Section 6
Data and sources
Every source behind the twin with its link, how it was read and when it was last validated, and the research notes that describe the data.
18 pages in this section. Select a family for its sources. Each source opens to its link, method and validation date.
Level 1 of 3 This section, complete on its own. Each page below is a component with its own data and sources. Open the components
Source families 9
| No. | Page | What it holds |
|---|---|---|
| 6.1 | Public documents | 8 sources of the kind: public document. |
| 6.2 | Public datas | 8 sources of the kind: public data. |
| 6.3 | Secondarys | 2 sources of the kind: secondary. |
| 6.4 | Research notes | 6 sources of the kind: research note. |
| 6.5 | Standards | 2 sources of the kind: standard. |
| 6.6 | Sources | 3 sources of the kind: source. |
| 6.7 | Designs | 6 sources of the kind: design. |
| 6.8 | Maker documents | 1 sources of the kind: maker document. |
| 6.9 | Captures | 1 sources of the kind: capture. |
Register 1
| No. | Page | What it holds |
|---|---|---|
| 6.10 | The source register | All 37 sources behind the Exploder, each with its link, how it was read and when it was last validated. |
Data 2
| No. | Page | What it holds |
|---|---|---|
| 6.11 | USGS 3DEP lidar | Public lidar over the airfield. Every runway end agrees with the FAA published elevation to within 15 centimetres. |
| 6.12 | The Authority's public record | The strategic plan the Authority published, as a download, with the 2021 Airport Master Plan Update as a source. |
Research notes 6
| No. | Page | What it holds |
|---|---|---|
| 6.13 | Master plan database | passes traced the six terminal floor plans (Figures 2-16 to 2-21) and took the facts the Exploder needed. This pass |
| 6.14 | Airport facilities | Desk research, read 2026-10-29 and 2026-10-30. Nobody was contacted. Every row names its source and carries a |
| 6.15 | Terminal interior: where each part comes from | poc/build/interior.json is our drawing of the inside of the Orlando Sanford terminal. It is also the first load of |
| 6.16 | Accuracy gates: entrances and crosswalks | 2026-11-07. Stage 3, Validate. An automated cross-check against independent sources. Nobody visited the site. |
| 6.17 | Maytown Road | Research for R46 (Maytown Road, ripe for new connected communities), with R19, R22, R23, R25, R45 and R47 in |
| 6.18 | What to sense | Research for the Mission Studio plan (stellarview/docs/plans/mission-studio-interchange-collector.md, "Also now"). Public sources only. Nobody at the Authority, its board or any vendor... |