Work zones on the airfield and the safety plan for each.

Picture: Headless capture of poc/index.html?v=construction&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.

Screen · Proof of concept · Operate

Construction Safety

Work zones on the airfield and the safety plan for each.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Screen
Status
not linked
Airport layer
Screens: the POC story and the spines
Airport area
not linked
System
not linked
Sensor type
not linked

Open the screen · Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Open this screen in the proof of concept

Construction Safety, a capture of the screen
Capture of the screen: Construction Safety. Dark and light modes.

Narration line

It shows every construction area on the map with its phase, its closures and its safety plan.

Source: poc/bearings/construction.json, beat "What it shows"

Group
Operate
Status as the app labels it
Real
Basis
The screen runs. Data: carefully crafted and curated test data for common use cases.
What the screen must do (4)
  • Show every construction area on the map with its phase, its closures and its safety plan (REQ-FUNC-043)
  • Show the marking, lighting and barricades each area needs and whether the inspection found them in place (REQ-FUNC-043)
  • Show the NOTAMs each phase needs and their state (REQ-FUNC-044)
  • Show the haul routes and staging areas, and the escorts they need (REQ-FUNC-044)