AirfieldpathOrlando Sanford International

6.13 · Data and sources · Research notes

Master plan database

passes traced the six terminal floor plans (Figures 2-16 to 2-21) and took the facts the Exploder needed. This pass

No picture for this component.

Document · Data and sources · Research notes

Master plan database

passes traced the six terminal floor plans (Figures 2-16 to 2-21) and took the facts the Exploder needed. This pass

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Document
Status
not linked
Airport layer
not linked
Airport area
not linked
System
not linked
Sensor type
not linked

Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

passes traced the six terminal floor plans (Figures 2-16 to 2-21) and took the facts the Exploder needed. This pass reads the whole plan and writes it down as cited records.

  • The database: projects/sfb-terminal/02-evidence/master-plan-db.json
  • Its schema: projects/sfb-terminal/02-evidence/master-plan-db.schema.json
  • The builder: tools/master-plan-db.py (it refuses to write a file that fails the schema)
  • Rows read by eye from page images: tools/master-plan-db-curated.json

Rebuild with python3 tools/master-plan-db.py. The build reads only local files and the two PDFs in 01-intake/master-plan.

What was read

DocumentPagesSource
2021 Airport Master Plan Update, Volume I: Main Narrative (Final 2.0, October 2021)438flysfb.com, already in 01-intake
Chapter 5 Development Alternatives, Draft v1.3 (August 2021)61fetched from flysfb.com for this pass, entered in 01-intake/files.json

Volume I was read from its text layer (02-evidence/master-plan-pages/ampu.txt). The 49 full-page drawings were also read from their own text layer in reading order, so their labels ("PROPOSED PARKING STRUCTURE (4,000 SPACES)") are records too. Table 7-2, the capital programme, is a picture in the PDF. It was read from a page render, row by row, and every phase subtotal and the grand total were checked against the sum of the rows.

The draft was compared with the final. Where a draft sentence appears in the final it is not recorded twice. Eight statements are draft only (see Chapter 5 below).

How a record is shaped

Each fact cites where it was printed: document and chapter, then section with any unnumbered heading under it, then page with table or figure. The number is kept as printed (cell for a table, the sentence for prose) beside the parsed value and unit. A table row is written once as printed (kind: table row) and then once per cell (kind: table cell) with its row and column labels, so any cell can be checked against its row.

planning_year holds the year as the plan names it. The plan states its later needs by Planning Activity Level. The PALs map to years because Table 4-31's annual enplanements for PAL 1 to PAL 4 equal the Table 3-33 forecast for 2022, 2027, 2032 and 2037. Baseline is 2017. Section 4.7 puts PAL GA 1 to 4 on the same years. CIP rows carry their phase years from section 7.5: Phase 1 is 2022-2026, Phase 2 is 2027-2031, Phase 3 is 2032-2041.

category comes from a controlled list of 50 categories, set by section and refined by a few keyword rules. entities names what the fact is about and the twin id it maps to, with in_twin true when that id exists in exploder.json or asset-list.json. The plan stage, RFP requirement and sensor class for each entity are kept once, in twin_coverage.

Counts

13,081 facts, 163 tables and 123 figures in Volume I, plus the draft's 19 tables and 27 figures.

By chapter

ChapterTitleFactsTablesFigures
ESExecutive Summary416150
1Introduction1001
2Inventory of Existing Conditions6601130
3Aviation Demand Forecasts6543336
4Demand Capacity and Facility Requirements29166327
5Development Alternatives5741927
6Environmental Overview321619
7Financial Plan1424119
8Public Involvement Program600
9Airport Layout Plan1300
10Sustainability Plan19854
All13081163123

The Chapter 5 draft adds 19 tables and 27 figures (the same numbers as the final) and 8 statements the final does not carry.

By category

CategoryWhat it holdsFacts
context.purposePurpose, goals, process and key issues of the plan13
context.settingLocation, role, history, management of the airport64
context.meteorologyWeather and wind coverage16
inventory.airfieldExisting runways, taxiways, aprons and pavement condition256
inventory.navaids-lightingExisting NAVAIDs, approach procedures, airfield lighting, signs and markings16
inventory.terminalExisting passenger terminal, gates and terminal spaces67
inventory.landsideExisting roads, curbs, parking, rental cars and ground transport40
inventory.general-aviationExisting GA hangars, FBOs, tenants and GA aprons66
inventory.cargoExisting air cargo facilities2
inventory.supportExisting support facilities: ARFF, ATCT, maintenance, fuel, police83
inventory.airspaceAirspace structure, ATC, nearby airports42
inventory.land-useLand use, zoning, vacant land6
socioeconomicMarket area population, employment, GDP, tourism300
forecast.enplanementsPassenger enplanement forecasts1531
forecast.based-aircraftBased aircraft and their fleet mix1618
forecast.operationsAircraft operations forecasts by type2045
forecast.fleet-mixAir carrier fleet mix192
forecast.cargoAir cargo tonnage forecast131
forecast.peakPeak month, day and hour activity186
forecast.summaryForecast summaries and comparison with the FAA TAF577
design-standardCritical aircraft, AAC, ADG, TDG, RDC, safety areas, RPZs, separations370
capacity.airfieldHourly capacity, annual service volume, delay276
capacity.airspaceAirspace and converging approach limits180
requirement.runwayRunway length, width, pavement, safety area needs486
requirement.taxiwayTaxiway width, geometry, pavement and safety area needs164
requirement.navaids-lightingLighting, signage, marking and NAVAID needs22
requirement.terminalTerminal space needs: gates, ticketing, screening, FIS, hold rooms, concessions, baggage, services879
requirement.general-aviationGA terminal, hangar and apron needs229
requirement.apronCommercial and based apron needs140
requirement.landsideRoads, curb, parking and rental car needs392
requirement.supportARFF, fuel, maintenance, ATCT and other support needs94
alternative.consideredDevelopment alternatives as considered, with their options479
alternative.evaluationEvaluation criteria and scoring of the alternatives2
alternative.preferredThe preferred development alternative107
environmental.noiseNoise contours and impacts187
environmental.waterWetlands, floodplains, water quality, drainage and stormwater22
environmental.bioticSpecies and biotic communities40
environmental.hazmatHazardous materials and pollution prevention2
environmental.culturalHistoric, cultural and Section 4(f) resources42
environmental.otherAir quality, land use compatibility, light, energy, socioeconomic and other NEPA categories53
cip.projectCapital improvement programme projects, phases and costs62
financial.historicalHistorical revenues, expenses and operating statistics336
financial.forecastForecast revenues, expenses and net revenues802
financial.fundingFunding sources, needs, shortfalls and contingency plans235
public-involvementTechnical advisory committee and public meetings6
alpAirport Layout Plan set14
sustainabilitySustainability plan, initiatives and action plan197
covidCovid-19 disclaimer and assumptions12

By kind

KindFacts
table cell9327
table row1891
statement1560
figure label269
layout line26
draft statement (not in the final)8

Summary by chapter

Executive Summary (pages 15 to 29)

Base year 2017, a 20-year forecast from 2018 to 2037, approved by the FAA on 24 March 2020. The summary repeats the key tables as Tables 1-1 to 1-15. Enplanements grow from 1,436,224 (2017) to 2,747,325 (2037), a 3.3 percent rate. Based aircraft grow from 350 to 498. Operations grow from 303,044 to 382,167. The Annual Service Volume is 451,619, and 2019 operations of 356,212 stood at 79 percent of it. The Covid-19 note asks the reader to treat the forecast years as activity levels, not dates.

1. Introduction (pages 31 to 36)

Purpose, goals and the planning steps (Figure 1-1). Ten records.

2. Inventory of Existing Conditions (pages 37 to 110)

  • Site. About 2,400 acres. History from the naval air station commissioned in 1942 to the latest terminal expansion.
  • Airfield. Four runways in Table 2-1: 9L/27R 11,002 by 150 ft, 9C/27C 3,578 by 75 ft, 9R/27L 5,839 by 75 ft, 18/36 6,002 by 150 ft, each with surface, lighting, marking, approach aids, gear strengths and end coordinates. Declared distances (Table 2-2) and design codes (Tables 2-3 to 2-8). Pavement condition from the APER: 46 percent of taxiway pavement was poor to serious.
  • NAVAIDs and lighting. Eight instrument approaches (Table 2-9), ILS on 9L, 9R and 27R. The SAA reports approach lights, REILs, edge lights, threshold lights and apron lighting in good condition.
  • Terminal. Former Terminal B: built 1992, about 178,000 sq ft conditioned. Former Terminal A: built 1996 with a 60,000 sq ft FIS, about 209,000 sq ft conditioned. The latest expansion added Gates 1 to 4. Figures 2-16 to 2-21 are the floor plans the twin already traced.
  • Landside. Curb frontage of 906 ft, 764 usable. Lot capacities on Figure 2-22, among them the 830-space garage (Lot G), Lot H at about 230, Lot L at 806 and Lot E at 608. Eight rental car companies.
  • General aviation. 348 based aircraft. Building sizes for MillionAir, CE Avionics, Constant Aviation, Hill Dermaceuticals, L3Harris and the South East Ramp complex (24 buildings, over 275,000 sq ft, with the 48,610 sq ft GSA hangar).
  • Cargo and support. A cargo building of about 53,000 sq ft with 6,600 sq ft of cold storage. ARFF Index D with five vehicles. The ATCT. Table 2-10 lists 24 fuel tanks with owner, address, capacity and grade. The 30th Street fuel farm holds 950,000 gallons of Jet-A.
  • Airspace and land use. Airspace classes, nearby airports (Table 2-11), zoning and on-airport land use.

3. Aviation Demand Forecasts (pages 111 to 180)

The largest chapter by records (6,543), because its tables give every year from 1997 to 2037. Socioeconomic tables (3-1 to 3-5). Enplanement methods and the preferred forecast (3-6 to 3-11). Based aircraft and fleet mix (3-12 to 3-18). Operations by type (3-19 to 3-30). Peak activity (3-31). The comparison with the FAA TAF (3-32). Table 3-33 holds every forecast year: enplanements, itinerant and local operations by type, total operations and based aircraft. Air cargo was 332 tons in 2017.

4. Demand Capacity and Facility Requirements (pages 181 to 278)

  • Design. Critical aircraft by runway (Tables 4-5, 4-6): Boeing 787-8 on 9L/27R (D-V, TDG 5). The future critical aircraft for 9R/27L and 18/36 is the A320 family (C-III, TDG 3).
  • Capacity. Hourly capacity of 353 VFR and 118 IFR in the east-west flow (Table 4-12). Demand reaches 85 percent of ASV by 2037 (Table 4-14). Converging approaches with ORL, DED, X50, MCO, EVB, X21 and DAB (Figures 4-4 to 4-16).
  • Runways and taxiways. Length needs: 7,200 ft for 18/36 and 9R/27L, 4,200 ft for 9C/27C. Width: 9R/27L to 150 ft. Pavement condition per runway (Tables 4-21 to 4-24). Safety areas (4-25 to 4-27). Width-deficient taxiways R and S (4-28). Taxiway PCI (4-29).
  • Terminal. Gates from 16 to 19 by PAL 4 (Table 4-32). Space by function, existing against PAL 4 (Table 4-42). Ticketing grows from 11,648 to 29,452 sq ft. Hold rooms grow from 61,604 to 66,918 sq ft. Screening lanes grow from 8 to 12.
  • General aviation. T-hangars short by 17 units at baseline and 87 by PAL GA 4. Conventional hangar space turns short at PAL GA 3 (Tables 4-43 to 4-54).
  • Landside. Road volume over capacity on Airport Boulevard by PAL 2 (Table 4-55). Curb, long-term, hourly, employee and rental car needs (4-56 to 4-62). The long-term need reaches 5,156 spaces by PAL 4.
  • Support. Jet-A storage turns short from PAL 1 (Table 4-63). The ATCT fails the FAA siting criteria.

5. Development Alternatives (pages 279 to 334)

Three alternatives (Figures 5-1 to 5-6) for runways, taxiways, aprons, terminal gates and services, GA, landside, support and ancillary items (Tables 5-2 to 5-12). Alternatives 1 and 2 tied at nine points and Alternative 3 scored minus two (Figure 5-23). The preferred alternative (Tables 5-13 to 5-19, Figures 5-24 to 5-27):

  • 9R/27L gets a split extension to 7,200 ft. 18/36 becomes a TDG 5, ADG V taxiway, with part of it removed. The 27C end moves 643 ft east. 9L/27R stays as it is.
  • Full parallel taxiways north of 9L/27R (Taxiway A) and north of 9R/27L (Taxiway E). Taxiway M is extended.
  • Three new gates for ADG III to V with a 61,400 sq ft east terminal expansion and 37,447 sq yd of apron. Gate 16 is upgraded with a 12,600 sq ft west expansion and the flight kitchen moves.
  • About 100,800 sq ft of conventional hangars and 90 T-hangar units.
  • A five-level garage of about 4,000 spaces and a ConRAC ready/return structure of 2,250 spaces.
  • The ATCT moves east. A secondary maintenance facility. Property acquisition of 225.90 acres. A 39.34-acre solar farm.

The August 2021 draft differs from the final in eight statements. Its section 5.4 is a placeholder for cost estimates, which the final moved to Chapter 7. It counts 3 surplus T-hangar units where the final counts 1, and it says "RAC" where the final says "ConRAC".

6. Environmental Overview (pages 335 to 372)

Each NEPA category in turn (sections 6.2 to 6.21). Listed species for Seminole County (Tables 6-1 to 6-4). Sites with recognized environmental concerns (Table 6-5) and the closed landfill east of 18/36. Noise: the off-airport 65 DNL area grows from 73.5 acres in 2017 to 229 acres at PAL 3. The Executive Summary counts 22 noise-sensitive areas in 2017 and Table 6-6 totals 25. With the preferred airfield it falls to 146.3 acres at PAL 4 (Table 6-6, Figures 6-4 to 6-18). Seven wetland areas from the National Wetlands Inventory (Figure 6-19). Floodplains (Figure 6-3).

7. Financial Plan (pages 373 to 408)

Historical operating statistics, revenues and expenses for 2015 to 2020 (Tables 7-1, 7-3, 7-4). The capital programme (Table 7-2, below). Forecast revenues and expenses (7-5 to 7-8). Funding by phase and source (7-9 to 7-11). With 3 percent a year inflation the programme is $1,163,423,600 (Table 7-9). That figure includes debt service on the recent terminal expansion. The Local/PFC gap is $297.4 million.

8 to 10. Public involvement, Airport Layout Plan, sustainability (pages 409 to 438)

Chapter 8 records the advisory committee and the public meeting. Chapter 9 describes the ALP sheets. The sheets themselves are in Volume II, Appendix J, which we do not hold. Chapter 10 holds the sustainability survey, the initiatives and the action plan (Tables 10-1 to 10-5).

The capital improvement programme (Table 7-2)

Costs are 2021 estimates before inflation. The phase bands in the table are near term (0 to 5 years), mid term (5 to 10) and long term (10 to 20).

#ProjectPhaseFederalStateLocal/PFCPrivateEstimated cost
1Relocated Maintenance Complex1 (2022-2026)$0$3,950,000$3,950,000$0$7,900,000
2Taxiway A3 Relocation1 (2022-2026)$4,770,000$265,000$265,000$0$5,300,000
3Taxiway K1 Relocation1 (2022-2026)$2,610,000$145,000$145,000$0$2,900,000
4Taxiway M Extension1 (2022-2026)$4,500,000$250,000$250,000$0$5,000,000
5Taxiway P Removal & Relocate Compass Calibration Pad1 (2022-2026)$1,080,000$60,000$60,000$0$1,200,000
6New 35,000 SF Conventional Hangar1 (2022-2026)$0$3,150,000$3,150,000$0$6,300,000
7South East Ramp Expansions - Phase 1B and 2A1 (2022-2026)$0$0$5,500,000$7,100,000$12,600,000
8Storm Pond Expansion1 (2022-2026)$11,340,000$630,000$630,000$0$12,600,000
9New Fire Station1 (2022-2026)$0$0$4,100,000$0$4,100,000
10Solar Farm Development1 (2022-2026)$0$0$4,000,000$21,600,000$25,600,000
11Obstruction Survey1 (2022-2026)$225,000$12,500$12,500$0$250,000
12Design & Construct FIS Improvements1 (2022-2026)$0$8,000,000$8,000,000$0$16,000,000
13Taxiway A - Full Parallel Taxiway System2 (2027-2031)$43,200,000$2,400,000$2,400,000$0$48,000,000
14Runway 9L-27R Reconstruction2 (2027-2031)$80,820,000$4,490,000$4,490,000$0$89,800,000
15GA Apron Expansion2 (2027-2031)$0$0$3,100,000$0$3,100,000
16Runway 9R-27L Upgrades - Split Extension to a Total Length of 7,200 Feet2 (2027-2031)$39,600,000$2,200,000$2,200,000$0$44,000,000
17Construct New Parallel Taxiway North of Runway 9R-27L2 (2027-2031)$18,990,000$1,055,000$1,055,000$0$21,100,000
18Runway 18-36 Conversion2 (2027-2031)$8,100,000$450,000$450,000$0$9,000,000
19South East Ramp Expansions - Phase 1A, 2A, and 2B2 (2027-2031)$0$0$1,148,000$19,252,000$20,400,000
20Construct 4-Level Consolidated Rental Auto Center (ConRAC) Garage2 (2027-2031)$0$0$148,800,000$0$148,800,000
21Construct 5-Level Parking Garage2 (2027-2031)$0$74,600,000$74,600,000$0$149,200,000
22Widen Airport Boulevard2 (2027-2031)$0$3,200,000$3,200,000$0$6,400,000
23Runway 9C-27C Eastward Extension and Taxiway C Improvements/Extension3 (2032-2041)$5,670,000$315,000$315,000$0$6,300,000
24Taxiway B Improvements3 (2032-2041)$1,800,000$100,000$100,000$0$2,000,000
25Taxiway S Improvements3 (2032-2041)$1,800,000$100,000$100,000$0$2,000,000
26Taxiway U Improvements3 (2032-2041)$450,000$25,000$25,000$0$500,000
27South East Ramp Expansions - Phase 2A, 3, and 43 (2032-2041)$0$0$2,165,000$28,635,000$30,800,000
28Commercial Terminal Gate Modifications/Expansion3 (2032-2041)$20,000,000$5,625,000$86,875,000$0$112,500,000
29Commercial Terminal Services Modifications3 (2032-2041)$0$2,160,000$41,040,000$0$43,200,000
30Relocate ATCT3 (2032-2041)$11,250,000$625,000$625,000$0$12,500,000
31Jet-A Fuel Storage Expansion3 (2032-2041)$0$0$1,050,000$1,350,000$2,400,000
32Rail Access Expansion3 (2032-2041)$0$0$1,990,000$1,610,000$3,600,000
Subtotal Phase 1$24,525,000$16,462,500$30,062,500$28,700,000$99,750,000
Subtotal Phase 2$190,710,000$88,395,000$241,443,000$19,252,000$539,800,000
Subtotal Phase 3$40,970,000$8,950,000$134,285,000$31,595,000$215,800,000
Grand Totals$256,205,000$113,807,500$405,790,500$79,547,000$855,350,000

What maps to the twin

twin_coverage in the database lists each thing the plan names, the twin id it maps to, how many facts name it, the plan stage it feeds (from docs/plans/mission-studio-interchange-collector.md in StellarView), the RFP requirements it touches and its sensor class. The mapping is by the words in each record, so a count is a count of mentions.

What the twin already holds and the plan describes:

Plan namesTwin idFactsStageWhat the plan adds
The terminal, its gates, FIS and Gates 1 to 4terminal, terminal-intl, terminal-east755namesSpace by function, existing and by PAL (Tables 4-31 to 4-42)
Runways 9L/27R, 9R/27L, 9C/27C, 18/36rwy-*627mapPavement condition by section, safety areas, declared distances, critical aircraft, future length and use
Apronssurf-aprons219mapApron areas and condition, the apron expansions
Gates and boarding bridgesboarding-bridge164inventoryGate 16 limited to a regional jet; 19 gates by PAL 4
Fuelfuel-farm136inventory24 tanks with owner, place, capacity and grade (Table 2-10); 7-day storage need (Table 4-63)
Baggage make-up and claimmakeup-unit, claim-carousel141inventoryAreas, EDS machines, claim devices by PAL (Table 4-38)
Parking lots and the garageparking-lot, garage114inventoryCapacity of each lot (Figure 2-22), demand by PAL (Tables 4-59 to 4-61)
Rental carsrental-cars101namesReady, return and QTA needs (Table 4-62)
ILS, PAPI, MALSR, REIL, edge lights, ASOS, wind conesasset classes119senseWhich runway end has which aid; SAA's condition reports
The ATCTatct12mapCommissioned 1993, finished 1996, past its useful life, to move east

Gaps: what the plan states and the twin lacks

  1. Named buildings outside the terminal. The plan names and sizes the ARFF station, airport maintenance, the flight kitchen, the police station with badging and the goods-in dock, the cargo building (about 53,000 sq ft), MillionAir (30,955 sq ft main facility, 24,000 and 14,400 sq ft hangars), the SAA's 44,000 sq ft hangar, CE Avionics, Constant Aviation, Hill Dermaceuticals (65,000 sq ft), the L3Harris buildings, the South East Ramp complex (24 buildings) with the GSA hangar, the Avocet hangar and the Allegiant training centre. In the twin these are OSM footprints called "Building" or "Hangar", with no name, use or area. Figures 2-24 and 2-25 place them. This is work for the Names stage.
  2. Planned projects. The twin holds no future state. Thirty-two CIP projects, the preferred alternative's parcels and the moved ATCT, maintenance area, fire station, solar farm, ConRAC and 4,000-space garage have no place in it. Neither do the runway changes (9R/27L to 7,200 by 150 ft, 18/36 to a taxiway, 27C 643 ft east).
  3. Taxiways one by one. The plan names about twenty taxiways and connectors (A, A3, B, B2, C, E, K, K1, L, M, P, R, S and S1 to S5, T, U) with design groups, widths and PCI (Tables 4-28, 4-29). The twin has one item for all taxiways and assumes 75 ft widths. Taxiways R and S vary from 50 to 75 ft and 35 to 50 ft.
  4. Forecasts and activity levels. No forecast, PAL or peak-hour figure is in the twin. The stated plan's 3, 5 and 10 year projection can start from Table 3-33 and the PAL map in this database.
  5. Parking capacities. Each lot in asset-list.json says "not yet captured". Figure 2-22 gives most of them.
  6. Fuel tanks. One unplaced fuel farm on the shelf against 24 tanks in Table 2-10.
  7. Utilities. Figure 2-26 draws water, sewer, force mains, gas, lift stations, manholes and hydrants. The twin's water, gas, sewer and hydrant records are unplaced or on the shelf.
  8. Environment. Noise contours by PAL, the seven wetland areas, the floodplains and the closed landfill east of 18/36. The twin has ponds and drainage layers only.
  9. Terminal areas by function. Table 4-42 gives existing square feet for ticketing, screening, FIS, hold rooms, concessions, baggage and services. The traced sections in the twin have functions but no totals to set against these.
  10. Sensing. The ARFF station, the fuel tanks and the ATCT have no class in 04-plan/sensor-plan.json.

What could not be read

  • Forty-two figures are pictures with no text layer (marked "image only" above). Their records hold the caption and the sentence that introduces each one. Among them: the existing facilities map (2-7), the APER pavement charts (2-8 to 2-14), the terminal alternative floor plans (5-10 to 5-18, 5-26, 5-27), the evaluation matrix (5-23), floodplains (6-3) and wetlands (6-19). The evaluation totals are stated in the text.
  • Drawing labels have no position. The 49 full-page drawings give their labels in reading order. A label such as "50.80 ACRES" on Figure 5-24 says how big a parcel is but not which parcel. The legend colours (aeronautical, non-aeronautical, acquisition) are not in the text layer.
  • Volume II was not read. It holds the detailed CIP cost estimates (Appendix D), the forecast supplements (Appendix C) and the ALP sheet set (Appendix J). We do not hold it.
  • Complex table layouts. Cell-to-column matching uses printed positions. Tables with labels set beside wrapped headers (4-63 fuel, 6-6 noise, 3-31 peak) carry some cells under the wrong column label. The row record beside each cell keeps the printed row, so a cell can be checked.
  • Internal differences in the plan. Section 7.2 gives inflated phase totals of $109.0, $683.8 and $336.2 million. Table 7-9 gives $126.2, $701.0 and $336.2 million, because it adds terminal debt service. The noise counts differ between the Executive Summary and Table 6-6. Both are recorded as printed.

Every table and figure

Titles as printed, with dashes made plain. The page is the PDF page. "Facts" counts the cell, row and label records under each one.

Volume I tables (163)

No.TitlePageHow it was readFacts
1-1Preferred Passenger Enplanement Forecast Summary16text layer12
1-2Based Aircraft Fleet Mix Distribution16text layer5
1-3Preferred Based Aircraft Forecast Summary17text layer4
1-4Preferred Aircraft Operations Forecast Summary17text layer20
1-5Annual Service Volume18text layer8
1-6Critical Aircrafts Summary19text layer5
1-7Future Runway Length Requirements Summary20text layer12
1-8Future Runway Width Requirements Summary20text layer12
1-9Aircraft Gate Requirements Summary21text layer2
1-10Ticketing/Check-In Area Requirements22text layer29
1-11TSA Passenger Screening and FIS Requirements Summary22text layer52
1-12Baggage Handling Facility Requirements Summary23text layer41
1-13Terminal Service Requirements Summary24text layer21
1-14General Aviation Facility Requirements Summary24text layer25
1-15Preferred Airside Development Alternative Summary27text layer23
2-1Runway Specifications53text layer28
2-2Declared Distances54text layer34
2-3Aircraft Approach Category (AAC)59text layer5
2-4Airplane Design Group (ADG)60text layer6
2-5Visibility Minimums60text layer6
2-6SFB’s Existing RDCs60text layer4
2-7Runway and Taxiway Safety Area Dimensions63text layer36
2-8Runway Protection Zone Dimensions64text layer28
2-9SFB Instrument Approach Procedure Summary67text layer7
2-10Existing Fuel Tank Facilities95text layer48
2-11Airports Surrounding Orlando Sanford International Airport (SFB)104text layer16
3-1Historical and Forecast GDP Growth (CY 1997-2037)116text layer41
3-2Historical and Forecast Population Growth (CY 1997-2017)118text layer41
3-3Non-Agriculture Employment (June 2017 to June 2018)119text layer79
3-4Historical and Forecast Employment Growth (CY 1997-2017)122text layer41
3-5Market Area Leading Employers122text layer10
3-6TAF vs. SAA Historical Enplanements - Five Year Average Difference124text layer26
3-7Enplanement Trend Analysis125text layer99
3-8Enplanement Regression Analysis127text layer226
3-9Enplanement Market Share Analysis131text layer463
3-10Enplanement Forecast Comparison133text layer387
3-11Preferred Enplanement Forecast Comparison - Domestic and International Split135text layer120
3-12Historical Based Aircraft136text layer11
3-13Based Aircraft Trend Analysis137text layer99
3-14Based Aircraft Regression Analysis139text layer222
3-15Based Aircraft Market Share Analysis143text layer470
3-16Based Aircraft Forecast Comparison145text layer399
3-17Preferred Based Aircraft Forecast147text layer66
3-18Preferred Based Aircraft Fleet Mix Forecast148text layer132
3-19Total Operations Forecast by Year151text layer100
3-20Air Carrier Operations and Fleet Mix Forecast152text layer55
3-21Air Cargo Tonnage Forecast153text layer96
3-22GA and Air Taxi Operations OPBA Forecast155text layer101
3-23GA and Air Taxi/Commuter Trend Analysis156text layer99
3-24GA and Air Taxi Operations Regression Analysis159text layer222
3-25GA Operations and Air Taxi/Commuter Market Share Analysis163text layer466
3-26GA and Air Taxi/Commuter Operations Forecast Comparison165text layer419
3-27GA and Air Taxi Operations Forecast169text layer216
3-28GA Operations - Historical Itinerant and Local Shares171text layer55
3-29GA Operations - Itinerant and Local Forecast171text layer120
3-30Military Operations Forecast172text layer63
3-31Peak Activity Forecast175text layer155
3-32Master Plan Forecasts Comparison to TAF177text layer54
3-33Enplanements and Operations Summary179text layer429
4-1Aircraft Approach Category184text layer5
4-2Airplane Design Group (ADG)184text layer6
4-3Runway Design Code185text layer110
4-4Operations by TDG187text layer38
4-5Existing Critical Aircraft Requirements189text layer21
4-6Future Critical Aircraft Requirements190text layer21
4-7Future TDG Required Width190text layer47
4-8Airfield Operational Configurations192text layer14
4-9Aircraft Characteristics192text layer5
4-10SFB Annual Operations by Aircraft Classification - TFMSC193text layer23
4-11Usable Runway Exits194text layer8
4-12Hourly Capacity196text layer16
4-13Annual Service Volume Calculation197text layer66
4-14Demand vs. Airfield Capacity198text layer19
4-15Average Aircraft Delay200text layer24
4-16Public-Use Airports Near SFB201text layer60
4-17Runway Designation Calculation220text layer14
4-18Airplane Weight Categorization for Runway Length Requirements221text layer4
4-19Takeoff Distance Requirements Summary227text layer75
4-20Runway Width Requirements229text layer7
4-21Runway 9L/27R Pavement Condition Summary230text layer33
4-22Runway 9R/27L Pavement Condition Summary233text layer10
4-23Runway 9C/27C Pavement Condition Summary233text layer9
4-24Runway 18/36 Pavement Condition Summary234text layer93
4-25Existing & Future Runway Safety Area (RSA) Dimensions235text layer7
4-26Existing & Future Runway Object Free Area Dimensions235text layer9
4-27Existing & Future Runway Protection Zone Dimensions236text layer33
4-28Width Deficient Taxiways237text layer4
4-29Taxiway Pavement Condition238text layer36
4-30Taxiway Protective Surfaces Dimensions239text layer76
4-31Peak Hour Passenger, Operations, and Aircraft Assumptions244text layer40
4-32Aircraft Gate Requirements245text layer6
4-33Ticketing/Check-In Area Requirements246text layer28
4-34Security Screening Checkpoint248text layer52
4-35Hold Rooms249text layer21
4-36Concessions Requirement250text layer63
4-37Concessions Requirement by Concourse251text layer49
4-38Baggage Facilities252text layer41
4-39Restroom Requirements253text layer46
4-40Meet and Greet Area253text layer16
4-41Terminal Services254text layer21
4-42Terminal Requirements Summary255text layer56
4-43Planning Activity Level - General Aviation Characteristics256text layer25
4-44General Aviation Terminal Requirements257text layer25
4-45Aircraft Storage Assumptions258text layer15
4-46Aircraft Space Requirements (Conventional/Box Hangars)258text layer3
4-47Existing Based Aircraft Storage Hangars259text layer9
4-48Conventional Hangar Requirements260text layer40
4-49T-Hangar Requirements260text layer30
4-50Space Requirements for Based Aircraft Type261text layer5
4-51Existing Based Aircraft Apron262text layer6
4-52General Aviation Based Aircraft Apron Requirements262text layer35
4-53Commercial Jet Based Aircraft Apron Requirements262text layer20
4-54General Aviation Itinerant Aircraft Apron Requirements263text layer25
4-55Access Roadway Volume/Capacity265text layer40
4-56Baseline Passenger Distribution Assumptions266text layer21
4-57Baseline Curb Requirements267text layer80
4-58Curb Requirements Baseline - PAL 4268text layer19
4-59Long-Term Parking Requirements270text layer50
4-60Hourly Parking Requirements271text layer7
4-61Employee Parking Requirements272text layer6
4-62Rental Car Facility Requirements273text layer91
4-63Fuel Storage Facility Requirements275text layer62
5-1Evaluation Criteria for Preferred Development Alternative281text layer7
5-2Runway Modifications Summary289text layer5
5-3Existing & Proposed Runway 9R-27L Declared Distances290text layer24
5-4FAA’s Parallel Runway Design Separation Requirements291text layer6
5-5Taxiway Modifications Summary295text layer36
5-6Apron Modifications Summary301text layer4
5-7Development Alternative 1: Gate Alternatives Summary303text layer11
5-8Development Alternative 2: Gate Alternatives Summary304text layer15
5-9Development Alternative 3: Gate Alternatives Summary304text layer17
5-10General Aviation Modifications Summary311text layer9
5-11Support Facility Modifications Summary318text layer15
5-12Ancillary Modifications Summary321text layer18
5-13Preferred Runway Modifications Summary328text layer4
5-14Preferred Taxiway Modifications Summary331text layer12
5-15Proposed Apron Modifications Summary331text layer3
5-16Preferred Commercial Terminal Gate Modifications332text layer1
5-17Preferred General Aviation Modifications Summary333text layer2
5-18Preferred Support Facility Modifications Summary334text layer4
5-19Preferred Ancillary Modifications Summary334text layer6
6-1Seminole County Listed Species: Miscellaneous345text layer5
6-2Seminole County Listed Species: Insects346text layer10
6-3Seminole County Listed Species: Animals346text layer6
6-4Seminole County Listed Species: Vegetation348text layer3
6-5Active Sites with Recognized Environmental Concerns352text layer35
6-6AEDT Noise Contour 65 DNL Off-Airport Impact Areas359text layer115
7-1Historical Background Operating Statistics377text layer56
7-2SFB Capital Improvement Program by Eligible Funding Source379page image, read by eye36
7-3SFB Historical Revenues: 2015-2020383text layer120
7-4SFB Historical Expenses and Net Revenues: 2015-2020386text layer112
7-5Forecast of Operating Revenues and Expenses391text layer200
7-6Forecast of Operating Revenues and Expenses (Continued)392text layer220
7-7Forecast of Partial Non-Operating Revenues (Not including FAA discretionary or local funding)399text layer140
7-8Forecast of Minimum Net Revenues Available for CIP401text layer105
7-9Summary of SFB ACIP with Monetary Inflation Escalators by Phase402text layer20
7-10Funding Needs by Phase and Eligible Source*404text layer64
7-11Funding Needs by Phase and Eligible Source for Contingency Planning*406text layer60
10-1Survey 1 - Airport Sustainability Initiative Rankings422text layer4
10-2Committee Suggested ‘Open Response’ Initiatives from Survey 1424text layer20
10-3Potential Airport Sustainability Initiatives429text layer42
10-4Model Performance Tracking Matrix - ‘Management Performance Scale’433text layer29
10-5SFB Airport Sustainability Action Plan436text layer42

Volume I figures (123)

No.TitlePageHow it was readFacts
1-1Steps in the Master Planning Process34image only0
2-1Location Map40drawing labels0
2-2Vicinity Map41drawing labels0
2-3NPIAS Airport Classifications42image only0
2-4VFR Wind Rose49drawing labels0
2-5IFR Wind Rose50drawing labels0
2-6All Weather Wind Rose51drawing labels0
2-7Existing Airport Facilities52image only0
2-8APER's Figure 3.1.2 - Average Age of Pavement at Inspection56image only0
2-9APER’s Figure 3.1.3 - Airfield Pavement Functional Classification Use by Area56image only0
2-10APER’s Figure 3.1.4 (a) - Pavement Surface Type by Area (SF)57image only0
2-11APER’s Figure 4.1.1 - Latest Condition - Overall Network57image only0
2-12APER’s Figure 4.1.2 (a) - Latest Condition - Runway Pavements58image only0
2-13APER’s Figure 4.1.2 (b) - Latest Condition - Taxiway Pavements58image only0
2-14APER’s Figure 4.1.2 (c) - Latest Condition - Apron Pavements59image only0
2-15SFB’s Airfield Pavement Condition Index61drawing labels0
2-16Terminal Gates 10 - 16 First Floor69drawing labels8
2-17Terminal Gates 10 - 16 Second Floor73drawing labels9
2-18Terminal Gates 5 - 9 First Floor74drawing labels8
2-19Terminal Gates 5 - 9 Second Floor75drawing labels7
2-20Terminal Gates 1 - 4 First Floor77drawing labels4
2-21Terminal Gates 1 - 4 Second Floor78drawing labels4
2-22Vehicle Facilities ≤ Half Mile from the Terminal Area81drawing labels12
2-23Vehicle Facilities ≥ Half Mile & ≤ 1 Mile from the Terminal Area82drawing labels5
2-24General Aviation, Cargo, and Other Tenant Facilities85drawing labels0
2-25Airport Support Facilities93drawing labels0
2-26Existing Utility Network97drawing labels0
2-27U.S. Airspace Classifications101drawing labels2
2-28Regional Airspace102drawing labels0
2-29Existing Off-Airport Zoning Districts106image only0
2-30Existing On-Airport Land Use107drawing labels0
3-1Market Area Map114image only0
3-2Historic Annual Growth of GDP (CY 1997-2017)115caption and figure text0
3-3Historic Annual Growth of Population (CY 1997-2017)117caption and figure text0
3-4Market Area Employment By Industry120caption and figure text0
3-5Historic Annual Growth of Employment (CY 1997-2017)121caption and figure text0
3-6Historical GA and Air Taxi/Commuter Operations154image only0
4-1Taxiway Design Groups187image only0
4-2Average Delay Chart from AC 150/5060-5199image only0
4-3Instrument Approach Procedures Symbol Legend202drawing labels0
4-4SFB's and ORL's Converging Instrument Approach Procedures204drawing labels4
4-5SFB's and DED's Converging Instrument Approach Procedures - 1205drawing labels4
4-6SFB's and DED's Converging Instrument Approach Procedures - 2206drawing labels5
4-7SFB's and X50's Converging Instrument Approach Procedures - 1207drawing labels5
4-8SFB's and X50's Converging Instrument Approach Procedures - 2209drawing labels5
4-9SFB's and MCO's Converging Instrument Approach Procedures - 1210drawing labels6
4-10SFB's and MCO's Converging Instrument Approach Procedures - 2211drawing labels4
4-11SFB's and MCO's Converging Instrument Approach Procedures - 3212drawing labels3
4-12SFB's and EVB's Converging Instrument Approach Procedures - 1213drawing labels5
4-13SFB's and EVB's Converging Instrument Approach Procedures - 2214drawing labels4
4-14SFB's and X21's Converging Instrument Approach Procedures - 1215drawing labels5
4-15SFB's and X21's Converging Instrument Approach Procedures - 2216drawing labels4
4-16SFB's and DAB's Converging Instrument Approach Procedures218drawing labels5
4-17Boeing 787-8 Takeoff Distance - Standard Day (59°F) Temperature223caption and figure text0
4-18Boeing 787-8 Takeoff Distance - Standard Day + 45°F (104°F) Temperature223caption and figure text0
4-19Airbus A320 - Takeoff Distance Required - Standard Day (59°F)224caption and figure text0
4-20A320 - Takeoff Distance Required - Standard Day +59F (118F)225caption and figure text0
4-21Runway 9C/27C Required Runway Length per FAA AC 150/5325-4B's Figure 2-2226image only0
4-22Runway Landing Length Requirements229caption and figure text0
4-23SFB Airfield Pavement Condition Map231drawing labels0
4-24Typical Two-Lane SSCP with AIT247image only0
4-25Highway Capacity Manual Roadway Capacity264caption and figure text0
4-26Peak Parking Occupancy Curve269caption and figure text0
4-27Long-Term Parking Requirements Summary271caption and figure text0
5-1Development Alternative 1283drawing labels30
5-2Development Alternative 2284drawing labels31
5-3Development Alternative 3285drawing labels23
5-4Landside Development Alternative 1286drawing labels0
5-5Landside Development Alternative 2287drawing labels0
5-6Landside Development Alternative 3288drawing labels0
5-7Runway 9R/27L Development Alternative 1a - Declared Distances290image only0
5-8Runway 9R/27L Development Alternative 1b - Declared Distances292image only0
5-9Runway 9R/27L Development Alternative 2 - Declared Distances293image only0
5-10All Terminal Services Alternatives - Provide Second Floor Expansion305image only0
5-11International Arrivals Swap Alternative306image only0
5-12Terminal Services Development Alternatives Summary306image only0
5-13Terminal Services Development Alternative 1: First Floor308image only0
5-14Terminal Services Development Alternative 1: Second Floor308image only0
5-15Terminal Services Development Alternative 2: First Floor309image only0
5-16Terminal Services Development Alternative 2: Second Floor309image only0
5-17Terminal Services Development Alternative 3: First Floor310image only0
5-18Terminal Services Development Alternative 3: Second Floor310image only0
5-19Landside Facility Walkability Measurement314image only0
5-20Landside Development Alternative 1315image only0
5-21Landside Development Alternative 2316image only0
5-22Landside Development Alternative 3317image only0
5-23Alternatives Evaluation Summary327image only0
5-24Preferred Development Alternative329drawing labels28
5-25Preferred Landside Development Alternative330drawing labels2
5-26Preferred Terminal Services Modifications - First Floor332image only0
5-27Preferred Terminal Services Modifications - Second Floor333image only0
6-1Section 4(f)342drawing labels0
6-2Unique Soils344image only0
6-3Floodplains350image only0
6-4Base Year (2017) Noise Exposure Map (NEM)355drawing labels4
6-565 DNL Impacted Area A357caption and figure text0
6-665 DNL Impacted Area B357caption and figure text0
6-765 DNL Impacted Area C357caption and figure text0
6-865 DNL Impacted Area D358caption and figure text0
6-9PAL 1 AEDT Noise Contours361drawing labels7
6-10PAL 2 AEDT Noise Contours362drawing labels8
6-11PAL 3 AEDT Noise Contours363drawing labels8
6-12PAL 4 AEDT Noise Contours364drawing labels10
6-13PAL 2 Area A2365caption and figure text0
6-14PAL 2 Area A3365caption and figure text0
6-15PAL 2 Area C2365caption and figure text0
6-16PAL 4 Area D2366caption and figure text0
6-17PAL 1 Area E366caption and figure text0
6-18PAL 4 Area F366caption and figure text0
6-19NWI Wetland Data371image only0
7-1Historical Enplanements and Operations377image only0
7-2Historical Operating Revenues by Source384caption and figure text0
7-3Change in Revenue Shares over Time (data from Table 1-3)385caption and figure text0
7-4Historical Operating Expenses by Category387caption and figure text0
7-5Change in Expense Shares over Time (data from Table 1-4)388caption and figure text0
7-6Forecast of Minimum Net Revenues by Source393caption and figure text0
7-7Growth in Revenues Available for CIP Funding402caption and figure text0
7-8PFC Eligible Versus CIP Available Funding405caption and figure text0
7-9Local Share Minus PFC Eligible Versus CIP Available Funding405caption and figure text0
10-1Sustainability Planning Process421caption and figure text0
10-2Four Focus Areas of Airport Sustainability - EONS424image only0
10-3OODA Loop / Boyd’s Cycle434caption and figure text0
10-4Excerpt of ACRP Report 119’s Table 4-2 - Sustainability Activity List, Including Performance434image only0

Chapter 5 draft v1.3 tables (19)

Numbered and titled as in the final; pages are the draft's own.

No.TitlePageHow it was readFacts
5-1Evaluation Criteria for Preferred Development Alternative6text layer0
5-2Runway Modifications Summary15text layer0
5-3Existing & Proposed Runway 9R-27L Declared Distances16text layer0
5-4FAA’s Parallel Runway Design Separation Requirements17text layer0
5-5Taxiway Modifications Summary23text layer0
5-6Apron Modifications Summary27text layer0
5-7Development Alternative 1: Gate Alternatives Summary29text layer0
5-8Development Alternative 2: Gate Alternatives Summary30text layer0
5-9Development Alternative 3: Gate Alternatives Summary30text layer0
5-10General Aviation Modifications Summary37text layer0
5-11Support Facility Modifications Summary44text layer0
5-12Ancillary Modifications Summary46text layer0
5-13Preferred Runway Modifications Summary54text layer0
5-14Preferred Taxiway Modifications Summary57text layer0
5-15Proposed Apron Modifications Summary57text layer0
5-16Preferred Commercial Terminal Gate Modifications58text layer0
5-17Preferred General Aviation Modifications Summary59text layer0
5-18Preferred Support Facility Modifications Summary60text layer0
5-19Preferred Ancillary Modifications Summary60text layer0

Chapter 5 draft v1.3 figures (27)

Numbered and titled as in the final; pages are the draft's own.

No.TitlePageHow it was readFacts
5-1Development Alternative 19drawing labels0
5-2Development Alternative 210drawing labels0
5-3Development Alternative 311drawing labels0
5-4Landside Development Alternative 112drawing labels0
5-5Landside Development Alternative 213drawing labels0
5-6Landside Development Alternative 314drawing labels0
5-7Runway 9R/27L Development Alternative 1a - Declared Distances16image only0
5-8Runway 9R/27L Development Alternative 1b - Declared Distances18image only0
5-9Runway 9R/27L Development Alternative 2 - Declared Distances19image only0
5-10All Terminal Services Alternatives - Provide Second Floor Expansion31image only0
5-11International Arrivals Swap Alternative32image only0
5-12Terminal Services Development Alternatives Summary32image only0
5-13Terminal Services Development Alternative 1: First Floor34image only0
5-14Terminal Services Development Alternative 1: Second Floor34image only0
5-15Terminal Services Development Alternative 2: First Floor35image only0
5-16Terminal Services Development Alternative 2: Second Floor35image only0
5-17Terminal Services Development Alternative 3: First Floor36image only0
5-18Terminal Services Development Alternative 3: Second Floor36image only0
5-19Landside Facility Walkability Measurement40image only0
5-20Landside Development Alternative 141image only0
5-21Landside Development Alternative 242image only0
5-22Landside Development Alternative 343image only0
5-23Alternatives Evaluation Summary53image only0
5-24Preferred Development Alternative55drawing labels0
5-25Preferred Landside Development Alternative56drawing labels0
5-26Preferred Terminal Services Modifications - First Floor58image only0
5-27Preferred Terminal Services Modifications - Second Floor59image only0

Source file

FileSizesha256
master-plan-database-2026-11-07.md51 KBdb48dd4452034d25d38b80403d21fccb41c551ebb662964bc4ce96cfae2b1daa