AirfieldpathOrlando Sanford International

2.43 · Proof of concept · Assets

The Airfield in 3D, from Lidar Real

The airport as the lidar measured it: ground, buildings and where water would gather, flown in close.

Picture: Headless capture of poc/index.html?v=airfield3d&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.
Clip: Excerpt of the film "The opener", 8 to 12 seconds (the airport from public lidar). No sound.

Screen · Proof of concept · Assets

The Airfield in 3D, from Lidar

The airport as the lidar measured it: ground, buildings and where water would gather, flown in close.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Screen
Status
not linked
Airport layer
Screens: the POC story and the spines
Airport area
not linked
System
not linked
Sensor type
not linked
How it worksHow it works: Data

Open the screen · Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Open this screen in the proof of concept

The opener. Whole film, 50 seconds: the airport from public lidar, down to the Terminal. Its first seconds were not timed against the screen, so no segment is claimed.
Group
Assets
Status as the app labels it
Real
Basis
Public USGS 3DEP lidar, FL_Peninsular_Seminole_2018, public domain, read 2026-10-30 (poc/lidar/README.md).
What the screen must do (6)
  • Show the airfield in three dimensions from real public lidar, labelled with its project and year (REQ-SFB-012, REQ-FUNC-066)
  • Measure building heights from the lidar on the real footprints, and say how each was measured (REQ-FUNC-069)
  • Check the measured ground against the FAA's published runway end elevations, and carry the survey's source, date and accuracy class (REQ-DATA-003)
  • Mark where water would pond on pavement as analysis of the surface, never as observed water (REQ-FUNC-066, REQ-SFB-012)
  • Fly in slowly from the airfield to the terminal on a path a film can step frame by frame (REQ-FUNC-070)
  • Keep positions inside the terminal illustrative until floor plans or an interior scan arrive (REQ-SFB-016)
Requirement identifiers (2)

REQ-SFB-012, REQ-SFB-016