Level 1 of 3 This section, complete on its own. Each page below is a component with its own data and sources. Open the components

Sheets 12

No.PageWhat it holds
8.1A-01: One picture of the airportThe picture is built from lidar returns over the airfield, and the terminal roof is measured at 11.2 m. Runways, taxiways and buildings sit in one view, so the systems can be read...
8.2A-02: The RFP, built into the appEvery requirement is a row that points to a screen.
8.3A-03: The plan, the projectThe platform is the project. The plan, the tracking and the record of the build live in the same place as the twin.
8.4A-04: Off the shelfThe Interchange is ours. Jira, off the shelf and used by most teams, feeds it from the platform side, and it carries work to the owner's systems on the other.
8.5A-05: The InterchangeOne work order leaves the twin for i3 and its status comes back.
8.6A-06: What is built, and where it stands now
8.7A-07: Exploded asset systemsThe terminal main hall seen from above with the floor fills off, so the systems inside it show.
8.8A-08: Exploded systemsBuilding systems lifted apart, each part named from the kit model.
8.9A-09: Sensors and routingThe twin proposes the route and a person confirms it.
8.10A-10: The Authority's priorities, and where each is met
8.11A-11: Configuration, training and security
8.12A-12: What was done

Documents 1

No.PageWhat it holds
8.13RFP and Authority documentsThe four RFP documents and the Authority strategic plan.