Research for R46 (Maytown Road, ripe for new connected communities), with R19, R22, R23, R25, R45 and R47 in mind. Public sources only. Every source was read on 2026-10-30. Each fact carries one tag:
- [verified] read in the primary source named (the rule maker, the owner of the record, or the official dataset)
- [secondary] from a news story, a company page, a guide, an encyclopedia, or a search summary not opened in full
- [inference] our reasoning from the facts, not stated by any source
- [not found] looked for and not found
Nothing here is legal or planning advice. Volusia County, the cities, the water district and the state have the last word on each line.
Summary
| Question | Short answer |
|---|
| What is Maytown Road | County Road 4164, a two-lane rural road maintained by Volusia County. It runs about 21.4 miles east from Osteen, near SR 415, under I-95, to Oak Hill. It follows the 1885 rail line from Enterprise to Titusville. |
| Who owns the land beside it | Mostly Miami Corporation (the Deering family), as the Farmton tract, owned since 1925. |
| What is planned | The Farmton Local Plan: about 47,000 acres in Volusia and 12,000 in Brevard. Two thirds or more kept as GreenKey conservation. About 15,081 acres of Sustainable Development Area in Volusia, up to 23,100 homes and 4.7 million sq ft after 2025. Maytown Road is the main east-west spine, to be widened, with a future I-95 interchange. |
| What is moving now | Deering Park in Edgewater, at the north end near SR 442: ground broken April 2025, over 1,700 homes in phase one, a K-8 charter school approved June 2026. Nothing found that starts building on Maytown Road itself. |
| The trail | The East Central Regional Rail Trail, about 51 miles, state owned, subleased to Volusia and Brevard for 50 years. It runs beside Maytown Road from Osteen to Maytown, then splits north to Edgewater and south to Titusville. Most of it is part of Florida's Coast-to-Coast Trail. |
| What must be kept | GreenKey lands, the Farmton Mitigation Bank (about 23,000 acres under easement to the water district), the Cow Creek and powerline wildlife corridors, wetlands with their buffers, a 100 ft buffer each side of the rail trail, and county preserves such as Deering Preserve at Deep Creek and River Bend Ranch. |
| Where communities could fit | Only inside the Farmton Sustainable Development Area districts (Villages, Town Center, Work Place, Gateway) and in land the cities have already zoned. The Farmton Villages policy already describes compact villages ringed by open space to keep a rural feel. |
1. Maytown Road itself
Route and termini
- The scenic highway plan names it "Maytown Road (County Road 4164)" and measures it at 21.4 miles from New Smyrna Avenue in Osteen to Beacon Light Road in Oak Hill. From there Halifax Avenue, River Road and Canal Avenue carry on to US 1 [verified, Corridor Management Plan, October 2010, Table 2.1].
- OpenStreetMap, read through the Overpass API on 2026-10-30, draws it in two named parts. "Osteen Maytown Road" runs 10.62 miles from Osteen (28.8464 N, 81.1609 W) to a name change at 28.8215 N, 80.9998 W. "Maytown Road" runs 10.87 miles from there to Oak Hill (28.8644 N, 80.8702 W). Total 21.49 miles. Both parts are tagged two lanes [verified as what OSM holds; OSM is crowd-sourced, so secondary as to the ground].
- It passes under I-95 at about 28.833 N, 80.912 W, with no interchange today [verified in OSM; the CPA-16-002 staff report calls it "the existing Maytown Road underpass" in the plan policy it quotes].
- At the west end it does not meet SR 415 directly. It is "accessed via New Smyrna Boulevard., which runs north/south and intersects with S.R. 415 at an angle" [verified, Volusia County staff report CPA-16-002, June 14, 2016].
- So the brief's description holds, with one correction. The east end is Oak Hill on US 1 and the lagoon, a little north of where I-95 crosses. The road does not reach I-95 at an exit [inference from the above].
Owner, maintainer, lanes and class
- "Volusia County maintains the other roadway segments", meaning everything except SR 415 and US 1, which FDOT maintains [verified, Corridor Management Plan 2010, section 2.2].
- FDOT classes it as a Rural Minor Collector. It has two lanes and a right of way of 50 to 100 ft, depending on the segment [verified, Corridor Management Plan 2010, Tables 2.2 and 2.3].
- In 2010 the corridor was put forward as the "Maytown Road Corridor Extension" of the River of Lakes Heritage Corridor Scenic Highway. The plan carries an FDOT Secretary approval page [verified that the plan and the signature page exist; whether the extension is designated today: not found].
- A 2017 County Council action approved recording a maintenance map that sets right of way limits for Osteen-Maytown Road [secondary, search summary of the Council action list of February 16, 2017].
- Most of the central part is "owned by the Miami Corporation and managed as the Farmton Tree Farm" [verified, Corridor Management Plan 2010, section 2.3].
Planned widening
The Farmton plan makes Maytown Road its main road and puts the cost on the developer.
a. Maytown Road. A 200 ft. multi-modal right-of-way shall be preserved through the Farmton Local Plan area. Direct access from Maytown Road to SR 415 shall be required within five-years of the commencement of any development within the Farmton Local Plan occurring on, or accessing, Maytown Road.
[verified, Farmton Local Plan, Policy FG 5.7(a), Volusia Comprehensive Plan Chapter 1]
Construction of the spine transportation network is the sole responsibility of the owner/developer.
[verified, FG 5.7]
- The 2016 amendment CPA-16-002 moved the planned SR 415 junction north to line up with Doyle Road. Staff found it consistent and recommended transmittal. The Farmton Master Development Order, Condition 68, adds that any rebuild "shall take into account the potential designation of this road as an emergency evacuation route for southeast Volusia County" [verified, CPA-16-002 staff report]. The amendment is Ordinance 2016-12 [verified, same file].
- The Farmton master application of May 2013 lists the road plan by horizon [verified, Farmton Application for Master Development Approval, road improvement table]:
- Maytown Road, SR 415 to Williamson Blvd: rebuild as 4 lanes, 2035.
- Maytown Road, Williamson Blvd to I-95: rebuild as 2 lanes, 2035.
- Maytown Road, SR 415 to I-95: 6 lanes, 2060.
- Maytown Road realignment, Naranja Road to SR 415, 2035 to 2060.
- New I-95 interchange at Maytown Road, 2060.
- The River to Sea TPO's Connect 2045 plan lists an "I-95 Interchange at Maytown Road" as the Farmton Interchange, with developer funding, and a 2020/21 project development entry of about $2.55 million in state SIS funds [secondary, search summary of TPO amendment files].
- A 2017 News-Journal story says the TPO had agreed to add the interchange and that permitting "could take up to 10 years" [secondary, reprinted on farmtontreefarm.com].
- Current status of the interchange or any widening: [not found]. No FDOT study page, 2050 plan entry or 2025-2026 decision on either was found.
Safety record
- The scenic plan's crash data (Volusia County Traffic Engineering, 2004 to 2009) puts the problems "in the main Maytown Road segment close to the community of Osteen". Most crashes were in daylight and clear weather, and many ended with "vehicles being overturned in the roadway or in the ditches along the roadway" [verified, Corridor Management Plan 2010, section on safety].
- FDOT project 441396-1 added paved shoulders at curves and audible pavement markings on CR 4164 from east of Gobblers Lodge Road to east of I-95, at about $1.1 million, finished about fall 2021 [secondary; the cflroads.com page returned 404 when opened, so this is from the search summary].
- On September 13, 2021, two teenagers died on Osteen Maytown Road west of Uranus Trail. The truck left the road into a water-filled ditch, hit two pines, and rolled [secondary, Fox 35, September 14, 2021].
- In October 2021 a woman died after leaving Maytown Road near Halifax Avenue and striking a tree [secondary, ClickOrlando, 2021].
- Recent official crash counts: [not found].
The Maytown settlement and the railway
- Maytown is an unincorporated place at about 28°48′26″N 80°57′36″W. It was "the site of the crossing of the Enterprise Branch and Kissimmee Valley Branch of the Florida East Coast Railway" [secondary, Wikipedia].
- The rail trail's management plan says the line was built in 1885 as the Indian River Railway to carry Indian River citrus to the steamboat dock at Enterprise on Lake Monroe. It later became part of the Florida East Coast Railway, with a spur from Maytown to Edgewater. Most rails, ties and depots in Volusia were removed in the 1960s [verified, ECRRT Management Plan, August 20, 2009]. A travel guide credits the 1885 line to the Jacksonville, Tampa and Key West company [secondary, Florida Backroads Travel]. The two sources differ on the builder's name.
- The Farmton master application lists "the small towns of Maytown, Farmton, Pennichaw and Kalamazoo" along the lines, and says the area was opened by "the first railroad line in East Central Florida in 1885" [verified, Farmton AMDA 2013, Question 10.C].
- Maytown Road "follows the route of an old railroad that connected Enterprise to Titusville". The author first drove it as dirt in the 1960s [secondary, Florida Backroads Travel].
- The 2010 scenic plan cites a 1957 article, "Volusia County Ghost Towns" [verified that the citation exists].
2. Planned development along it
Farmton: owner, size and status
- Owner: Miami Corporation, owned by descendants of the William Deering family, holding the land since 1925 [verified for Miami Corporation, Farmton Local Plan background; secondary for the family, farmtontreefarm.com FAQ].
- Size: "approximately 47,000 acres in southeast Volusia and 12,000 acres in northern Brevard Counties" [verified, Farmton Local Plan background]. Later company pages say 70,000 acres, and a 2020 News-Journal story says 66,000 [secondary]. The larger totals likely include land bought later, such as the 6,281-acre Restoration tract in 2018 [inference].
- Adoption: adopted by Ordinance 2009-34 on February 18, 2010. Revised by Ordinance 2011-10 on April 7, 2011 after a settlement. Challenged. An administrative law judge found it in compliance on January 24, 2012, and the state's final order made it effective on March 29, 2012 [verified, Farmton AMDA 2013, Question 10.A.1].
- A Master Development Order for the Farmton DRI exists. Its Condition 68 is quoted in the 2016 staff report [verified]. Its date: [not found].
Development and conservation areas (Volusia)
From the Farmton Local Plan [verified, Volusia Comprehensive Plan Chapter 1, section 14]:
| Designation | Acres |
|---|
| Whole plan in Volusia | 46,957 |
| GreenKey (conservation) | 31,876 |
| Sustainable Development Area (SDA) | 15,081 |
| SDA: Gateway district, near SR 442 and I-95 | 821 |
| SDA: Work Place district | 1,351 |
| SDA: Town Center district | 1,909 |
| SDA: Villages district | 11,000 |
| Minimum resource based open space inside the SDA | 3,100 |
- GreenKey covers "at least two-thirds" of the plan, and with the open space rules "at least 75% of the entire 47,000 acres" will be protected. GreenKey's underlying density is zero [verified].
- Caps after 2025: "23,100 residential units and 4.7 million square feet on non-residential" [verified, FG 3.9].
- Phasing: phase one ran to 2025 with no added density. The second horizon is 2026 to 2060. Phase one density was 2,287 units, rising toward 4,692 only on a finding of school adequacy [verified, FG 1.1].
- A 1:1 jobs to homes balance is required at buildout [verified, FG 3.10].
- Where the districts sit: the Gateway is at the north end near SR 442. The planned Williamson Boulevard extension runs from the Brevard line north across Maytown Road, past the north edge of the Town Center, past Arterial A and the Gateway, to SR 442, then through Restoration to SR 44 [verified, Farmton AMDA 2013, roadway segment table]. So the Town Center lies north of Maytown Road along that extension, west of I-95 [inference from the segment order]. Exact village locations need the plan's map, which is an image in the PDF [not found as text].
The Brevard part
- About 12,000 acres in northern Brevard [verified, Farmton Local Plan]. Swallowtail LLC, a Miami Corp. affiliate, controls about 11,500 acres there [secondary, Florida Today, August 17, 2015].
- About 9,000 acres in Brevard were deeded to conservation [secondary, News-Journal, February 18, 2017].
- In 2015 Brevard rezoned two parcels of about 8 and 8.8 acres west of the I-95 Scottsmoor exit for a hotel and commerce, and approved a Scottsmoor-area community development district [secondary, Florida Today 2015 and a December 2015 item, both reprinted on farmtontreefarm.com].
Restoration, Deering Park and the north end
- Restoration: 6,281 acres at the north-west corner of I-95 and SR 442, in Edgewater and New Smyrna Beach, bought by Farmton North LLC (Miami Corp.) for $16 million in 2018. It was an approved DRI for up to 8,500 homes [secondary, Hometown News, September 13, 2018]. Edgewater now calls it Deering Park North, 5,187 acres, with 3,732 acres for perpetual conservation [secondary, search summary of Edgewater's planned developments page, which returned 404 when opened].
- Deering Park Center: 850 to 900 acres in Edgewater, west of I-95, annexed and zoned [secondary, News-Journal 2017]. The 2018 story says it is permitted for up to 4,692 homes, with about 600 in the first stage [secondary, Hometown News, February 8, 2018]. 4,692 is also the Gateway district's cap, so the two may be the same land under two names. The 2017 story says the Gateway is "directly south" of Deering Park. This needs a parcel check [inference].
- Ground broken: "Initial construction has begun on Deering Park". Phase one has "over 1,700 homes". Partners are the Deering family and Brookfield Kolter Land Partners [secondary, Hometown News, April 17, 2025].
- Volusia School Board approved a Deering Park K-8 charter school 4-0, about $80 million, opening 2029 [secondary, News-Journal, June 9, 2026].
- New Smyrna Beach changed the land use on about 1,618 acres to Industrial Mixed-Use, for a business park, homes and a sports complex, with business to come before more housing [secondary, News-Journal, September 11, 2024].
- February 2025: another 4,000 acres went into conservation easements, for more than 46,000 acres protected in all [secondary, farmtontreefarm.com, February 18, 2025].
- Edgewater Wetland Park, about 50 acres donated by Farmton North LLC, broke ground in April 2026 to cut wastewater flows to the Indian River Lagoon [secondary, farmtontreefarm.com].
County land use and rules near the road
- The Environmental Core Overlay (ECO) and the Natural Resource Management Area (NRMA) apply county-wide. Where both apply, "the most restrictive environmental protection standards shall apply". The NRMA requires a 50 ft wetland buffer where other land needs 25 ft [secondary, search summary of Volusia's Future Land Use Element and an NRMA pamphlet].
- Farmton's GreenKey lands are added to the ECO map on adoption [verified, Farmton Local Plan background].
- Parcel-level land use along Maytown Road outside Farmton (Osteen and Oak Hill ends): [not found]. Volusia's GIS layers hold it and were not queried.
- Oak Hill's own comprehensive plan or recent growth decisions: [not found].
- A formal rural boundary or urban service boundary line along Maytown Road: [not found]. The Farmton plan instead limits growth to its SDA districts and requires fiscal neutrality, so new growth pays for its own roads and services [verified, FG 7.1 and FG 5.8].
- Economic development: the Farmton Work Place district (office, warehousing, light manufacturing, research) and the NSB 1,618-acre industrial mixed-use land are the two job areas found [verified for Work Place; secondary for NSB].
The most recent public decisions found
| Date | Body | Decision | Tag |
|---|
| 2025-11-18 | Volusia County Council | Tabled 6-0 a proposal to sign Maytown Road, New Smyrna Boulevard to I-95, as a memorial highway, and asked staff for a road naming policy | secondary, West Volusia Beacon |
| 2026-05-05 | Volusia County Council | Approved unanimously a $20.1 million Volusia Forever purchase of 1,299-acre River Bend Ranch, 1411 Osteen Maytown Road | secondary, Observer |
| 2026-06-09 | Volusia School Board | Approved the Deering Park charter school 4-0 | secondary, News-Journal |
| 2026-06-16 | Volusia County Council | Put five charter amendments on the November ballot, one creating a conservation land registry with a 5 of 7 vote to sell or transfer | secondary, Spectrum News 13 |
3. The trail: East Central Regional Rail Trail
- Route: "50.8 miles from the community of Enterprise in southwestern Volusia County to the City of Titusville in northern Brevard County with an additional spur from the former community of Maytown to the City of Edgewater" [verified, ECRRT Management Plan, 2009].
- Beside Maytown Road: it "parallels Maytown Road to the Maytown Spur and then continues southeast into Brevard County" [verified, Farmton AMDA 2013]. Parking at the Maytown junction is near Osteen Maytown Road and Maytown Spur Drive [secondary, TrailLink]. In Osteen it connects to the SR 415 trail toward Sanford [secondary, TrailLink].
- Owners: the state Board of Trustees bought the corridor from the FEC for $16 million in Florida Forever money, closing December 31, 2007. It is 35 to 200 ft wide, 668.35 acres. It was leased to the Office of Greenways and Trails for 50 years on April 25, 2008. In September 2008 OGT gave Volusia and Brevard 50-year subleases to build and run it [verified, ECRRT Management Plan].
- Uses allowed: the corridor was bought for conservation and recreation. Other uses are "limited to non-motorized modes of transportation only with the exception of authorized perpendicular crossings" [verified, ECRRT Management Plan].
- Status: Volusia says it "has completed construction" of the trail, "52 miles from Deltona to Edgewater, including a 10-mile leg to Titusville". It is 12 ft wide and paved [verified, Volusia County trail page]. A search summary of the same page reported a notice that some sections are closed until further notice. That notice was not seen when the page was read [secondary].
- Brevard maintains its 11 miles, from La Grange Road in Titusville to the Volusia line [secondary, Brevard County page via search summary].
- Coast-to-Coast: the state trail "will span approximately 250 miles", "is currently 88 percent complete", and its corridor includes "most of the 51-mile East Central Regional Rail Trail" [verified, FDEP Office of Greenways and Trails, page last modified October 8, 2026]. The Maytown to Titusville branch is the Coast-to-Coast route. The Maytown to Edgewater spur is part of the St. Johns River-to-Sea Loop [secondary, 100 Florida Trails, 2023].
- The Farmton plan requires "A 100 foot vegetative buffer shall be maintained on each side of the trail" through its land [verified, Farmton Local Plan, FG 2.19(e)].
- It also requires rest areas "for trail users with access from public roads" and links from its own paths to the rail trail [verified, Farmton Local Plan, FG 5.3(d) and (f)].
4. Water and land: what must be kept
Conservation lands along or near the road
- GreenKey lands in the Farmton plan: 31,876 acres in Volusia, zero density, to be held in perpetual easements [verified]. Easements are "held jointly by Florida Audubon, Volusia County or Brevard County, and St. Johns River Water Management District" [secondary, farmtontreefarm.com Local Plan page].
- Farmton Mitigation Bank: about 23,000 acres under perpetual easement, held by the St. Johns River Water Management District [secondary, farmtontreefarm.com and a federal court opinion summary]. The plan says "Transportation corridors shall be designed to avoid the areas permitted for mitigation banking" [verified, FG 2.18(a)].
- Wildlife corridors: the Cow Creek and powerline corridors were drawn with FWC and the peer review panel for black bear. Maytown Road must get wildlife underpasses or overpasses across them [verified, FG 2.18(c)(2) and AMDA 2013].
- Mandatory Resource Based Open Space inside the SDA is already mapped, closed to public access, and under the black bear management plan [verified, AMDA 2013].
- Wetland buffers: inside SDA districts, average 75 ft and no less than 50 ft. Inside GreenKey, average 100 ft and no less than 75 ft [verified, FG 2.19(d)].
- Deering Preserve at Deep Creek: 1,385 acres, county [secondary, Volusia page via search summary]. SJRWMD bought the 3,200-acre Kemcho tract of Deep Creek Preserve in 2011, with the county managing it [secondary, same].
- River Bend Ranch: 1,299 acres at 1411 Osteen Maytown Road, bought May 2026. About 2 miles of St. Johns River frontage, 1.3 miles on Deep Creek, about 561 acres of wetlands. With the Deering Preserve it makes 2,684 contiguous acres [secondary, Observer, May 5, 2026].
- Buck Lake Conservation Area (SJRWMD, about 9,625 acres, Brevard and Volusia, near Mims) and the Maytown Flatwoods Florida Forever project (over 7,283 acres, 5,021 still to buy in 2021) [secondary, SJRWMD page and FDEP item 13 of November 2021 via search summary].
- Other public lands named near the trail: Lake Monroe Conservation Area, Salt Lake Wildlife Management Area, Wiregrass Prairie Preserve, Hickory Bluff and Turnbull Bay Conservation Area [verified, ECRRT Management Plan].
- Atlantic Ridge: Atlantic Ridge Preserve State Park is in Martin County near Stuart, about 150 miles south. It is not near Maytown Road [verified, Florida State Parks page via search; distance is an inference]. No preserve of that name was found near the road [not found].
Flood zones
FEMA's National Flood Hazard Layer was queried at points about 1.5 km apart along the road on 2026-10-30 [verified, FEMA NFHL MapServer layer 28, DFIRM 12127C]:
- Most points are Zone X, "area of minimal flood hazard".
- Zone A (1 percent annual chance, no base flood elevation) at about 81.146 W near Osteen, at 81.080 W to 81.061 W around Farmton, and at about 80.944 W east of Maytown.
- Terrapin Station's approximate point (29.001 N, 81.000 W) also falls in Zone A.
- Three points timed out and are not counted. A point sample shows where the road crosses wet ground. A site plan needs the full polygons [inference].
Airspace along the road
- At six points along the road the FAA UAS Facility Map has no grid cell, and no Class B, C, D or surface Class E starts at the ground. The lowest controlled floor overhead is 700 ft at the Osteen end (Sanford Class E5) and 1,200 ft elsewhere. Sanford's Class C shelf starts at 1,300 ft over the Osteen end [verified, FAA Class Airspace and UAS Facility Map layers, queried 2026-10-30].
- So a drone below 400 ft along Maytown Road flies in Class G and needs no airspace authorization. Beyond line of sight still needs a waiver or Part 108 [inference, using 14 CFR 107.41 as cited in open-checks-2026-10-30.md].
5. Distances, as the crow flies
Method: the haversine great-circle formula on a sphere of radius 6,371.0088 km.
d = 2R asin( sqrt( sin²(Δφ/2) + cos φ1 cos φ2 sin²(Δλ/2) ) )
1 statute mile = 1.609344 km. 1 nautical mile = 1.852 km. Bearings are initial true bearings.
Points used:
- SFB reference point 28-46-37.841 N, 81-14-05.689 W = 28.777178 N, 81.234914 W. (37.841 / 3600 + 46 / 60 + 28; 5.689 / 3600 + 14 / 60 + 81.)
- Terrapin Station 29.001 N, 81.000 W (approximate, Municipath
poc/build/nsb-geo.json, "site shown approximately: south-west of the I-95 and SR 44 interchange, west of I-95"). - A, Osteen west end of Osteen Maytown Road, 28.8464 N, 81.1609 W (OSM).
- B, on the road at Farmton, 28.8465 N, 81.0606 W (OSM point nearest Wikipedia's Farmton coordinates).
- C, where Osteen Maytown Road becomes Maytown Road, 28.8215 N, 80.9998 W (OSM).
- D, Maytown, at Maytown Spur Road, 28.8122 N, 80.9632 W (OSM).
- E, the I-95 underpass, 28.8333 N, 80.9117 W (OSM, nearest I-95 node 25 m away).
- F, Oak Hill east end, 28.8644 N, 80.8702 W (OSM).
- NSB, New Smyrna Beach, 29.0244 N, 80.9269 W (Wikipedia infobox, 29°01′28″N 80°55′37″W).
Worked example, SFB to D (Maytown): Δφ = 28.8122 − 28.777178 = 0.0350°. Δλ = −80.9632 − (−81.234914) = 0.2717°. In radians these are 0.000611 and 0.004742. The term under the root is sin²(0.000306) + cos(28.777°) × cos(28.812°) × sin²(0.002371) = 9.4e-8 + 0.8765 × 0.8762 × 5.62e-6 = 4.41e-6. Its root is 0.002100. asin of that times 2 is 0.004200 rad. Times 6,371.0088 km is 26.76 km, which is 16.63 mi or 14.45 NM.
From SFB
| To | Δlat ° | Δlon ° | km | mi | NM | Bearing |
|---|
| A, Osteen end | 0.0692 | 0.0740 | 10.55 | 6.55 | 5.70 | 43 |
| B, Farmton | 0.0693 | 0.1743 | 18.65 | 11.59 | 10.07 | 66 |
| C, name change | 0.0443 | 0.2351 | 23.43 | 14.56 | 12.65 | 78 |
| D, Maytown | 0.0350 | 0.2717 | 26.76 | 16.63 | 14.45 | 82 |
| E, I-95 underpass | 0.0561 | 0.3232 | 32.11 | 19.95 | 17.34 | 79 |
| F, Oak Hill end | 0.0872 | 0.3647 | 36.83 | 22.89 | 19.89 | 75 |
| NSB | 0.2472 | 0.3080 | 40.68 | 25.28 | 21.96 | 47 |
| Terrapin Station | 0.2238 | 0.2349 | 33.80 | 21.00 | 18.25 | 43 |
The SFB to Terrapin figure matches R19's 18.3 NM.
From Terrapin Station
| To | Δlat ° | Δlon ° | km | mi | NM | Bearing |
|---|
| A, Osteen end | −0.1546 | −0.1609 | 23.25 | 14.45 | 12.56 | 222 |
| B, Farmton | −0.1545 | −0.0606 | 18.16 | 11.29 | 9.81 | 199 |
| C, name change | −0.1795 | 0.0002 | 19.96 | 12.40 | 10.78 | 180 |
| D, Maytown | −0.1888 | 0.0368 | 21.30 | 13.23 | 11.50 | 170 |
| E, I-95 underpass | −0.1677 | 0.0883 | 20.53 | 12.76 | 11.09 | 155 |
| F, Oak Hill end | −0.1366 | 0.1298 | 19.76 | 12.28 | 10.67 | 140 |
| NSB | 0.0234 | 0.0731 | 7.57 | 4.70 | 4.09 | 70 |
What the numbers say [inference from the computation]
- The SFB to Terrapin crow line passes within 0.11 km of the Osteen end of the road (A), 10.55 km out from SFB.
- East of Osteen the road bends south of that line. Farmton (B) is 7.3 km south-east of it, the name change (C) 13.5 km, and Maytown (D) 16.9 km. So R47's crow-fly film and a Maytown Road film are two different paths. They share only the first 10 km.
- A relay path SFB to A to B to Terrapin is 10.55 + 9.77 + 18.16 = 38.48 km. That is 4.7 km longer than the straight 33.80 km. At 15 m/s in still air it takes 42.8 minutes, against 37.6 for the straight line. At 20 m/s it takes 32.1 against 28.2.
- Every point on the road is within 37 km of SFB and within 24 km of Terrapin Station.
6. For our work
Where connected communities could fit [inference unless tagged]
- Only inside the Farmton SDA districts or on land a city has already zoned. That means the Villages (11,000 acres), the Town Center (1,909), the Work Place (1,351) and the Gateway (821) in Volusia, Deering Park and Deering Park North in Edgewater, and NSB's 1,618 acres. GreenKey, the mitigation bank, Mandatory Resource Based Open Space, the county preserves and the trail with its buffers are all off the table.
- The plan's own Villages policy already reads like R45. Each village is compact, with most homes "within one half mile of the village center", each centre has a transit stop, and the villages are ringed by open space:
Villages shall be surrounded by large expanses of Resource Based Open Space that are designed to protect the character of the rural landscape.
[verified, FG 3.7 and FG 3.7(d), (i)]
- The plan asks for new travel modes too:
Given the potential for innovation in transportation, provision should be made for accommodating state-of-the-art travel modes (both for on-site facilities and access to off-site facilities) as they evolve throughout the development of the Farmton Local Plan.
[verified, FG 5.9]
- The Williamson Boulevard extension is planned from Maytown Road north through the Town Center, the Gateway and Restoration to SR 44 [verified, AMDA 2013]. Terrapin Station's approximate point sits south-west of I-95 and SR 44. So the planned extension would join Maytown Road's communities to the Terrapin Station area by road. Whether Terrapin's drawn site overlaps the Restoration or NSB 1,618-acre land needs a parcel check.
- The Osteen end is the closest part of the road to SFB, 10.55 km, and it sits on the crow line. Its existing rural homes and the River Bend and Deep Creek preserves next to it mean any community there is small and fits around kept land. The Osteen Local Plan governs it and was not read [not found].
Trail outposts (R22)
- The corridor itself is state land bought for conservation and recreation, with uses limited to non-motorized travel [verified]. An outpost on the corridor would need the Trustees' or OGT's approval under the sublease.
- Better sites: the trailheads and rest areas the Farmton plan requires "with access from public roads", the Maytown junction parking, and SDA land next to the trail outside its 100 ft buffer.
- Police, fire and EMS are allowed "in all SDA districts, but shall not be allowed in GreenKey designation" [verified, FG 3.12]. Resource Based Open Space allows trail rest areas, shelters and utility lines [verified, FG 2.12]. Whether a drone dock counts as either needs a county reading.
- Spacing example from section 5: SFB to Osteen 10.55 km, Osteen to Farmton 9.77 km, Farmton to Terrapin 18.16 km. The last hop is the longest and crosses GreenKey and mitigation bank land, so a dock in the Town Center or Gateway area would split it.
Drone links (R19, R23)
- The low airspace over the whole road is Class G [verified]. That is the easy part. The SFB end is Class C, as open-checks found.
- Bear crossings, prescribed burns and wildlife corridors are in the plan [verified, FG 2.18]. Drone routes and dock lights over GreenKey would draw the same questions. Low-noise, high-altitude transits over conservation land and docks only in SDA land are the safer picture.
- Maytown Road is to be designed as a possible evacuation route [verified, MDO Condition 68]. A drone corridor along it for storm response fits that purpose.
Risks and sensitivities
| Risk | What the record shows | Source and tag |
|---|
| Environmental opposition | Sierra Club Florida and a New Smyrna Beach resident petitioned in May 2011 against what they called a new city of about 50,000 on remote, sensitive land | Sierra Club press release, May 2011 [secondary; page empty when opened, from search summary] |
| Mitigation bank litigation | Sierra Club sued SJRWMD and the Army Corps over the Farmton Mitigation Bank in 2014. In November 2015 the court denied motions to dismiss. A 2018 opinion followed, 320 F. Supp. 3d 1298 | ELR summary [secondary]; 2018 outcome [not found] |
| Farmton history | Prior county leadership rejected the plan and went to DOAH in 2010. A court challenge by critics who wanted about 3,700 ranchettes failed. The plan took more than seven years to approve | Sierra Club 2011 summary and Hometown News 2018 [secondary] |
| Interchange permits | A judge recommended denying the water permit for FDOT's Pioneer Trail interchange in January 2024, on environmental public-interest grounds | ClickOrlando, January 30, 2024 [secondary] |
| County politics | The Council chair and members split on how hard to protect conservation land. The chair's unanimous-vote version was tabled. The registry amendment goes to voters in November 2026, with critics citing a public-purpose loophole | Spectrum News 13, June 17, 2026 [secondary] |
| Road naming politics | A memorial highway proposal for Maytown Road turned a Council meeting "raucous" and was tabled 6-0 | West Volusia Beacon, November 19, 2025 [secondary] |
| Public sentiment for keeping land | Voters fund Volusia Forever, and the River Bend purchase passed unanimously. A candidate said it gives Osteen "breathing room" | Observer, May 5, 2026 [secondary] |
| Road safety | Run-off-road crashes into ditches and trees near Osteen and at curves | Scenic plan 2010 [verified]; 2021 crash reports [secondary] |
| Flood | Zone A at Farmton, near Osteen and at Terrapin's approximate point | FEMA NFHL [verified] |
How to say it in the film [inference]
- Show Maytown Road as a real road and the Farmton plan as Volusia's adopted plan, with its kept land in green first.
- Draw any community only inside an SDA district, labelled as a proposal and as Municipath's design.
- Never draw a dock, a home or a road on GreenKey, the mitigation bank, a preserve or the trail corridor.
- Name no politician and no party to a dispute.
Open items
- Parcel check: Terrapin Station's drawn site against Restoration, Deering Park and the NSB 1,618 acres.
- The Farmton Local Plan map, to place the Villages, Town Center and Work Place on the ground.
- Current status of the Maytown interchange and any widening (FDOT work program, TPO 2050 plan).
- Volusia GIS: future land use, ECO and NRMA along the road, and the Osteen Local Plan.
- Whether the scenic highway extension was designated.
- The 2018 outcome of the mitigation bank case and the date of the Master Development Order.
Sources (all read 2026-10-30)
- Farmton Local Plan, Volusia Comprehensive Plan Chapter 1 section 14: https://www.volusia.org/core/fileparse.php/5525/urlt/Farmton-Local-Plan.pdf
- Farmton Application for Master Development Approval, May 2013: https://www.volusia.org/core/fileparse.php/5525/urlt/051613-Application-Submittal.pdf
- CPA-16-002 staff report and Ordinance 2016-12, June 14, 2016: https://www.volusia.org/core/fileparse.php/5906/urlt/CPA-16-002-Farmton-Maytown.pdf
- River of Lakes Heritage Corridor Scenic Highway, Maytown Road Corridor Extension CMP, October 2010: https://floridascenichighways.com/wp-content/uploads/2017/02/Maytown_MASTER_CMP_FINAL_Opt_Small.pdf
- ECRRT Management Plan, August 20, 2009: https://www.volusia.org/core/fileparse.php/4763/urlt/ECRRT_MngPln_Text_Final_090821.pdf
- Volusia County ECRRT page: https://www.volusia.org/services/community-services/parks-recreation-and-culture/parks-and-trails/trails/east-central-regional-rail-trail.stml
- FDEP Florida Coast-to-Coast Trail: https://floridadep.gov/parks/ogt/content/florida-coast-coast-trail
- Wikipedia, East Central Regional Rail Trail: https://en.wikipedia.org/wiki/East_Central_Regional_Rail_Trail
- Wikipedia, Maytown, Florida: https://en.wikipedia.org/wiki/Maytown,_Florida
- Wikipedia, Farmton, Florida: https://en.wikipedia.org/wiki/Farmton,_Florida
- Wikipedia, New Smyrna Beach, Florida (coordinates): https://en.wikipedia.org/wiki/New_Smyrna_Beach,_Florida
- TrailLink, ECRRT: https://www.traillink.com/trail/east-central-regional-rail-trail/
- 100 Florida Trails, ECRRT: https://100floridatrails.com/east-central-rail-trail.htm
- Florida Backroads Travel, Maytown Road: https://www.florida-backroads-travel.com/maytown-road.html
- Farmton Local Plan page: https://www.farmtontreefarm.com/local-plan.html
- Farmton FAQ: https://www.farmtontreefarm.com/faq.html
- Farmton news index: https://www.farmtontreefarm.com/news.html
- News-Journal via Farmton, February 18, 2017: https://www.farmtontreefarm.com/view-news.html?id=25
- Hometown News via Farmton, February 8, 2018: https://www.farmtontreefarm.com/view-news.html?id=24
- Hometown News via Farmton, September 13, 2018: https://www.farmtontreefarm.com/view-news.html?id=17
- News-Journal via Farmton, October 22, 2020: https://www.farmtontreefarm.com/view-news.html?id=14
- News-Journal via Farmton, September 11, 2024: https://www.farmtontreefarm.com/view-news.html?id=30
- Farmton, February 18, 2025: https://www.farmtontreefarm.com/view-news.html?id=31
- Hometown News via Farmton, April 17, 2025: https://www.farmtontreefarm.com/view-news.html?id=32
- News-Journal via Farmton, June 10, 2026: https://www.farmtontreefarm.com/view-news.html?id=33
- Florida Today via Farmton, August 17, 2015: https://www.farmtontreefarm.com/view-news.html?id=27
- Observer, River Bend Ranch, May 5, 2026: https://www.observerlocalnews.com/news/2026/may/05/volusia-county-council-oks-201-million-volusia-forever-purchase-in-osteen/
- Spectrum News 13, charter amendment, June 17, 2026: https://mynews13.com/fl/orlando/news/2026/06/17/conservation-land-sale-rules-head-to-volusia-county-voters
- West Volusia Beacon, November 2025: https://www.beacononlinenews.com/articles/news/words-matter-council-meeting-turns-raucous-over-road-idea/
- ClickOrlando, Pioneer Trail ruling, January 30, 2024: https://www.clickorlando.com/news/2024/01/30/judge-rules-against-i-95-interchange-in-volusia-county/
- Fox 35, September 14, 2021: https://www.fox35orlando.com/news/fhp-2-teens-killed-2-injured-in-volusia-county-crash
- ELR, Sierra Club v. SJRWMD, November 6, 2015: https://www.elr.info/litigation/45/32/sierra-club-inc-v-st-johns-river-water-management-district
- Sierra Club Florida, May 2011 (empty when opened): https://sierraclub.org/florida/blog/2011/05/sierra-club-florida-resident-file-legal-petition-opposing-proposed-new-city
- FDOT project 441396-1 (404 when opened): https://www.cflroads.com/project/441396-1/CR_4164_Osteen-Maytown_Rd_from_east_of_Gobblers_Lodge_Rd_to_east_of_I-95
- Edgewater planned developments (404 when opened): https://cityofedgewater.org/ed/page/planned-developments
- River to Sea TPO Connect 2045 amendment files: https://www.r2ctpo.org/wp-content/uploads/Connect-2045-Amendment-6-Support-Documentation.pdf
- FDEP item 13, Maytown Flatwoods, November 2021: https://floridadep.gov/sites/default/files/Item%2013%20Maytown%20Flatwoods%20BA%20-%20Buck%20Lake_1.pdf
- Florida State Parks, Atlantic Ridge Preserve: https://www.floridastateparks.org/parks-and-trails/atlantic-ridge-preserve-state-park
- FEMA NFHL, layer 28: https://hazards.fema.gov/arcgis/rest/services/public/NFHL/MapServer/28
- FAA Class Airspace: https://services6.arcgis.com/ssFJjBXIUyZDrSYZ/arcgis/rest/services/Class_Airspace/FeatureServer/0
- FAA UAS Facility Map: https://services6.arcgis.com/ssFJjBXIUyZDrSYZ/arcgis/rest/services/FAA_UAS_FacilityMap_Data/FeatureServer/0
- OpenStreetMap via Overpass API (data timestamp 2026-10-30T11:22:35Z): https://overpass-api.de/api/interpreter