# SFB facilities and assets for the digital twin (2027-006-RFP)

Desk research, read 2026-10-29 and 2026-10-30. Nobody was contacted. Every row names its source and carries a
confidence tag. Where a fact could not be confirmed, the row says "not confirmed".

## How to read this file

Confidence tags:

| Tag | Meaning |
|-|-|
| verified | Read this session in a primary source with a text layer (the RFP, an agenda, an FAA or FDOT file, the registry's verified rows) |
| OCR | Read in the macOS Vision OCR of a signed minutes scan. Check the page image before quoting it in the proposal |
| reported | Read in news or a trade article, or in a third party page |
| inferred | Our reading of two or more facts. Not stated by any source |
| not confirmed | Looked for and not found, or the sources disagree |

Source shorthand. Minutes are cited by OCR file name and the scan's page number, for example `040726 p14` means
`docs/rfp/public/ocr/040726-Minutes-Final-Signed-1.txt`, page 14. RFP means
`docs/rfp/2027-006-RFP/Airport_Digital_Twin_Platform_Implementation_and_Support_Services.txt`. SOW means the RFP's
Attachment C, `2027-006-RFP_-_Attachment_C_-_Detailed_Scope_of_Work.txt`. Registry means
`docs/domain-registry.json` (read only, not edited).

The OCR has known slips. "OSl" is OSI. "loppolo" is Ioppolo. Numbers in the scans were read as printed and some
are inconsistent with each other; those are flagged in the rows.

## 1. The terminal

### 1.1 Layout, names and gates

| # | Fact | Source | Confidence |
|-|-|-|-|
| T1 | One commercial terminal today. The 2018 to 2021 project merged the former Terminal A and Terminal B into one building | Airport Improvement, "Expansion, Renovations at Orlando Sanford Int'l..." (2023-01-01) | reported |
| T2 | The same article places the former Terminal A on the west side and Terminal B on the east side | Airport Improvement (2023-01-01) | reported |
| T3 | The minutes name the halves differently. The 2nd chiller is called both the "West Terminal 400-ton chiller" and "the 2nd chiller for Terminal B side". The playground is placed in "the east terminal" (Sept 2025) and "in Terminal B" (Dec 2025). OpenStreetMap labels Terminal A to the east of Terminal B. Which half is A today is not confirmed | `Minutes-Signed-040125` p10; `Minutes-090225` p5; `120225` p5; `poc/build/sfb-osm.json` | not confirmed |
| T4 | 16 gates, able to take domestic and international operations | 2021 AMPU Vol. I, via registry term "sfb commercial terminal" | verified |
| T5 | Before the expansion there were 12 gates. Four were added, extending from a hold area on the east side | Airport Improvement (2023-01-01) | reported |
| T6 | The 2018 to 2021 project cost $60 million, added about 40,000 sq ft, expanded ticketing by about 14,000 sq ft and moved all ticketing to the west end. Funded by PFCs and FDOT grants | Airport Improvement (2023-01-01) | reported |
| T7 | Gate numbers seen in the minutes: Gate 10 (upper level retail), Gate 12, Gates 4 to 16 (terminal ramp work) | `040726` p6; `120324` p4; `Minutes-Signed-040125` p4 | OCR |
| T8 | A Federal Inspection Services (FIS) area for international arrivals. The newer baggage claim and the older arrivals area are split by the CBP facility, so passengers cannot walk end to end inside | `060226` p12 | OCR |
| T9 | Terminal address used by the Authority: 1200 Red Cleveland Blvd., boardroom on the 2nd floor of the main terminal | RFP section 1.4 and 4.1 | verified |
| T10 | Total terminal floor area | none found | not confirmed |

### 1.2 Passenger boarding bridges

| # | Fact | Source | Confidence |
|-|-|-|-|
| B1 | Airlines use 16 jet bridges | FDOT FASP 2043 profile, via registry "sfb commercial terminal" | verified |
| B2 | Maintenance is focused on "the 12 original units installed in 2013"; Director Smith put them at 12 to 15 years old | `040726` p14 | OCR |
| B3 | Ameribridge is named as the boarding bridge supplier for the 2018 to 2021 project. The count it supplied is not stated | Airport Improvement (2023-01-01), facts sidebar | reported |
| B4 | 12 units from 2013 plus 4 added in the expansion would make 16. This is arithmetic, not a source | B1, B2, T5 | inferred |
| B5 | The make of the 12 units from 2013 | none found | not confirmed |
| B6 | PBB controls are Allen-Bradley, "Not Connected" | SOW section 6.9 table | verified |
| B7 | Jet bridge repairs drove Repairs and Maintenance 27% over budget (April 2026) and again in the July 2026 budget amendment | `040726` p8 and p14; `070726` p11 to p12 | OCR |
| B8 | The generator replacement project is titled "Generator Replacement (Admin/PBB)". In Sept 2026 it was finalizing construction with completion expected in September | `090126` p6 | OCR |

> Amendment addresses unexpected costs for jet bridge maintenance stemming from both deferred and routine
> requirements as well as minor facility improvements, such as exterior painting.

(`040726` p14, OCR)

### 1.3 Baggage handling

| # | Fact | Source | Confidence |
|-|-|-|-|
| H1 | 8 inbound and 3 outbound baggage systems | `081225` p9 (George Speake) | OCR |
| H2 | Six domestic claim carousels (three added in the expansion, made by Logan Teleflex, now Daifuku) and two international carousels | Airport Improvement (2023-01-01) | reported |
| H3 | BHS controls are Allen-Bradley, "Not Connected" | SOW section 6.9 | verified |
| H4 | Most BHS maintenance is in-house. Annual, quarterly and preventive inspections and larger repairs went to BMG Conveyor Services of Florida, dba Davis Industrial, contract SA-2025-047-CB, 3 years from 2025-08-12, $239,166 | `081225` p9 to p10 | OCR |
| H5 | Two belts under the observation deck were out of service during its repair, which overworked a third belt. Belt 6 was to be rested while belts 7 and 8 returned to service | `Minutes-090225` p5; `081225` p9 and p18 | OCR |
| H6 | A "baggage hygiene policy" that regulates equipment use was written into the new Allegiant airline use agreement (June 2026) | `060226` p14 | OCR |
| H7 | Inline checked baggage screening equipment and its owner | none found | not confirmed |

> We've had to do a lot of work since we took over, because again it was another system at the Airport that was
> not properly maintained.

(`081225` p9, George Speake, OCR)

### 1.4 Elevators and escalators

| # | Fact | Source | Confidence |
|-|-|-|-|
| V1 | All escalators have been modernized; the last were completed in November (2024, from an April 2025 meeting) | `Minutes-Signed-040125` p4 | OCR |
| V2 | Elevator 1, "the old service elevator", modernization began April 2025 and was complete by August 2025. It had cost about $1,000 a week to keep running | `Minutes-Signed-040125` p4; `081225` p4 | OCR |
| V3 | Elevator 10 (Welcome Center, at the rental car facility) modernization by Kone began the week of 2025-11-17 and was awaiting final inspections in January 2026 | `Minutes-110425` p5; `120225` p23; `010626` p5; `Minutes-Signed-040125` p11 | OCR |
| V4 | Elevator 5, beside the checkpoint escalators on the opposite side of the terminal, added to FDOT PTGA FM#456492-1-94-01 in June 2026. $220,000 total, $110,000 from FDOT, 50/50. Called the final terminal elevator needing modernization | `060226` p13 | OCR |
| V5 | Modernization keeps the cab and skeleton and replaces most controls and some hydraulics, so at least some units are hydraulic | `Minutes-Signed-040125` p4 | OCR |
| V6 | Total count of elevators, escalators and moving walkways, and the maintenance contractor of record | none found | not confirmed |

> This represents the final terminal elevator requiring modernization.

(`060226` p13, OCR)

### 1.5 Central plant, chillers and HVAC

| # | Fact | Source | Confidence |
|-|-|-|-|
| C1 | Five terminal chillers sit under a single maintenance agreement | `070726` p11 (Jeremy Owens) | OCR |
| C2 | Three were legacy 2008 units of 400 tons, "originally maintained by OSI". All three have now been replaced or awarded | `20260505` p24; `070726` p11 | OCR |
| C3 | Chiller 2 (West Terminal, 400 ton): Air Mechanical and Service Corp., $419,848, under FDOT PTGA FM#455305-1-94-01 (Resolution 2025-03, April 2025). Finished in May 2025 | `Minutes-Signed-040125` p10; `Minutes-Signed-050625` p8 | OCR |
| C4 | A rented emergency chiller ran at the West Terminal until 2025-05-09, at about $9,000 a week. Final cost $349,000 (Resolute Industrial dba Mobile Air and Power Rentals, SA-2024-048). July 2025 minutes give $342,000 | `Minutes-Signed-060325` p12; `030425` p6; `070125` p6 | OCR |
| C5 | Chiller 1: installation complete by September 2025, awaiting controls | `081225` p18; `Minutes-090225` p22 | OCR |
| C6 | Chiller 3 (east side of the terminal): Mechanical Services of Central Florida (EMCOR), $445,358, piggyback on Lake County Schools ITB 2025-019-ITB-KF949, July 2026. The FDOT PTGA amendment folds all three replacements into one grant at $440,000 total, 50% FDOT (May 2026). The two totals do not reconcile in the OCR | `070726` p11; `20260505` p24 | OCR |
| C7 | Building Management System is Schneider EcoStruxure, on the internal network | SOW section 6.9 | verified |
| C8 | A separate HVAC chillers and water circulating pumps PM contract was solicited in May 2025; its award was not found | `Minutes-Signed-050625` p12 | OCR |
| C9 | Building 310 (UCF lease, off-terminal) renovation removes a legacy chiller and oil boiler for split systems, with a new 1,600-amp service | `010626` p5 | OCR |
| C10 | The make and tonnage of chillers 4 and 5, cooling towers, boilers and the plant's location | none found | not confirmed |

> Owens confirmed that a single maintenance agreement covers all five terminal chillers.

(`070726` p11, OCR)

### 1.6 Other terminal works and systems

| # | Fact | Source | Confidence |
|-|-|-|-|
| O1 | Observation deck, "formerly known as the smoking deck". A 2019 to 2020 report found problems that OSI did not fix. Shoring went in about early 2024. Repair plans by CPH. Phase I structural by Mark Construction, WO 2025-MC-01 under SA-2025-023-CB (March 2025), Change Order 1 (Sept 2025). Steel done by August 2025, gutters by December 2025, "initial phases complete" January 2026 | `030425` p16; `Minutes-090225` p4; `120225` p4; `010626` p5 | OCR |
| O2 | Three planned phases: structure; roof and close in; then an air conditioned passenger space. Final use was "still up in the air" in Sept 2025 | `Minutes-Signed-040125` p11; `Minutes-090225` p5 | OCR |
| O3 | FDOT PTGA FM#456492-1-94-01 (Resolution 2025-04), 50/50, $460,000: observation deck, rental car facility column repairs, Elevator 10 and east terminal refurbishment | `Minutes-Signed-040125` p10 to p11 | OCR |
| O4 | Oldest roof section, original from 1993, replaced with TPO (early 2025) | `030425` p7 | OCR |
| O5 | FIS: CBP required an overhaul in 2018, first scoped at $12 million 50/50 with FDOT. CBP later chose a refurbishment at about $3.5 million, and about $4 million went back to FDOT (PTGA 437713-2-94-01, Resolution 2026-03, April 2026). The FIS exit lane was due for occupancy Sept/Oct 2026 | `040726` p13 to p14; `090126` p6 | OCR |
| O6 | "Block House" ramp building, used by OSI for ground handling, mold remediation and renovation: Mark Construction $699,040.90 plus about $130,000 electrical, about $830,000 total (Sept 2026) | `090126` p13 | OCR |
| O7 | Four overhead digital signs on Red Cleveland Blvd, installed under OSI, past service life ("the eBay stage of parts"). Replacement awarded to i2Visual, RFP 2025-024-RFP (Nov 2025), with RS&H as technical advisor | `Minutes-110425` p10 to p12 | OCR |
| O8 | 60,000 sq ft of re-lamping was under way in August 2025 | `081225` p7 | OCR |
| O9 | Terminal lighting control is Acuity SensorSwitch, "Not Connected" | SOW section 6.9 | verified |
| O10 | Plumbing lines descaled at BC1, Gate 12 and another location (Dec 2024) | `120324` p4 | OCR |

### 1.7 Terminal A renovation, East Terminal Redevelopment and the ATP application

| # | Fact | Source | Confidence |
|-|-|-|-|
| A1 | A $45 million Terminal A renovation at SFB was not found in the minutes, the agendas or a web search | this session | not confirmed |
| A2 | The "$45 million project" in the minutes is Diversified Aviation SFB Phase 1, a 23-acre Southeast Ramp hangar development (4 buildings, 31 hangars) | `040726` p19; `090126` p49 | OCR |
| A3 | WFTV reported a $45 to $50 million renovation at Orlando International (MCO), a different airport. This is a likely source of the mix-up | WebSearch summary of a WFTV page (not opened) | inferred |
| A4 | An older CEO interview speaks of a $70 million terminal expansion. The interview date is not known | Capital Analytics Associates page (search excerpt; the page returned 403) | reported |
| A5 | President Martz described an Airport Terminal Program (BIL) application titled "Family Friendly Healthy Airports", with an East Terminal Redevelopment and family amenities | `010626` p18 | OCR |
| A6 | SFB's only ATP award found is FY2024: $1,000,000 for part of the West Terminal corridor rehabilitation, the passenger waiting area and ADA accommodations. SFB is absent from the FY2022, FY2025 and FY2026 selection lists. FY2023 was not checked | FAA ATP selection PDFs FY2022, FY2024 (rev 2025-02-14), FY25, FY2026 (2026-05-18), text searched; Rep. Mills release 2024-02-16 | verified |
| A7 | Whether the "Family Friendly Healthy Airports" application was selected | the FY2026 list does not show SFB | not confirmed |

> East Terminal Redevelopment: Repurposing the former duty-free area to increase passenger capacity and restore
> airfield views by uncovering currently obstructed windows.

> Family Amenities: Expanding the "Golden Age of Travel" theme by installing a new Play equipment in the West
> Terminal, complementing the recently completed East Terminal facility, and exploring the development of a sensory
> room.

(`010626` p18, OCR)

## 2. The airfield

| # | Fact | Source | Confidence |
|-|-|-|-|
| F1 | Runway 9L/27R: 11,002 by 150 ft, asphalt, condition GOOD, HIRL, PCN 1490/F/A/X/T, 1,000 ft displaced threshold on 9L | NASR cycle 2026-10-29, registry | verified |
| F2 | Runway 9R/27L: 5,839 by 75 ft, asphalt, FAIR, HIRL; not available for Part 121 scheduled service over 9 seats | NASR, registry | verified |
| F3 | Runway 18/36: 6,002 by 150 ft, asphalt and concrete, FAIR, MIRL | NASR, registry | verified |
| F4 | Runway 9C/27C: 3,578 by 75 ft, asphalt, FAIR, MIRL | NASR, registry | verified |
| F5 | Part 139 Class I, ARFF Index D (Index E with 24 hour PPR). Tower 0630 to 2300, Class C in those hours | NASR, registry | verified |
| F6 | Acreage: NASR 3,000; the 2021 AMPU about 2,400. The sources disagree | registry "sfb acreage" | not confirmed |
| F7 | FAA hot spot HS 1 is Taxiway C and Runway 27C. The ALP consultant described a hot spot where Runway 27C and Runway 18/36 intersect | FAA d-TPP 2611 SE-3 list, registry; `080426` p3 | verified (FAA); OCR (ALP) |
| F8 | Taxiways named in the minutes: A (Alpha), B and B7, C, K1 (removed during 9L work), L (Lima) | `Minutes-090225` p4; `070125` p5; `070726` p16 | OCR |
| F9 | FDOT Statewide Airfield Pavement Management, District 5 2022 report: SFB 11.4 million SF, 4 runways, inspected 2022. Runway PCI: 18/36 58, 9C/27C 63, 9L/27R 71, 9R/27L 68. Year 1 localized preventive estimate $309,450 | registry "statewide airfield pavement management program" | verified |
| F10 | FDOT inspects on about a three year cycle, so a newer SFB inspection may exist. Its date is not confirmed | registry; FDOT pavement page | not confirmed |
| F11 | Runway 9L rehabilitation: field work from January 2025, lighting, shoulder paving and grooving through late 2025, punch list and closeout by March 2026 | `010725` p3; `100725` p7; `Minutes-030326` p3 | OCR |
| F12 | Airfield lighting systems by type: HIRL on 9L/27R and 9R/27L, MIRL on 18/36 and 9C/27C (NASR). The Taxiway A extension adds lighting, signage and an airfield vault modification. A failed rotating beacon was replaced for $19,953.18 (May 2025) | registry; `Minutes-Signed-060325` p12; `Minutes-Signed-050625` p15 | verified (NASR); OCR (minutes) |
| F13 | The airfield lighting control system make, the vault count and the approach lighting inventory | none found | not confirmed |
| F14 | The Airport Layout Plan update concentrates on 18/36 and 9C. The 2021 master plan's removal of 18/36 with a longer 9R "doesn't make sense anymore". Staff wants to keep 18/36 as a crosswind and relief runway | `Minutes-Signed-060325` p13; `010626` p19 | OCR |
| F15 | Air traffic control tower relocation is sited near the ARFF station and awaits the FAA five year plan | `Minutes-Signed-060325` p13 | OCR |
| F16 | In May 2026 George Speake said SFB "falls under Class B airspace". NASR says Class C | `20260505` p15; registry | not confirmed |

## 3. Capital projects, 2024 to 2027

All amounts as printed. "SAA" is the Authority's own money.

| # | Project | What was approved | Amount | Funding | Source | Confidence |
|-|-|-|-|-|-|-|
| K1 | Taxiway Alpha rehabilitation | Award to Halifax Paving, Jan 2025 | $6,589,268 | FAA AIP 3-12-0069-095-2025 from BIL money "that we have and are receiving", plus FDOT and local | `010725` p9 to p10 | OCR |
| K2 | Terminal apron (ramp) improvements, Gates 4 to 16 | C&S Task Order 16 for construction phase services, Jan 2025; closeout Aug 2025 | not stated | PFC | `010725` p8; `081225` p4 | OCR |
| K3 | Southeast GA stormwater improvements | Resolution 2025-02 | not stated | FDOT PTGA FM#454731-1-94-01, 50/50 | `Minutes-Signed-040125` p10 | OCR |
| K4 | Chiller 2 | see C3 | $419,848 | FDOT PTGA FM#455305-1-94-01 | `Minutes-Signed-040125` p10 | OCR |
| K5 | Terminal deferred maintenance items | Resolution 2025-04 | $460,000 | FDOT PTGA FM#456492-1-94-01, 50/50 | `Minutes-Signed-040125` p11 | OCR |
| K6 | Remote parking lot, about 800 spaces | Award to Halifax, April 2025; PTGA amended April 2026; completion expected Nov/Dec 2026 | target near $6M (2025) | FDOT PTGA FM#452985-1-94-01, 50/50; a 2024 Truist line of credit was tagged to it | `030425` p17; `040726` p15; `120324` p8; `090126` p5 | OCR |
| K7 | FY25 deferred maintenance capital | Budget raised from $2.6M to $3,457,040 | FDOT share printed as $875,040 in the narrative and $857,040 in the motion | FDOT grants plus SAA | `Minutes-Signed-050625` p15 | OCR |
| K8 | Wildlife mitigation Phase I (Twy B/B7) | Halifax base bid, June 2025 | $2.25M base; C&S $147,966.14 | FAA $2,161,942 (90%) | `Minutes-Signed-060325` p10 | OCR |
| K9 | 1,500 gallon ARFF truck (FAA) | Oshkosh, June 2025 | $1,058,252 | FAA $952,427 | `Minutes-Signed-060325` p11 | OCR |
| K10 | 1,500 gallon ARFF truck (state) | Sole source Oshkosh, Aug 2025. Both trucks on site Sept 2026 | $1,040,000 appropriation | State appropriation via Florida Department of Financial Services, balance SAA | `081225` p7 to p8; `090126` p5 | OCR |
| K11 | Taxiway Alpha extension design | June 2025 | C&S TO 8 $1,001,195 | FAA $903,025, AIP 3-12-0069-097-2025 | `Minutes-Signed-060325` p12 | OCR |
| K12 | ALP update with narrative | June 2025; preferred alternative Sept/Oct 2026; FAA pre-applications due Oct 1 | C&S TO 7 $627,450 | FAA $566,955, AIP 3-12-0069-098-2025 | `Minutes-Signed-060325` p13; `090126` p5 | OCR |
| K13 | Taxiway Alpha West extension construction (to the west end of the runway from Lima) | Halifax low bid $11.8M, July 2026 | $13.4M total | FAA $12,076,525; FDOT PTGA amendment (printed "#44443-2-94-01", number likely truncated in the scan) to offset the local match | `070726` p15 to p16; `060226` p13 to p14 | OCR |
| K14 | Terminal Connector Corridor (secure walk between the two arrival areas) | Resolution 2026-07, June 2026 | $3.0M | FDOT PTGA FM#455272-2-94-01 $1.5M; federal earmark $1.0M (Rep. Mills, through the FAA); local $0.5M | `060226` p12 | OCR |
| K15 | Elevator 5 | Resolution 2026-08 | $220,000 | FDOT $110,000 via FM#456492-1-94-01 | `060226` p13 | OCR |
| K16 | Chiller 3 | Resolution 2026-05 (May) and award (July 2026) | $445,358 award; $440,000 grant total for three | FDOT 50% | `20260505` p24; `070726` p11 | OCR |
| K17 | Stormwater pond ("kidney pond") upgrade | Southern Development and Construction, July 2026 | $2,129,177 | not stated | `070726` p10 | OCR |
| K18 | Midfield utility (S. Beardall Ave and Moores Station Rd) | SanPik, Sept 2026 | $2,000,000 with contingency | not stated | `090126` p12 | OCR |
| K19 | Vehicle Movement Area Transponders | FAA grant, Aug 2026, 10% local match | $110,261 | FAA | `080426` p20 | OCR |
| K20 | VMAT, state side | Resolution 2026-13, Oct 2026 agenda | not on agenda | FDOT PTGA FM#458844-1-94-01 | `100626-Agenda-Final.pdf` item 10B | verified |
| K21 | Digital Twin | Grant approval on the Oct 2026 agenda | $1.2 million | State appropriation, through the Department of Management Services Technology Program (the minutes say State Office of Technology; corrected per the claims register); procurement by end of Sept 2026, completion by summer 2027 | `100626-Agenda-Final.pdf` item 10A; `060226` p12; `070726` p9 | verified (agenda); OCR (amount) |
| K22 | FY27 capital program | Resolution 2026-11, July 2026 | $14.1M total. CIP $8.1M with $1.2M SAA match; $3.3M departmental capex; $2.6M OSI deferred maintenance | grants plus SAA | `070726` p12 to p13 | OCR |
| K23 | FY27 named CIP projects | Wildlife Phase II, obstruction removal, Runway 18/36 rehabilitation design, multimodal improvements, VMAT upgrades, Terminal Connector Corridor, rental car facility improvements | not itemized | mixed | `070726` p13 | OCR |

Federal programme totals that sit behind these rows:

| # | Fact | Source | Confidence |
|-|-|-|-|
| G1 | BIL AIG allocations to SFB: FY22 $5,670,156; FY23 $5,657,728; FY24 $5,564,345; FY25 $5,348,123; FY26 $5,188,866 | FAA AIG allocation PDFs, registry | verified |
| G2 | AIP grant histories: FY2024 $11,620,521 (runway rehab, lighting, visual guidance, safety) and $1,000,000 terminal; FY2025 $6,539,635 AIG (reconstruct taxiway) and others | FAA AIP grant spreadsheets, registry | verified |
| G3 | Staff said the AIG entitlement of about $5.6M a year had been banked since 2022 for Taxiway A | `Minutes-Signed-040125` p8 | OCR |
| G4 | An earlier $1M earmark for the corridor "punch thru" between the two baggage claims was lost in the continuing resolution and was to be resubmitted for FY26 | `Minutes-Signed-040125` p8 | OCR |
| G5 | Florida law caps FDOT at 50% of the nonfederal share for an airport of SFB's size; most terminal deferred maintenance above is 50/50 FDOT state money with no FAA share | Fla. Stat. 332.007(6), registry; rows K3 to K16 | inferred |

The VMAT name conflicts. The Aug 2026 minutes and Oct 2026 agenda say Vehicle Movement Area Transponders. The FY27
budget passage in `070726` p13 reads "Vehicle Maintenance and Administration Terminal (VMAT) upgrades". Which
project the FY27 line means is not confirmed.

## 4. Deferred maintenance and the end of the terminal contract

| # | Fact | Source | Confidence |
|-|-|-|-|
| D1 | The board voted on Sept. 18 to end the contract with Orlando Sanford International Inc. (OSI), "an entity owned by France-based Vinci Airports", citing 13 contract defaults tied to maintenance. Article dated 2023-12-10 | WFTV, "Sanford Airport Authority ends contract with terminal management firm" | reported |
| D2 | Defaults named in the article: escalators, the parking garage, bag belts "and more". The full list of 13 is in the 2023-09-18 minutes, not read this session | WFTV; minutes file `091823-Minutes-Signed.pdf` on flysfb.com (not downloaded) | reported |
| D3 | Deferred maintenance then: more than $26 million, 6.5 years into a 22-year contract | WFTV (2023-12-10) | reported |
| D4 | An effective end date of 2024-02-28 appeared in a search summary only | WebSearch summary | not confirmed |
| D5 | April 2025: "we have $44M in deferred maintenance", with reserves drawn to cover it | `Minutes-Signed-040125` p7 | OCR |
| D6 | July 2026: an estimated $44 million to $55 million left by the former operator; $2.6 million a year budgeted against it | `070726` p12 | OCR |
| D7 | Sept 2026: the backlog "will still take years" | `090126` p9 | OCR |
| D8 | Items the minutes tie to OSI: three 2008 chillers and the rental chiller, the observation deck, Elevators 1, 5 and 10, BHS preventive maintenance, the overhead signs, the Block House, the 1993 roof | rows C2 to C6, O1 to O7, V2 to V4, H4 | OCR |
| D9 | SAA v. TBI US Operations, Inc., Case 2024-CA-001039: settlement approved 2025-11-04 (Ioppolo opposed); check due in the November financials | `Minutes-110425` p15; `120225` p8 | OCR |
| D10 | A separate OSI lawsuit continues. OSI claims $100 million in damages. Deadlines are stayed to January 2027; OSI targets a September 2027 trial and the Authority March 2028 | `090126` p11 | OCR |
| D11 | Counsel advised that taking FDOT money for Elevator 5 should not bar recovery of deferred maintenance damages from OSI, subject to review | `060226` p13 | OCR |

> We will certainly try to bring you a budget this year that doesn't impact reserves but we have $44M in deferred
> maintenance.

(`Minutes-Signed-040125` p7, President Martz, OCR)

> President Martz concurred, explaining that staff is prioritizing items as quickly as possible, though addressing
> the backlog of deferred maintenance will still take years.

(`090126` p9, OCR)

> Board Director Smith asked for confirmation that we are keeping track of this deferred maintenance.
> Jeremy Owens confirmed.

(`081225` p7, OCR)

## 5. The operating model

| # | Fact | Source | Confidence |
|-|-|-|-|
| M1 | The Authority, a special district created in 1971, owns and operates SFB | RFP section 1; registry enabling act | verified |
| M2 | From 1997 Airports Worldwide (AWW) held a concession for commercial air service, terminal management and cargo. AWW was later bought by Vinci Airports. OSI and TBI are the entities named in the minutes | search summary of ICAO case study, airportxnews and the 2019 and 2020 OSIA annual reports | reported |
| M3 | Wikipedia still says the airport is "operated by Airports Worldwide". The minutes show this is out of date | Wikipedia; rows M4 to M6 | inferred |
| M4 | The Authority took over terminal management from OSI/TBI and kept the OSI team and three of its vendors | `010725` p8 to p9 | OCR |
| M5 | FY27 is "the Authority's third full fiscal year of direct operation following the management transition" | `070726` p14 | OCR |
| M6 | No terminal operator other than the Authority was found for 2026 | this session | not confirmed |
| M7 | Maintenance is run by Authority staff under the VP and Chief Development Officer (Jeremy Owens in the 2025 and 2026 minutes). Contractors cover specialist work: Davis Industrial (BHS PM), the chiller maintenance agreement, Kone (Elevator 10), TECC (electrical), Mark Construction (continuing construction), C&S and RS&H (engineering) | rows H4, C1, V3; `081225` p6; `120324` p6 | OCR |
| M8 | Janitorial services are in-house | `20260505` p25 | OCR |
| M9 | Ground handling: Allegiant uses its own contractor (Worldwide Flight Services agreements, March 2026). The Authority handled other carriers and planned to move its ground handling to a third party from September 2026 | `060226` p16; `Minutes-030326` p3; `070726` p13 | OCR |
| M10 | FY27 personnel: 236 positions, concentrated in Airline Services, Operations and Maintenance | `070726` p13 | OCR |
| M11 | In May 2026 a director spoke of being "two years away from assimilating all Airport operations under one roof". What remains outside is not stated | `20260505` p12 | not confirmed |

## 6. Traffic, airlines, cargo and research tenants

| # | Fact | Source | Confidence |
|-|-|-|-|
| P1 | Authority totals: passengers 2,941,456 (2023), 2,877,526 (2024), 3,166,417 (2025); operations 268,659, 310,074, 394,863 | flysfb.com statistics page, read 2026-10-30 | verified |
| P2 | FAA enplanements: CY2022 1,367,935; CY2023 1,446,884; CY2024 1,412,954; CY2025 1,553,711. Primary, small hub, rank 87 | FAA CY2025 file, registry | verified |
| P3 | Record year 2019: 3,291,112 passengers. Peak operations 2001: 397,560. 2025 operations given as 394,002 at the January 2026 meeting | `010626` p18 to p19 | OCR |
| P4 | Busiest small hub by operations, 20th in the US through November 2025, 3rd in Florida | `010626` p19 | OCR |
| P5 | 2026-04-16: 110.5 operations an hour with the tower open | `20260505` p15 | OCR |
| P6 | Airlines page: Allegiant, Arajet, BermudAir, Contour (seasonal or charter), Sun Country (seasonal or charter) | flysfb.com airlines page, registry | verified |
| P7 | Allegiant has had hub operations at SFB since 2005 and is the signatory carrier under the first airline use agreement (June 2026, three year term, retroactive to Dec 1). SFB became Allegiant's second largest base after the Sun Country merger | `060226` p14 to p16 | OCR |
| P8 | BermudAir moves from MCO to SFB from October 2026 (Bermuda, then Belize in December). It flies four Embraer 190 and 175 aircraft with A220s on order. Its agreements were on the Oct 2026 consent agenda | `070726` p9; `100626-Agenda-Final.pdf` item 6A | OCR; verified (agenda) |
| P9 | Swoop, Flair and TUI left after the pandemic | `010626` p19 | OCR |
| P10 | Cargo: the Authority reports 0 tons for 2023 to 2025. A 20,000 sq ft cargo space was under lease negotiation in 2026 | flysfb.com statistics; `080426` p11 | verified; OCR |
| P11 | UCF CAPE (formerly CATER), former dorm building (Building 310): lease 2025-069 (Oct 2025), 5 years plus 5, over $600,000; SAA turnkey renovation, $5.5 million project; occupancy Sept/Oct 2026 | `100725` p15; `090126` p6 and p49 | OCR |
| P12 | Siemens Energy molten salt storage research facility on Aviation Loop, footprint grown from 1 to 5 acres, $10 million, lease not final in Sept 2026 | `080426` p11; `090126` p49 | OCR |
| P13 | Other aviation tenants: Million Air (FBO), Acron Aviation Academy, Flexjet, ASIG/Menzies, Avocet, AeroMech (38,000 sq ft hangar for a Starlink project), AirBoss MRO hangar | registry; `090126` p49 | verified; OCR |

## 7. Ground access and rail

| # | Fact | Source | Confidence |
|-|-|-|-|
| R1 | SR 417 (Seminole Expressway) ends at I-4 in Sanford and is run by Florida's Turnpike Enterprise | CFX and FTE pages, registry | verified |
| R2 | CFX SR 417 Sanford Airport Connector PD&E began May 2024, aims to relieve East Lake Mary Blvd, and is "upward of $200M". Presented to the Board May 2025 | `Minutes-Signed-050625` p3 to p4 | OCR |
| R3 | Resolution 2025-06 (Oct 2025) supports Preferred Alignment 2A | `100725` p5 | OCR |
| R4 | January 2026: the Authority is working with Seminole County and CFX on multi-jurisdictional funding, using its federal lobbyists Alcalde & Fay. The OCR lists "two specific avenues" and then does not name them | `010626` p17 | OCR |
| R5 | June 2026: the City approved a joint funding agreement with the County for the connector, using gas tax revenue for up to ten years | `060226` p3 | OCR |
| R6 | SR 46 is the primary access to the north side parcels "due to the runway configuration" | `Minutes-030326` p9 | OCR |
| R7 | SunRail Sanford Station: 2720 W. State Road 46, with park and ride. The SunRail page lists no airport shuttle | SunRail station page, registry | verified |
| R8 | Distance from the terminal to SunRail Sanford by road | not measured | not confirmed |
| R9 | Amtrak Auto Train southern terminal is in Sanford. Straight line from the OSM terminal centroid to the OSM "Sanford (Auto Train)" point is about 3.7 miles | `poc/build/sfb-access.json` and `sfb-osm.json` (OSM); `060226` p19 | inferred |
| R10 | The CEO said in an interview that SFB is "the only Florida airport with a direct rail line" and that a rail line beside the airport was being explored. Aviation Week's profile words it as direct access to a CSX freight line | Capital Analytics excerpt via search (page not opened, undated); Aviation Week marketplace profile via search | reported |

> We are the only Florida airport with a direct rail line.

(Nicole Martz, Capital Analytics Associates interview, search excerpt only. Confirm against the full page.)

## 8. IT systems, maintenance software, GIS, CAD, BIM, drones and sensors

| # | Fact | Source | Confidence |
|-|-|-|-|
| S1 | Existing systems named by the Authority: Genetec Security Desk (video); Acuity SensorSwitch (terminal lighting); Allen-Bradley (BHS and PBB controls); Simplify i3 (work orders, safety management, inspections, partial asset management, cloud); PMX (real estate and leasing); Schneider EcoStruxure (BMS); Skidata (parking); Microsoft 365 Business Central (finance); generator monitoring (CAT, Genetec and others, not connected) | SOW section 6.9 | verified |
| S2 | The RFP treats a CMMS/EAM as "foundational" and says the twin "shall not" replace it. Simplify i3 is the work order system the table names | SOW sections 5.4 and 6.2 | verified |
| S3 | A new ERP went live the weekend before the 2026-03-03 meeting. Its product name is not in the minutes. Business Central is the likely candidate | `Minutes-030326` p12; S1 | inferred |
| S4 | Amadeus ACUS cloud common use replaced the on-premise EASE system, contract SA-2025-016 (March 2025), for cyber security and maintenance reasons | `030425` p16 | OCR |
| S5 | GIS, CAD and BIM appear in the RFP as data the twin must take in, and the provider must assess "the current maturity of the Authority's GIS". No GIS, CAD or BIM system or file set is named in the minutes | SOW lines 326 to 331, 464 to 470, 492; minutes search | verified (RFP); not confirmed (holdings) |
| S6 | The ALP drawing (signed 07/2022) and the master plan are public PDFs | registry "sfb airport master plan and alp" | verified |
| S7 | Drones or UAS: no Authority drone programme was found in the minutes. The only hit is a student who earned an FAA drone certificate | `20260505` p3 | not confirmed |
| S8 | Sensors: the digital twin pitch to the Legislature named "integrated sensors to provide real-time data on all Airport facilities" | `010626` p17 to p18 | OCR |
| S9 | Vehicle movement area transponders on every ground vehicle in the movement area (grant Aug 2026) | `080426` p20 | OCR |
| S10 | A Board member asked for an internal KPI dashboard; staff is building "data center modeling" for expenditure metrics | `040726` p9; `060226` p8 | OCR |
| S11 | IT staff in the minutes: Tommy Gentry, Director of IT; Rhett Rabley, Assistant Director IT | minutes attendance lists, e.g. `040726` p1, `Minutes-110425` p1 | OCR |
| S12 | A 2023 RFI for an asset management system that integrates with Business Central | OpenGov project 42989, search summary in `an internal note, held locally` | reported |

> The current appropriation request is for the development of a "Digital Twin" system for the Airport. This
> Information Technology (IT) initiative utilizes integrated sensors to provide real-time data on all Airport
> facilities.

(`010626` p17 to p18, OCR)

## 9. Facts to confirm at the 2026-11-06 site tour

1. Which half of the terminal is called Terminal A today, east or west (T2, T3).
2. Gate count and bridge count: 16 and 16, and the make and year of each bridge. Are the 12 from 2013 a different make from the expansion bridges (B1 to B5)?
3. Elevator, escalator and moving walkway counts, their makes, and who holds the maintenance contract (V6).
4. The five chillers: makes, tonnage, where the plant sits, and what the EcoStruxure BMS already reads from them (C1, C7, C10).
5. Whether the BHS PLCs and PBB PLCs can be reached from a network at all, given "Not Connected" (B6, H3).
6. Simplify i3: what asset hierarchy it holds, how many assets, and whether condition data is recorded (S1, S2).
7. What GIS, CAD and BIM files exist for the terminal and airfield, and in what formats (S5).
8. Whether any $45 million Terminal A renovation exists, or whether the figure is the Diversified hangar project (A1, A2).
9. The outcome of the "Family Friendly Healthy Airports" ATP application (A7).
10. The latest FDOT pavement inspection date and PCI for SFB (F9, F10).
11. Which VMAT the FY27 budget means: transponders or a vehicle maintenance and administration building (K19 to K23).
12. The full list of the 13 OSI contract defaults from the 2023-09-18 minutes (D2).
13. The road distance and any shuttle between the terminal, SunRail Sanford and the Auto Train (R8, R9).
14. Whether the Authority flies drones or has a UAS policy (S7).