AirfieldpathOrlando Sanford International

A derived outlook, for discussion

The horizons: 1, 3, 5 and 10 years, derived from the RFP

This page is the horizons, a level below the front page, and it looks past phase one to the longer view.

A derived outlook.

The Authority has not written these plans.

It is built from the RFP's own words and from the time the phases take, and it is for discussion.

Every item names the RFP phrase or the plan fact it comes from, and a reading of the RFP is never a requirement or a commitment.

The words on this page are the words of its narration. Open the Listen bar at the foot of the page to hear them. The larger frame reads how the corridor and the Authority can work together at each horizon.

The 1 year horizon

The initial implementation Now · The RFP asks

The first phase concentrates on asset management, operations and maintenance.

The RFP says, in Attachment C, 1.3: "the initial implementation shall concentrate on business functions that provide measurable operational value while establishing the technical foundation necessary for future expansion."

In the plan this is P1 to P7, from 2 February 2027 to 30 June 2027.

Open: Implementation and Roadmap · The implementation plan

Plan, implement, test, in phases Now · The plan

Each phase holds its own planning, building and testing in turn, and ends at a gate the Authority accepts.

The RFP says, in Attachment C, 1.3: "developed incrementally through phased implementation rather than a single comprehensive deployment."

In the plan this is P2 to P5, from 15 February 2027 to 28 May 2027.

Open: The implementation plan · A-03: The plan, the project

Training and knowledge transfer Now · The plan

Training, documentation and hand-over sit inside phase one.

The RFP says, in Attachment C, 4.11: "training and knowledge transfer services necessary to support successful adoption."

In the plan this is P6, Training, documentation and knowledge transfer, from 10 May 2027 to 18 June 2027.

Open: Support · A-11: Configuration, training and security

The 3D twin, shown today Now · A reading of the RFP

The sources the RFP lists are the stuff of a two dimensional record, and the Authority is reaching for a three dimensional twin.

The Exploder shows that three dimensional twin today, built on the same kinds of sources, with tagged assets that cite their source and status.

It is a capability a later horizon would reach, shown now in the proof of concept.

Where a height is designed it is marked designed, and the proof of concept is not the Authority's data.

The RFP says, in Attachment C, 2.1: "operational environment for visualizing, integrating, and managing information from selected airport systems and available spatial information."

The matrix has 2 rows that name the Airport in 3D screen, and 2 of them are partly met.

This is a reading of the RFP.

Open: The Exploder · The Airport in 3D · The Airfield in 3D, from Lidar · Asset tags · A-07: Exploded asset systems

Support, and the next asset classes Then · The RFP asks

The rest of the first year adds support and the next asset classes.

The RFP says, in the scope of work of the RFP: "Other airport assets and facilities identified during implementation."

In the plan this is P8, Support and the next asset classes, rest of year 1, from 1 July 2027 to 31 January 2028.

Open: The implementation plan

The 3 year horizon

More integrations and analytics Then · The RFP asks

The second year takes every unit of the asset classes and the next systems.

The RFP says, in Attachment C, 1.1: "additional integrations, enhanced analytics (including intelligent visual analytics), new operational use cases, and continued configuration as Airport needs expand."

In the plan this is P9, Year 2: every unit of the five classes, and the next systems, from 1 February 2028 to 31 January 2029.

Open: The Interchange · Analytics

A roadmap for spatial data quality Then · The RFP asks

The RFP asks for an assessment of the Authority's spatial information and a roadmap for improving it.

The RFP says, in Attachment C, 4.4: "provide recommendations as well as a roadmap for improving spatial data quality."

Open: Spatial Enablement · Intake

Prediction across the classes Then · The RFP asks

The third year takes the wider terminal systems and prediction across classes.

The RFP says, in Attachment C, 3.7: "Artificial Intelligence (AI) should be incorporated where it provides measurable operational value."

In the plan this is P10, Year 3: the wider terminal systems and prediction across classes, from 1 February 2029 to 31 January 2030.

Open: Predictive Maintenance · Analytics

A reading of how the corridor and the Authority can work together on the 3 year horizon opens on the larger frame page. Open the 3 year reading on the larger frame page.

The 5 year horizon

More facilities, and the gaps no maker sensor reaches Then · The RFP asks

The fourth year reaches the gaps no maker sensor covers, and more facilities.

The RFP says, in Attachment B: "Provide a future roadmap for logical expansion through additional integrations, assets, facilities."

In the plan this is P11, Year 4: the gaps no maker sensor reaches, and more facilities, from 1 February 2030 to 31 January 2031.

Open: The implementation plan · What to sense

Real-time data on all Airport facilities Then · The RFP asks

The fifth year is real-time data on all Airport facilities.

The RFP says, in the project objectives of the RFP: "Establishing a sustainable platform that can expand through future integrations."

In the plan this is P12, Year 5: real-time data on all Airport facilities, from 1 February 2031 to 31 January 2032.

Open: The implementation plan

Administration by the Authority's own staff Then · A reading of the RFP

By the fifth year, a reading of the RFP is that the Authority's staff run the platform themselves.

The RFP says, in the desired qualities of the RFP: "Sustainable administration and long-term support."

This is a reading of the RFP.

Open: Rules and Data Library · Security and Administration

A reading of how the corridor and the Authority can work together on the 5 year horizon opens on the larger frame page. Open the 5 year reading on the larger frame page.

The 10 year horizon goes past the plan, which itself ends at 31 January 2032

The Ecosystem the Authority owns Then · A reading of the RFP

A reading of the RFP is that the Authority wants the Ecosystem to be its own long-term capability, growing from the foundation laid in the first years.

The RFP says, in Attachment C, 1.1: "a long-term enterprise capability that will serve as the foundation of an Airport Digital Twin."

This is a reading of the RFP.

Open: A-06: What is built, and where it stands now · The platform

A twin that outlives any one vendor Then · A reading of the RFP

A reading of the RFP is that open standards and configuration before customization are how a twin lasts ten years.

The RFP says, in Attachment C, 2.7: "capable of evolving without proprietary customization."

This is a reading of the RFP.

Open: Open Standards · Rules and Data Library

Emerging technologies Then · A reading of the RFP

A reading of the RFP is that the Authority expects the twin to meet technologies that do not exist yet.

The RFP says, in Attachment C: "compatibility with emerging technologies."

This is a reading of the RFP.

Open: The Interchange

A foundation for future technology initiatives Then · A reading of the RFP

A reading of the RFP is that the twin becomes the base for the Airport's later technology initiatives.

The RFP says, in the project purpose of the RFP: "provides a foundation for future Airport technology initiatives."

This is a reading of the RFP.

Open: The platform

The Authority's own master plan bands Then · The plan

The Authority's own master plan already uses these bands.

The RFP says, in the Master Plan database, capital improvement programme: "near term (0 to 5 years), mid term (5 to 10) and long term (10 to 20)."

Open: Master plan database

A reading of how the corridor and the Authority can work together on the 10 year horizon opens on the larger frame page. Open the 10 year reading on the larger frame page.