  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Plan
Status
not linked
Airport layer
not linked
Airport area
not linked
System
not linked
Sensor type
not linked

Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

IdWhat the plan needsNeeded byRFP
DEP-01The contract executed and the written authorization to proceed2027-02-09RFP 6.15
DEP-02A named Authority project manager, an executive sponsor and the stakeholder list2027-02-09C 4.1
DEP-03The documentation that exists: system list, O&M manuals, drawings, GIS, CAD, BIM and floor plans as available2027-02-10C 4.1; C 4.4; C 5.2
DEP-04Simplify i3: the interface and an account to read assets, work orders and inspections, and to write work requests2027-03-01C 6.2; C 6.9
DEP-05The Authority's identity provider: an application registration for sign-in2027-03-01C 5.9
DEP-06The hosting model accepted, with data ownership and residency decided2027-02-12B ii
DEP-07Network: a DMZ segment for the gateways, outbound rules, and the security team's review2027-03-12C 5.9; C 4.6
DEP-08Schneider EcoStruxure: the version and licence confirmed, and the integrator's time to bind the sample points2027-03-12C 6.3; C 6.9
DEP-09The Allen-Bradley programs and tag lists for the sample bridge and conveyor, and who maintains them2027-03-19C 6.4; C 6.5; C 6.9
DEP-10The elevator and escalator maintenance contract: the maker's monitoring or interface option for one elevator and one escalator2027-03-19C 6.6
DEP-11Badges and escorts for our field staff in secured and airside areas2027-02-15C 4.6
DEP-12An asset ID in Simplify i3 for each new sensor before it is fitted2027-04-02C 5.4; C 6.2
DEP-13Business Central: read access to the fixed asset records2027-03-19C 6.9
DEP-14Genetec: evaluation access and the security team's rules for clips and events2027-03-19C 6.7; C 6.9
DEP-15The model way chosen (a model in the hosting account, a direct service behind obfuscation, a local model, or none) and the data classes each may see2027-04-30C 3.7; C 5.7
DEP-16Airfield: which airfield sources are shared, and whether the lighting system's maker agrees to a read-only report2027-04-02C 1.3; C 6.9
DEP-17Training attendees named per group, with their dates2027-05-14C 4.11; C 7.3
DEP-18Acceptance criteria agreed and the acceptance testers named for 2027-06-01 to 2027-06-112027-05-28C 7.1; B iii
DEP-19The go-live decision2027-06-18C 7.1; B iii
DEP-20Approval of the Project Implementation Plan2027-03-05RFP 2.9; C 7.1
DEP-21The grant agreement for the $1.2 million, with its reporting, records and acceptance terms2027-02-19RFP 3; B vi
DEP-22The order of later work, set by the Authority each year2027-07-01C 1.3; RFP 6.16
DEP-23The acceptance signature, given in writing2027-06-30C 7.1