The horizons: 1, 3, 5 and 10 years, derived from the RFP
This page is the horizons, a level below the front page, and it looks past phase one to the longer view.
A derived outlook.
The Authority has not written these plans.
It is built from the RFP's own words and from the time the phases take, and it is for discussion.
Every item names the RFP phrase or the plan fact it comes from, and a reading of the RFP is never a requirement or a commitment.
The words on this page are the words of its narration. Open the Listen bar at the foot of the page to hear them. The larger frame reads how the corridor and the Authority can work together at each horizon.
The 1 year horizon
The initial implementation Now · The RFP asks
The first phase concentrates on asset management, operations and maintenance.
The RFP says, in Attachment C, 1.3: "the initial implementation shall concentrate on business functions that provide measurable operational value while establishing the technical foundation necessary for future expansion."
In the plan this is P1 to P7, from 2 February 2027 to 30 June 2027.
The 3D twin, shown today Now · A reading of the RFP
The sources the RFP lists are the stuff of a two dimensional record, and the Authority is reaching for a three dimensional twin.
The Exploder shows that three dimensional twin today, built on the same kinds of sources, with tagged assets that cite their source and status.
It is a capability a later horizon would reach, shown now in the proof of concept.
Where a height is designed it is marked designed, and the proof of concept is not the Authority's data.
The RFP says, in Attachment C, 2.1: "operational environment for visualizing, integrating, and managing information from selected airport systems and available spatial information."
The matrix has 2 rows that name the Airport in 3D screen, and 2 of them are partly met.
More integrations and analytics Then · The RFP asks
The second year takes every unit of the asset classes and the next systems.
The RFP says, in Attachment C, 1.1: "additional integrations, enhanced analytics (including intelligent visual analytics), new operational use cases, and continued configuration as Airport needs expand."
In the plan this is P9, Year 2: every unit of the five classes, and the next systems, from 1 February 2028 to 31 January 2029.
The 10 year horizon goes past the plan, which itself ends at 31 January 2032
The Ecosystem the Authority owns Then · A reading of the RFP
A reading of the RFP is that the Authority wants the Ecosystem to be its own long-term capability, growing from the foundation laid in the first years.
The RFP says, in Attachment C, 1.1: "a long-term enterprise capability that will serve as the foundation of an Airport Digital Twin."