, Figures 5-24 to 5-27):

- 9R/27L gets a split extension to 7,200 ft. 18/36 becomes a TDG 5, ADG V taxiway, with part of it removed. The 27C
  end moves 643 ft east. 9L/27R stays as it is.
- Full parallel taxiways north of 9L/27R (Taxiway A) and north of 9R/27L (Taxiway E). Taxiway M is extended.
- Three new gates for ADG III to V with a 61,400 sq ft east terminal expansion and 37,447 sq yd of apron. Gate 16
  is upgraded with a 12,600 sq ft west expansion and the flight kitchen moves.
- About 100,800 sq ft of conventional hangars and 90 T-hangar units.
- A five-level garage of about 4,000 spaces and a ConRAC ready/return structure of 2,250 spaces.
- The ATCT moves east. A secondary maintenance facility. Property acquisition of 225.90 acres. A 39.34-acre solar farm.

The August 2021 draft differs from the final in eight statements. Its section 5.4 is a placeholder for cost
estimates, which the final moved to Chapter 7. It counts 3 surplus T-hangar units where the final counts 1, and it
says "RAC" where the final says "ConRAC".

### 6. Environmental Overview (pages 335 to 372)

Each NEPA category in turn (sections 6.2 to 6.21). Listed species for Seminole County (Tables 6-1 to 6-4). Sites with recognized
environmental concerns (Table 6-5) and the closed landfill east of 18/36. Noise: the off-airport 65 DNL area grows
from 73.5 acres in 2017 to 229 acres at PAL 3. The Executive Summary counts 22 noise-sensitive areas in 2017 and
Table 6-6 totals 25. With the preferred airfield it falls to
146.3 acres at PAL 4 (Table 6-6, Figures 6-4 to 6-18). Seven wetland areas from the National Wetlands Inventory
(Figure 6-19). Floodplains (Figure 6-3).

### 7. Financial Plan (pages 373 to 408)

Historical operating statistics, revenues and expenses for 2015 to 2020 (Tables 7-1, 7-3, 7-4). The capital
programme (Table 7-2, below). Forecast revenues and expenses (7-5 to 7-8). Funding by phase and source (7-9 to
7-11). With 3 percent a year inflation the programme is $1,163,423,600 (Table 7-9). That figure includes debt
service on the recent terminal expansion. The Local/PFC gap is $297.4 million.

### 8 to 10. Public involvement, Airport Layout Plan, sustainability (pages 409 to 438)

Chapter 8 records the advisory committee and the public meeting. Chapter 9 describes the ALP sheets. The sheets
themselves are in Volume II, Appendix J, which we do not hold. Chapter 10 holds the sustainability survey, the initiatives and the action plan (Tables 10-1 to 10-5).

## The capital improvement programme (Table 7-2)

Costs are 2021 estimates before inflation. The phase bands in the table are near term (0 to 5 years), mid term (5 to
10) and long term (10 to 20).

| # | Project | Phase | Federal | State | Local/PFC | Private | Estimated cost |
|---:|---|---|---:|---:|---:|---:|---:|
| 1 | Relocated Maintenance Complex | 1 (2022-2026) | $0 | $3,950,000 | $3,950,000 | $0 | $7,900,000 |
| 2 | Taxiway A3 Relocation | 1 (2022-2026) | $4,770,000 | $265,000 | $265,000 | $0 | $5,300,000 |
| 3 | Taxiway K1 Relocation | 1 (2022-2026) | $2,610,000 | $145,000 | $145,000 | $0 | $2,900,000 |
| 4 | Taxiway M Extension | 1 (2022-2026) | $4,500,000 | $250,000 | $250,000 | $0 | $5,000,000 |
| 5 | Taxiway P Removal & Relocate Compass Calibration Pad | 1 (2022-2026) | $1,080,000 | $60,000 | $60,000 | $0 | $1,200,000 |
| 6 | New 35,000 SF Conventional Hangar | 1 (2022-2026) | $0 | $3,150,000 | $3,150,000 | $0 | $6,300,000 |
| 7 | South East Ramp Expansions - Phase 1B and 2A | 1 (2022-2026) | $0 | $0 | $5,500,000 | $7,100,000 | $12,600,000 |
| 8 | Storm Pond Expansion | 1 (2022-2026) | $11,340,000 | $630,000 | $630,000 | $0 | $12,600,000 |
| 9 | New Fire Station | 1 (2022-2026) | $0 | $0 | $4,100,000 | $0 | $4,100,000 |
| 10 | Solar Farm Development | 1 (2022-2026) | $0 | $0 | $4,000,000 | $21,600,000 | $25,600,000 |
| 11 | Obstruction Survey | 1 (2022-2026) | $225,000 | $12,500 | $12,500 | $0 | $250,000 |
| 12 | Design & Construct FIS Improvements | 1 (2022-2026) | $0 | $8,000,000 | $8,000,000 | $0 | $16,000,000 |
| 13 | Taxiway A - Full Parallel Taxiway System | 2 (2027-2031) | $43,200,000 | $2,400,000 | $2,400,000 | $0 | $48,000,000 |
| 14 | Runway 9L-27R Reconstruction | 2 (2027-2031) | $80,820,000 | $4,490,000 | $4,490,000 | $0 | $89,800,000 |
| 15 | GA Apron Expansion | 2 (2027-2031) | $0 | $0 | $3,100,000 | $0 | $3,100,000 |
| 16 | Runway 9R-27L Upgrades - Split Extension to a Total Length of 7,200 Feet | 2 (2027-2031) | $39,600,000 | $2,200,000 | $2,200,000 | $0 | $44,000,000 |
| 17 | Construct New Parallel Taxiway North of Runway 9R-27L | 2 (2027-2031) | $18,990,000 | $1,055,000 | $1,055,000 | $0 | $21,100,000 |
| 18 | Runway 18-36 Conversion | 2 (2027-2031) | $8,100,000 | $450,000 | $450,000 | $0 | $9,000,000 |
| 19 | South East Ramp Expansions - Phase 1A, 2A, and 2B | 2 (2027-2031) | $0 | $0 | $1,148,000 | $19,252,000 | $20,400,000 |
| 20 | Construct 4-Level Consolidated Rental Auto Center (ConRAC) Garage | 2 (2027-2031) | $0 | $0 | $148,800,000 | $0 | $148,800,000 |
| 21 | Construct 5-Level Parking Garage | 2 (2027-2031) | $0 | $74,600,000 | $74,600,000 | $0 | $149,200,000 |
| 22 | Widen Airport Boulevard | 2 (2027-2031) | $0 | $3,200,000 | $3,200,000 | $0 | $6,400,000 |
| 23 | Runway 9C-27C Eastward Extension and Taxiway C Improvements/Extension | 3 (2032-2041) | $5,670,000 | $315,000 | $315,000 | $0 | $6,300,000 |
| 24 | Taxiway B Improvements | 3 (2032-2041) | $1,800,000 | $100,000 | $100,000 | $0 | $2,000,000 |
| 25 | Taxiway S Improvements | 3 (2032-2041) | $1,800,000 | $100,000 | $100,000 | $0 | $2,000,000 |
| 26 | Taxiway U Improvements | 3 (2032-2041) | $450,000 | $25,000 | $25,000 | $0 | $500,000 |
| 27 | South East Ramp Expansions - Phase 2A, 3, and 4 | 3 (2032-2041) | $0 | $0 | $2,165,000 | $28,635,000 | $30,800,000 |
| 28 | Commercial Terminal Gate Modifications/Expansion | 3 (2032-2041) | $20,000,000 | $5,625,000 | $86,875,000 | $0 | $112,500,000 |
| 29 | Commercial Terminal Services Modifications | 3 (2032-2041) | $0 | $2,160,000 | $41,040,000 | $0 | $43,200,000 |
| 30 | Relocate ATCT | 3 (2032-2041) | $11,250,000 | $625,000 | $625,000 | $0 | $12,500,000 |
| 31 | Jet-A Fuel Storage Expansion | 3 (2032-2041) | $0 | $0 | $1,050,000 | $1,350,000 | $2,400,000 |
| 32 | Rail Access Expansion | 3 (2032-2041) | $0 | $0 | $1,990,000 | $1,610,000 | $3,600,000 |
| | **Subtotal Phase 1** | | $24,525,000 | $16,462,500 | $30,062,500 | $28,700,000 | **$99,750,000** |
| | **Subtotal Phase 2** | | $190,710,000 | $88,395,000 | $241,443,000 | $19,252,000 | **$539,800,000** |
| | **Subtotal Phase 3** | | $40,970,000 | $8,950,000 | $134,285,000 | $31,595,000 | **$215,800,000** |
| | **Grand Totals** | | $256,205,000 | $113,807,500 | $405,790,500 | $79,547,000 | **$855,350,000** |

## What maps to the twin

`twin_coverage` in the database lists each thing the plan names, the twin id it maps to, how many facts name it,
the plan stage it feeds (from `docs/plans/mission-studio-interchange-collector.md` in StellarView), the RFP
requirements it touches and its sensor class. The mapping is by the words in each record, so a count is a count of
mentions.

What the twin already holds and the plan describes:

| Plan names | Twin id | Facts | Stage | What the plan adds |
|---|---|---:|---|---|
| The terminal, its gates, FIS and Gates 1 to 4 | `terminal`, `terminal-intl`, `terminal-east` | 755 | names | Space by function, existing and by PAL (Tables 4-31 to 4-42) |
| Runways 9L/27R, 9R/27L, 9C/27C, 18/36 | `rwy-*` | 627 | map | Pavement condition by section, safety areas, declared distances, critical aircraft, future length and use |
| Aprons | `surf-aprons` | 219 | map | Apron areas and condition, the apron expansions |
| Gates and boarding bridges | `boarding-bridge` | 164 | inventory | Gate 16 limited to a regional jet; 19 gates by PAL 4 |
| Fuel | `fuel-farm` | 136 | inventory | 24 tanks with owner, place, capacity and grade (Table 2-10); 7-day storage need (Table 4-63) |
| Baggage make-up and claim | `makeup-unit`, `claim-carousel` | 141 | inventory | Areas, EDS machines, claim devices by PAL (Table 4-38) |
| Parking lots and the garage | `parking-lot`, `garage` | 114 | inventory | Capacity of each lot (Figure 2-22), demand by PAL (Tables 4-59 to 4-61) |
| Rental cars | `rental-cars` | 101 | names | Ready, return and QTA needs (Table 4-62) |
| ILS, PAPI, MALSR, REIL, edge lights, ASOS, wind cones | asset classes | 119 | sense | Which runway end has which aid; SAA's condition reports |
| The ATCT | `atct` | 12 | map | Commissioned 1993, finished 1996, past its useful life, to move east |

## Gaps: what the plan states and the twin lacks

1. **Named buildings outside the terminal.** The plan names and sizes the ARFF station, airport maintenance, the
   flight kitchen, the police station with badging and the goods-in dock, the cargo building (about 53,000 sq ft),
   MillionAir (30,955 sq ft main facility, 24,000 and 14,400 sq ft hangars), the SAA's 44,000 sq ft hangar, CE
   Avionics, Constant Aviation, Hill Dermaceuticals (65,000 sq ft), the L3Harris buildings, the South East Ramp
   complex (24 buildings) with the GSA hangar, the Avocet hangar and the Allegiant training centre. In the twin
   these are OSM footprints called "Building" or "Hangar", with no name, use or area. Figures 2-24 and 2-25 place
   them. This is work for the Names stage.
2. **Planned projects.** The twin holds no future state. Thirty-two CIP projects, the preferred alternative's
   parcels and the moved ATCT, maintenance area, fire station, solar farm, ConRAC and 4,000-space garage have no
   place in it. Neither do the runway changes (9R/27L to 7,200 by 150 ft, 18/36 to a taxiway, 27C 643 ft east).
3. **Taxiways one by one.** The plan names about twenty taxiways and connectors (A, A3, B, B2, C, E, K, K1, L, M, P,
   R, S and S1 to S5, T, U) with design groups, widths and PCI (Tables 4-28, 4-29). The twin has one item for all
   taxiways and assumes 75 ft widths. Taxiways R and S vary from 50 to 75 ft and 35 to 50 ft.
4. **Forecasts and activity levels.** No forecast, PAL or peak-hour figure is in the twin. The stated plan's 3, 5
   and 10 year projection can start from Table 3-33 and the PAL map in this database.
5. **Parking capacities.** Each lot in `asset-list.json` says "not yet captured". Figure 2-22 gives most of them.
6. **Fuel tanks.** One unplaced fuel farm on the shelf against 24 tanks in Table 2-10.
7. **Utilities.** Figure 2-26 draws water, sewer, force mains, gas, lift stations, manholes and hydrants. The
   twin's water, gas, sewer and hydrant records are unplaced or on the shelf.
8. **Environment.** Noise contours by PAL, the seven wetland areas, the floodplains and the closed landfill east
   of 18/36. The twin has ponds and drainage layers only.
9. **Terminal areas by function.** Table 4-42 gives existing square feet for ticketing, screening, FIS, hold rooms,
   concessions, baggage and services. The traced sections in the twin have functions but no totals to set against
   these.
10. **Sensing.** The ARFF station, the fuel tanks and the ATCT have no class in `04-plan/sensor-plan.json`.

## What could not be read

- **Forty-two figures are pictures with no text layer** (marked "image only" above). Their records hold the caption
  and the sentence that introduces each one. Among them: the existing facilities map (2-7), the APER pavement charts
  (2-8 to 2-14), the terminal alternative floor plans (5-10 to 5-18, 5-26, 5-27), the evaluation matrix (5-23),
  floodplains (6-3) and wetlands (6-19). The evaluation totals are stated in the text.
- **Drawing labels have no position.** The 49 full-page drawings give their labels in reading order. A label such
  as "50.80 ACRES" on Figure 5-24 says how big a parcel is but not which parcel. The legend colours (aeronautical,
  non-aeronautical, acquisition) are not in the text layer.
- **Volume II was not read.** It holds the detailed CIP cost estimates (Appendix D), the forecast supplements
  (Appendix C) and the ALP sheet set (Appendix J). We do not hold it.
- **Complex table layouts.** Cell-to-column matching uses printed positions. Tables with labels set beside
  wrapped headers (4-63 fuel, 6-6 noise, 3-31 peak) carry some cells under the wrong column label. The row record
  beside each cell keeps the printed row, so a cell can be checked.
- **Internal differences in the plan.** Section 7.2 gives inflated phase totals of $109.0, $683.8 and $336.2 million.
  Table 7-9 gives $126.2, $701.0 and $336.2 million, because it adds terminal debt service. The noise counts differ
  between the Executive Summary and Table 6-6. Both are recorded as printed.

## Every table and figure

Titles as printed, with dashes made plain. The page is the PDF page. "Facts" counts the cell, row and label records
under each one.

### Volume I tables (163)

| No. | Title | Page | How it was read | Facts |
|---|---|---:|---|---:|
| 1-1 | Preferred Passenger Enplanement Forecast Summary | 16 | text layer | 12 |
| 1-2 | Based Aircraft Fleet Mix Distribution | 16 | text layer | 5 |
| 1-3 | Preferred Based Aircraft Forecast Summary | 17 | text layer | 4 |
| 1-4 | Preferred Aircraft Operations Forecast Summary | 17 | text layer | 20 |
| 1-5 | Annual Service Volume | 18 | text layer | 8 |
| 1-6 | Critical Aircrafts Summary | 19 | text layer | 5 |
| 1-7 | Future Runway Length Requirements Summary | 20 | text layer | 12 |
| 1-8 | Future Runway Width Requirements Summary | 20 | text layer | 12 |
| 1-9 | Aircraft Gate Requirements Summary | 21 | text layer | 2 |
| 1-10 | Ticketing/Check-In Area Requirements | 22 | text layer | 29 |
| 1-11 | TSA Passenger Screening and FIS Requirements Summary | 22 | text layer | 52 |
| 1-12 | Baggage Handling Facility Requirements Summary | 23 | text layer | 41 |
| 1-13 | Terminal Service Requirements Summary | 24 | text layer | 21 |
| 1-14 | General Aviation Facility Requirements Summary | 24 | text layer | 25 |
| 1-15 | Preferred Airside Development Alternative Summary | 27 | text layer | 23 |
| 2-1 | Runway Specifications | 53 | text layer | 28 |
| 2-2 | Declared Distances | 54 | text layer | 34 |
| 2-3 | Aircraft Approach Category (AAC) | 59 | text layer | 5 |
| 2-4 | Airplane Design Group (ADG) | 60 | text layer | 6 |
| 2-5 | Visibility Minimums | 60 | text layer | 6 |
| 2-6 | SFB’s Existing RDCs | 60 | text layer | 4 |
| 2-7 | Runway and Taxiway Safety Area Dimensions | 63 | text layer | 36 |
| 2-8 | Runway Protection Zone Dimensions | 64 | text layer | 28 |
| 2-9 | SFB Instrument Approach Procedure Summary | 67 | text layer | 7 |
| 2-10 | Existing Fuel Tank Facilities | 95 | text layer | 48 |
| 2-11 | Airports Surrounding Orlando Sanford International Airport (SFB) | 104 | text layer | 16 |
| 3-1 | Historical and Forecast GDP Growth (CY 1997-2037) | 116 | text layer | 41 |
| 3-2 | Historical and Forecast Population Growth (CY 1997-2017) | 118 | text layer | 41 |
| 3-3 | Non-Agriculture Employment (June 2017 to June 2018) | 119 | text layer | 79 |
| 3-4 | Historical and Forecast Employment Growth (CY 1997-2017) | 122 | text layer | 41 |
| 3-5 | Market Area Leading Employers | 122 | text layer | 10 |
| 3-6 | TAF vs. SAA Historical Enplanements - Five Year Average Difference | 124 | text layer | 26 |
| 3-7 | Enplanement Trend Analysis | 125 | text layer | 99 |
| 3-8 | Enplanement Regression Analysis | 127 | text layer | 226 |
| 3-9 | Enplanement Market Share Analysis | 131 | text layer | 463 |
| 3-10 | Enplanement Forecast Comparison | 133 | text layer | 387 |
| 3-11 | Preferred Enplanement Forecast Comparison - Domestic and International Split | 135 | text layer | 120 |
| 3-12 | Historical Based Aircraft | 136 | text layer | 11 |
| 3-13 | Based Aircraft Trend Analysis | 137 | text layer | 99 |
| 3-14 | Based Aircraft Regression Analysis | 139 | text layer | 222 |
| 3-15 | Based Aircraft Market Share Analysis | 143 | text layer | 470 |
| 3-16 | Based Aircraft Forecast Comparison | 145 | text layer | 399 |
| 3-17 | Preferred Based Aircraft Forecast | 147 | text layer | 66 |
| 3-18 | Preferred Based Aircraft Fleet Mix Forecast | 148 | text layer | 132 |
| 3-19 | Total Operations Forecast by Year | 151 | text layer | 100 |
| 3-20 | Air Carrier Operations and Fleet Mix Forecast | 152 | text layer | 55 |
| 3-21 | Air Cargo Tonnage Forecast | 153 | text layer | 96 |
| 3-22 | GA and Air Taxi Operations OPBA Forecast | 155 | text layer | 101 |
| 3-23 | GA and Air Taxi/Commuter Trend Analysis | 156 | text layer | 99 |
| 3-24 | GA and Air Taxi Operations Regression Analysis | 159 | text layer | 222 |
| 3-25 | GA Operations and Air Taxi/Commuter Market Share Analysis | 163 | text layer | 466 |
| 3-26 | GA and Air Taxi/Commuter Operations Forecast Comparison | 165 | text layer | 419 |
| 3-27 | GA and Air Taxi Operations Forecast | 169 | text layer | 216 |
| 3-28 | GA Operations - Historical Itinerant and Local Shares | 171 | text layer | 55 |
| 3-29 | GA Operations - Itinerant and Local Forecast | 171 | text layer | 120 |
| 3-30 | Military Operations Forecast | 172 | text layer | 63 |
| 3-31 | Peak Activity Forecast | 175 | text layer | 155 |
| 3-32 | Master Plan Forecasts Comparison to TAF | 177 | text layer | 54 |
| 3-33 | Enplanements and Operations Summary | 179 | text layer | 429 |
| 4-1 | Aircraft Approach Category | 184 | text layer | 5 |
| 4-2 | Airplane Design Group (ADG) | 184 | text layer | 6 |
| 4-3 | Runway Design Code | 185 | text layer | 110 |
| 4-4 | Operations by TDG | 187 | text layer | 38 |
| 4-5 | Existing Critical Aircraft Requirements | 189 | text layer | 21 |
| 4-6 | Future Critical Aircraft Requirements | 190 | text layer | 21 |
| 4-7 | Future TDG Required Width | 190 | text layer | 47 |
| 4-8 | Airfield Operational Configurations | 192 | text layer | 14 |
| 4-9 | Aircraft Characteristics | 192 | text layer | 5 |
| 4-10 | SFB Annual Operations by Aircraft Classification - TFMSC | 193 | text layer | 23 |
| 4-11 | Usable Runway Exits | 194 | text layer | 8 |
| 4-12 | Hourly Capacity | 196 | text layer | 16 |
| 4-13 | Annual Service Volume Calculation | 197 | text layer | 66 |
| 4-14 | Demand vs. Airfield Capacity | 198 | text layer | 19 |
| 4-15 | Average Aircraft Delay | 200 | text layer | 24 |
| 4-16 | Public-Use Airports Near SFB | 201 | text layer | 60 |
| 4-17 | Runway Designation Calculation | 220 | text layer | 14 |
| 4-18 | Airplane Weight Categorization for Runway Length Requirements | 221 | text layer | 4 |
| 4-19 | Takeoff Distance Requirements Summary | 227 | text layer | 75 |
| 4-20 | Runway Width Requirements | 229 | text layer | 7 |
| 4-21 | Runway 9L/27R Pavement Condition Summary | 230 | text layer | 33 |
| 4-22 | Runway 9R/27L Pavement Condition Summary | 233 | text layer | 10 |
| 4-23 | Runway 9C/27C Pavement Condition Summary | 233 | text layer | 9 |
| 4-24 | Runway 18/36 Pavement Condition Summary | 234 | text layer | 93 |
| 4-25 | Existing & Future Runway Safety Area (RSA) Dimensions | 235 | text layer | 7 |
| 4-26 | Existing & Future Runway Object Free Area Dimensions | 235 | text layer | 9 |
| 4-27 | Existing & Future Runway Protection Zone Dimensions | 236 | text layer | 33 |
| 4-28 | Width Deficient Taxiways | 237 | text layer | 4 |
| 4-29 | Taxiway Pavement Condition | 238 | text layer | 36 |
| 4-30 | Taxiway Protective Surfaces Dimensions | 239 | text layer | 76 |
| 4-31 | Peak Hour Passenger, Operations, and Aircraft Assumptions | 244 | text layer | 40 |
| 4-32 | Aircraft Gate Requirements | 245 | text layer | 6 |
| 4-33 | Ticketing/Check-In Area Requirements | 246 | text layer | 28 |
| 4-34 | Security Screening Checkpoint | 248 | text layer | 52 |
| 4-35 | Hold Rooms | 249 | text layer | 21 |
| 4-36 | Concessions Requirement | 250 | text layer | 63 |
| 4-37 | Concessions Requirement by Concourse | 251 | text layer | 49 |
| 4-38 | Baggage Facilities | 252 | text layer | 41 |
| 4-39 | Restroom Requirements | 253 | text layer | 46 |
| 4-40 | Meet and Greet Area | 253 | text layer | 16 |
| 4-41 | Terminal Services | 254 | text layer | 21 |
| 4-42 | Terminal Requirements Summary | 255 | text layer | 56 |
| 4-43 | Planning Activity Level - General Aviation Characteristics | 256 | text layer | 25 |
| 4-44 | General Aviation Terminal Requirements | 257 | text layer | 25 |
| 4-45 | Aircraft Storage Assumptions | 258 | text layer | 15 |
| 4-46 | Aircraft Space Requirements (Conventional/Box Hangars) | 258 | text layer | 3 |
| 4-47 | Existing Based Aircraft Storage Hangars | 259 | text layer | 9 |
| 4-48 | Conventional Hangar Requirements | 260 | text layer | 40 |
| 4-49 | T-Hangar Requirements | 260 | text layer | 30 |
| 4-50 | Space Requirements for Based Aircraft Type | 261 | text layer | 5 |
| 4-51 | Existing Based Aircraft Apron | 262 | text layer | 6 |
| 4-52 | General Aviation Based Aircraft Apron Requirements | 262 | text layer | 35 |
| 4-53 | Commercial Jet Based Aircraft Apron Requirements | 262 | text layer | 20 |
| 4-54 | General Aviation Itinerant Aircraft Apron Requirements | 263 | text layer | 25 |
| 4-55 | Access Roadway Volume/Capacity | 265 | text layer | 40 |
| 4-56 | Baseline Passenger Distribution Assumptions | 266 | text layer | 21 |
| 4-57 | Baseline Curb Requirements | 267 | text layer | 80 |
| 4-58 | Curb Requirements Baseline - PAL 4 | 268 | text layer | 19 |
| 4-59 | Long-Term Parking Requirements | 270 | text layer | 50 |
| 4-60 | Hourly Parking Requirements | 271 | text layer | 7 |
| 4-61 | Employee Parking Requirements | 272 | text layer | 6 |
| 4-62 | Rental Car Facility Requirements | 273 | text layer | 91 |
| 4-63 | Fuel Storage Facility Requirements | 275 | text layer | 62 |
| 5-1 | Evaluation Criteria for Preferred Development Alternative | 281 | text layer | 7 |
| 5-2 | Runway Modifications Summary | 289 | text layer | 5 |
| 5-3 | Existing & Proposed Runway 9R-27L Declared Distances | 290 | text layer | 24 |
| 5-4 | FAA’s Parallel Runway Design Separation Requirements | 291 | text layer | 6 |
| 5-5 | Taxiway Modifications Summary | 295 | text layer | 36 |
| 5-6 | Apron Modifications Summary | 301 | text layer | 4 |
| 5-7 | Development Alternative 1: Gate Alternatives Summary | 303 | text layer | 11 |
| 5-8 | Development Alternative 2: Gate Alternatives Summary | 304 | text layer | 15 |
| 5-9 | Development Alternative 3: Gate Alternatives Summary | 304 | text layer | 17 |
| 5-10 | General Aviation Modifications Summary | 311 | text layer | 9 |
| 5-11 | Support Facility Modifications Summary | 318 | text layer | 15 |
| 5-12 | Ancillary Modifications Summary | 321 | text layer | 18 |
| 5-13 | Preferred Runway Modifications Summary | 328 | text layer | 4 |
| 5-14 | Preferred Taxiway Modifications Summary | 331 | text layer | 12 |
| 5-15 | Proposed Apron Modifications Summary | 331 | text layer | 3 |
| 5-16 | Preferred Commercial Terminal Gate Modifications | 332 | text layer | 1 |
| 5-17 | Preferred General Aviation Modifications Summary | 333 | text layer | 2 |
| 5-18 | Preferred Support Facility Modifications Summary | 334 | text layer | 4 |
| 5-19 | Preferred Ancillary Modifications Summary | 334 | text layer | 6 |
| 6-1 | Seminole County Listed Species: Miscellaneous | 345 | text layer | 5 |
| 6-2 | Seminole County Listed Species: Insects | 346 | text layer | 10 |
| 6-3 | Seminole County Listed Species: Animals | 346 | text layer | 6 |
| 6-4 | Seminole County Listed Species: Vegetation | 348 | text layer | 3 |
| 6-5 | Active Sites with Recognized Environmental Concerns | 352 | text layer | 35 |
| 6-6 | AEDT Noise Contour 65 DNL Off-Airport Impact Areas | 359 | text layer | 115 |
| 7-1 | Historical Background Operating Statistics | 377 | text layer | 56 |
| 7-2 | SFB Capital Improvement Program by Eligible Funding Source | 379 | page image, read by eye | 36 |
| 7-3 | SFB Historical Revenues: 2015-2020 | 383 | text layer | 120 |
| 7-4 | SFB Historical Expenses and Net Revenues: 2015-2020 | 386 | text layer | 112 |
| 7-5 | Forecast of Operating Revenues and Expenses | 391 | text layer | 200 |
| 7-6 | Forecast of Operating Revenues and Expenses (Continued) | 392 | text layer | 220 |
| 7-7 | Forecast of Partial Non-Operating Revenues (Not including FAA discretionary or local funding) | 399 | text layer | 140 |
| 7-8 | Forecast of Minimum Net Revenues Available for CIP | 401 | text layer | 105 |
| 7-9 | Summary of SFB ACIP with Monetary Inflation Escalators by Phase | 402 | text layer | 20 |
| 7-10 | Funding Needs by Phase and Eligible Source* | 404 | text layer | 64 |
| 7-11 | Funding Needs by Phase and Eligible Source for Contingency Planning* | 406 | text layer | 60 |
| 10-1 | Survey 1 - Airport Sustainability Initiative Rankings | 422 | text layer | 4 |
| 10-2 | Committee Suggested ‘Open Response’ Initiatives from Survey 1 | 424 | text layer | 20 |
| 10-3 | Potential Airport Sustainability Initiatives | 429 | text layer | 42 |
| 10-4 | Model Performance Tracking Matrix - ‘Management Performance Scale’ | 433 | text layer | 29 |
| 10-5 | SFB Airport Sustainability Action Plan | 436 | text layer | 42 |

### Volume I figures (123)

| No. | Title | Page | How it was read | Facts |
|---|---|---:|---|---:|
| 1-1 | Steps in the Master Planning Process | 34 | image only | 0 |
| 2-1 | Location Map | 40 | drawing labels | 0 |
| 2-2 | Vicinity Map | 41 | drawing labels | 0 |
| 2-3 | NPIAS Airport Classifications | 42 | image only | 0 |
| 2-4 | VFR Wind Rose | 49 | drawing labels | 0 |
| 2-5 | IFR Wind Rose | 50 | drawing labels | 0 |
| 2-6 | All Weather Wind Rose | 51 | drawing labels | 0 |
| 2-7 | Existing Airport Facilities | 52 | image only | 0 |
| 2-8 | APER's Figure 3.1.2 - Average Age of Pavement at Inspection | 56 | image only | 0 |
| 2-9 | APER’s Figure 3.1.3 - Airfield Pavement Functional Classification Use by Area | 56 | image only | 0 |
| 2-10 | APER’s Figure 3.1.4 (a) - Pavement Surface Type by Area (SF) | 57 | image only | 0 |
| 2-11 | APER’s Figure 4.1.1 - Latest Condition - Overall Network | 57 | image only | 0 |
| 2-12 | APER’s Figure 4.1.2 (a) - Latest Condition - Runway Pavements | 58 | image only | 0 |
| 2-13 | APER’s Figure 4.1.2 (b) - Latest Condition - Taxiway Pavements | 58 | image only | 0 |
| 2-14 | APER’s Figure 4.1.2 (c) - Latest Condition - Apron Pavements | 59 | image only | 0 |
| 2-15 | SFB’s Airfield Pavement Condition Index | 61 | drawing labels | 0 |
| 2-16 | Terminal Gates 10 - 16 First Floor | 69 | drawing labels | 8 |
| 2-17 | Terminal Gates 10 - 16 Second Floor | 73 | drawing labels | 9 |
| 2-18 | Terminal Gates 5 - 9 First Floor | 74 | drawing labels | 8 |
| 2-19 | Terminal Gates 5 - 9 Second Floor | 75 | drawing labels | 7 |
| 2-20 | Terminal Gates 1 - 4 First Floor | 77 | drawing labels | 4 |
| 2-21 | Terminal Gates 1 - 4 Second Floor | 78 | drawing labels | 4 |
| 2-22 | Vehicle Facilities ≤ Half Mile from the Terminal Area | 81 | drawing labels | 12 |
| 2-23 | Vehicle Facilities ≥ Half Mile & ≤ 1 Mile from the Terminal Area | 82 | drawing labels | 5 |
| 2-24 | General Aviation, Cargo, and Other Tenant Facilities | 85 | drawing labels | 0 |
| 2-25 | Airport Support Facilities | 93 | drawing labels | 0 |
| 2-26 | Existing Utility Network | 97 | drawing labels | 0 |
| 2-27 | U.S. Airspace Classifications | 101 | drawing labels | 2 |
| 2-28 | Regional Airspace | 102 | drawing labels | 0 |
| 2-29 | Existing Off-Airport Zoning Districts | 106 | image only | 0 |
| 2-30 | Existing On-Airport Land Use | 107 | drawing labels | 0 |
| 3-1 | Market Area Map | 114 | image only | 0 |
| 3-2 | Historic Annual Growth of GDP (CY 1997-2017) | 115 | caption and figure text | 0 |
| 3-3 | Historic Annual Growth of Population (CY 1997-2017) | 117 | caption and figure text | 0 |
| 3-4 | Market Area Employment By Industry | 120 | caption and figure text | 0 |
| 3-5 | Historic Annual Growth of Employment (CY 1997-2017) | 121 | caption and figure text | 0 |
| 3-6 | Historical GA and Air Taxi/Commuter Operations | 154 | image only | 0 |
| 4-1 | Taxiway Design Groups | 187 | image only | 0 |
| 4-2 | Average Delay Chart from AC 150/5060-5 | 199 | image only | 0 |
| 4-3 | Instrument Approach Procedures Symbol Legend | 202 | drawing labels | 0 |
| 4-4 | SFB's and ORL's Converging Instrument Approach Procedures | 204 | drawing labels | 4 |
| 4-5 | SFB's and DED's Converging Instrument Approach Procedures - 1 | 205 | drawing labels | 4 |
| 4-6 | SFB's and DED's Converging Instrument Approach Procedures - 2 | 206 | drawing labels | 5 |
| 4-7 | SFB's and X50's Converging Instrument Approach Procedures - 1 | 207 | drawing labels | 5 |
| 4-8 | SFB's and X50's Converging Instrument Approach Procedures - 2 | 209 | drawing labels | 5 |
| 4-9 | SFB's and MCO's Converging Instrument Approach Procedures - 1 | 210 | drawing labels | 6 |
| 4-10 | SFB's and MCO's Converging Instrument Approach Procedures - 2 | 211 | drawing labels | 4 |
| 4-11 | SFB's and MCO's Converging Instrument Approach Procedures - 3 | 212 | drawing labels | 3 |
| 4-12 | SFB's and EVB's Converging Instrument Approach Procedures - 1 | 213 | drawing labels | 5 |
| 4-13 | SFB's and EVB's Converging Instrument Approach Procedures - 2 | 214 | drawing labels | 4 |
| 4-14 | SFB's and X21's Converging Instrument Approach Procedures - 1 | 215 | drawing labels | 5 |
| 4-15 | SFB's and X21's Converging Instrument Approach Procedures - 2 | 216 | drawing labels | 4 |
| 4-16 | SFB's and DAB's Converging Instrument Approach Procedures | 218 | drawing labels | 5 |
| 4-17 | Boeing 787-8 Takeoff Distance - Standard Day (59°F) Temperature | 223 | caption and figure text | 0 |
| 4-18 | Boeing 787-8 Takeoff Distance - Standard Day + 45°F (104°F) Temperature | 223 | caption and figure text | 0 |
| 4-19 | Airbus A320 - Takeoff Distance Required - Standard Day (59°F) | 224 | caption and figure text | 0 |
| 4-20 | A320 - Takeoff Distance Required - Standard Day +59F (118F) | 225 | caption and figure text | 0 |
| 4-21 | Runway 9C/27C Required Runway Length per FAA AC 150/5325-4B's Figure 2-2 | 226 | image only | 0 |
| 4-22 | Runway Landing Length Requirements | 229 | caption and figure text | 0 |
| 4-23 | SFB Airfield Pavement Condition Map | 231 | drawing labels | 0 |
| 4-24 | Typical Two-Lane SSCP with AIT | 247 | image only | 0 |
| 4-25 | Highway Capacity Manual Roadway Capacity | 264 | caption and figure text | 0 |
| 4-26 | Peak Parking Occupancy Curve | 269 | caption and figure text | 0 |
| 4-27 | Long-Term Parking Requirements Summary | 271 | caption and figure text | 0 |
| 5-1 | Development Alternative 1 | 283 | drawing labels | 30 |
| 5-2 | Development Alternative 2 | 284 | drawing labels | 31 |
| 5-3 | Development Alternative 3 | 285 | drawing labels | 23 |
| 5-4 | Landside Development Alternative 1 | 286 | drawing labels | 0 |
| 5-5 | Landside Development Alternative 2 | 287 | drawing labels | 0 |
| 5-6 | Landside Development Alternative 3 | 288 | drawing labels | 0 |
| 5-7 | Runway 9R/27L Development Alternative 1a - Declared Distances | 290 | image only | 0 |
| 5-8 | Runway 9R/27L Development Alternative 1b - Declared Distances | 292 | image only | 0 |
| 5-9 | Runway 9R/27L Development Alternative 2 - Declared Distances | 293 | image only | 0 |
| 5-10 | All Terminal Services Alternatives - Provide Second Floor Expansion | 305 | image only | 0 |
| 5-11 | International Arrivals Swap Alternative | 306 | image only | 0 |
| 5-12 | Terminal Services Development Alternatives Summary | 306 | image only | 0 |
| 5-13 | Terminal Services Development Alternative 1: First Floor | 308 | image only | 0 |
| 5-14 | Terminal Services Development Alternative 1: Second Floor | 308 | image only | 0 |
| 5-15 | Terminal Services Development Alternative 2: First Floor | 309 | image only | 0 |
| 5-16 | Terminal Services Development Alternative 2: Second Floor | 309 | image only | 0 |
| 5-17 | Terminal Services Development Alternative 3: First Floor | 310 | image only | 0 |
| 5-18 | Terminal Services Development Alternative 3: Second Floor | 310 | image only | 0 |
| 5-19 | Landside Facility Walkability Measurement | 314 | image only | 0 |
| 5-20 | Landside Development Alternative 1 | 315 | image only | 0 |
| 5-21 | Landside Development Alternative 2 | 316 | image only | 0 |
| 5-22 | Landside Development Alternative 3 | 317 | image only | 0 |
| 5-23 | Alternatives Evaluation Summary | 327 | image only | 0 |
| 5-24 | Preferred Development Alternative | 329 | drawing labels | 28 |
| 5-25 | Preferred Landside Development Alternative | 330 | drawing labels | 2 |
| 5-26 | Preferred Terminal Services Modifications - First Floor | 332 | image only | 0 |
| 5-27 | Preferred Terminal Services Modifications - Second Floor | 333 | image only | 0 |
| 6-1 | Section 4(f) | 342 | drawing labels | 0 |
| 6-2 | Unique Soils | 344 | image only | 0 |
| 6-3 | Floodplains | 350 | image only | 0 |
| 6-4 | Base Year (2017) Noise Exposure Map (NEM) | 355 | drawing labels | 4 |
| 6-5 | 65 DNL Impacted Area A | 357 | caption and figure text | 0 |
| 6-6 | 65 DNL Impacted Area B | 357 | caption and figure text | 0 |
| 6-7 | 65 DNL Impacted Area C | 357 | caption and figure text | 0 |
| 6-8 | 65 DNL Impacted Area D | 358 | caption and figure text | 0 |
| 6-9 | PAL 1 AEDT Noise Contours | 361 | drawing labels | 7 |
| 6-10 | PAL 2 AEDT Noise Contours | 362 | drawing labels | 8 |
| 6-11 | PAL 3 AEDT Noise Contours | 363 | drawing labels | 8 |
| 6-12 | PAL 4 AEDT Noise Contours | 364 | drawing labels | 10 |
| 6-13 | PAL 2 Area A2 | 365 | caption and figure text | 0 |
| 6-14 | PAL 2 Area A3 | 365 | caption and figure text | 0 |
| 6-15 | PAL 2 Area C2 | 365 | caption and figure text | 0 |
| 6-16 | PAL 4 Area D2 | 366 | caption and figure text | 0 |
| 6-17 | PAL 1 Area E | 366 | caption and figure text | 0 |
| 6-18 | PAL 4 Area F | 366 | caption and figure text | 0 |
| 6-19 | NWI Wetland Data | 371 | image only | 0 |
| 7-1 | Historical Enplanements and Operations | 377 | image only | 0 |
| 7-2 | Historical Operating Revenues by Source | 384 | caption and figure text | 0 |
| 7-3 | Change in Revenue Shares over Time (data from Table 1-3) | 385 | caption and figure text | 0 |
| 7-4 | Historical Operating Expenses by Category | 387 | caption and figure text | 0 |
| 7-5 | Change in Expense Shares over Time (data from Table 1-4) | 388 | caption and figure text | 0 |
| 7-6 | Forecast of Minimum Net Revenues by Source | 393 | caption and figure text | 0 |
| 7-7 | Growth in Revenues Available for CIP Funding | 402 | caption and figure text | 0 |
| 7-8 | PFC Eligible Versus CIP Available Funding | 405 | caption and figure text | 0 |
| 7-9 | Local Share Minus PFC Eligible Versus CIP Available Funding | 405 | caption and figure text | 0 |
| 10-1 | Sustainability Planning Process | 421 | caption and figure text | 0 |
| 10-2 | Four Focus Areas of Airport Sustainability - EONS | 424 | image only | 0 |
| 10-3 | OODA Loop / Boyd’s Cycle | 434 | caption and figure text | 0 |
| 10-4 | Excerpt of ACRP Report 119’s Table 4-2 - Sustainability Activity List, Including Performance | 434 | image only | 0 |

### Chapter 5 draft v1.3 tables (19)

Numbered and titled as in the final; pages are the draft's own.

| No. | Title | Page | How it was read | Facts |
|---|---|---:|---|---:|
| 5-1 | Evaluation Criteria for Preferred Development Alternative | 6 | text layer | 0 |
| 5-2 | Runway Modifications Summary | 15 | text layer | 0 |
| 5-3 | Existing & Proposed Runway 9R-27L Declared Distances | 16 | text layer | 0 |
| 5-4 | FAA’s Parallel Runway Design Separation Requirements | 17 | text layer | 0 |
| 5-5 | Taxiway Modifications Summary | 23 | text layer | 0 |
| 5-6 | Apron Modifications Summary | 27 | text layer | 0 |
| 5-7 | Development Alternative 1: Gate Alternatives Summary | 29 | text layer | 0 |
| 5-8 | Development Alternative 2: Gate Alternatives Summary | 30 | text layer | 0 |
| 5-9 | Development Alternative 3: Gate Alternatives Summary | 30 | text layer | 0 |
| 5-10 | General Aviation Modifications Summary | 37 | text layer | 0 |
| 5-11 | Support Facility Modifications Summary | 44 | text layer | 0 |
| 5-12 | Ancillary Modifications Summary | 46 | text layer | 0 |
| 5-13 | Preferred Runway Modifications Summary | 54 | text layer | 0 |
| 5-14 | Preferred Taxiway Modifications Summary | 57 | text layer | 0 |
| 5-15 | Proposed Apron Modifications Summary | 57 | text layer | 0 |
| 5-16 | Preferred Commercial Terminal Gate Modifications | 58 | text layer | 0 |
| 5-17 | Preferred General Aviation Modifications Summary | 59 | text layer | 0 |
| 5-18 | Preferred Support Facility Modifications Summary | 60 | text layer | 0 |
| 5-19 | Preferred Ancillary Modifications Summary | 60 | text layer | 0 |

### Chapter 5 draft v1.3 figures (27)

Numbered and titled as in the final; pages are the draft's own.

| No. | Title | Page | How it was read | Facts |
|---|---|---:|---|---:|
| 5-1 | Development Alternative 1 | 9 | drawing labels | 0 |
| 5-2 | Development Alternative 2 | 10 | drawing labels | 0 |
| 5-3 | Development Alternative 3 | 11 | drawing labels | 0 |
| 5-4 | Landside Development Alternative 1 | 12 | drawing labels | 0 |
| 5-5 | Landside Development Alternative 2 | 13 | drawing labels | 0 |
| 5-6 | Landside Development Alternative 3 | 14 | drawing labels | 0 |
| 5-7 | Runway 9R/27L Development Alternative 1a - Declared Distances | 16 | image only | 0 |
| 5-8 | Runway 9R/27L Development Alternative 1b - Declared Distances | 18 | image only | 0 |
| 5-9 | Runway 9R/27L Development Alternative 2 - Declared Distances | 19 | image only | 0 |
| 5-10 | All Terminal Services Alternatives - Provide Second Floor Expansion | 31 | image only | 0 |
| 5-11 | International Arrivals Swap Alternative | 32 | image only | 0 |
| 5-12 | Terminal Services Development Alternatives Summary | 32 | image only | 0 |
| 5-13 | Terminal Services Development Alternative 1: First Floor | 34 | image only | 0 |
| 5-14 | Terminal Services Development Alternative 1: Second Floor | 34 | image only | 0 |
| 5-15 | Terminal Services Development Alternative 2: First Floor | 35 | image only | 0 |
| 5-16 | Terminal Services Development Alternative 2: Second Floor | 35 | image only | 0 |
| 5-17 | Terminal Services Development Alternative 3: First Floor | 36 | image only | 0 |
| 5-18 | Terminal Services Development Alternative 3: Second Floor | 36 | image only | 0 |
| 5-19 | Landside Facility Walkability Measurement | 40 | image only | 0 |
| 5-20 | Landside Development Alternative 1 | 41 | image only | 0 |
| 5-21 | Landside Development Alternative 2 | 42 | image only | 0 |
| 5-22 | Landside Development Alternative 3 | 43 | image only | 0 |
| 5-23 | Alternatives Evaluation Summary | 53 | image only | 0 |
| 5-24 | Preferred Development Alternative | 55 | drawing labels | 0 |
| 5-25 | Preferred Landside Development Alternative | 56 | drawing labels | 0 |
| 5-26 | Preferred Terminal Services Modifications - First Floor | 58 | image only | 0 |
| 5-27 | Preferred Terminal Services Modifications - Second Floor | 59 | image only | 0 |