3.12 · The RFP and the plan · The plan
Authority dependencies
23 things the plan needs from the Authority, each with the date it is needed by and the RFP section it comes from.
No picture for this component.
Plan · The RFP and the plan · The plan
23 things the plan needs from the Authority, each with the date it is needed by and the RFP section it comes from.
- Sources
- Interchange
- Twin
- Screens
- Plan
- Kind
- Plan
- Status
- not linked
- Airport layer
- not linked
- Airport area
- not linked
- System
- not linked
- Sensor type
- not linked
Open the detail
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
| Id | What the plan needs | Needed by | RFP |
|---|
| DEP-01 | The contract executed and the written authorization to proceed | 2027-02-09 | RFP 6.15 |
| DEP-02 | A named Authority project manager, an executive sponsor and the stakeholder list | 2027-02-09 | C 4.1 |
| DEP-03 | The documentation that exists: system list, O&M manuals, drawings, GIS, CAD, BIM and floor plans as available | 2027-02-10 | C 4.1; C 4.4; C 5.2 |
| DEP-04 | Simplify i3: the interface and an account to read assets, work orders and inspections, and to write work requests | 2027-03-01 | C 6.2; C 6.9 |
| DEP-05 | The Authority's identity provider: an application registration for sign-in | 2027-03-01 | C 5.9 |
| DEP-06 | The hosting model accepted, with data ownership and residency decided | 2027-02-12 | B ii |
| DEP-07 | Network: a DMZ segment for the gateways, outbound rules, and the security team's review | 2027-03-12 | C 5.9; C 4.6 |
| DEP-08 | Schneider EcoStruxure: the version and licence confirmed, and the integrator's time to bind the sample points | 2027-03-12 | C 6.3; C 6.9 |
| DEP-09 | The Allen-Bradley programs and tag lists for the sample bridge and conveyor, and who maintains them | 2027-03-19 | C 6.4; C 6.5; C 6.9 |
| DEP-10 | The elevator and escalator maintenance contract: the maker's monitoring or interface option for one elevator and one escalator | 2027-03-19 | C 6.6 |
| DEP-11 | Badges and escorts for our field staff in secured and airside areas | 2027-02-15 | C 4.6 |
| DEP-12 | An asset ID in Simplify i3 for each new sensor before it is fitted | 2027-04-02 | C 5.4; C 6.2 |
| DEP-13 | Business Central: read access to the fixed asset records | 2027-03-19 | C 6.9 |
| DEP-14 | Genetec: evaluation access and the security team's rules for clips and events | 2027-03-19 | C 6.7; C 6.9 |
| DEP-15 | The model way chosen (a model in the hosting account, a direct service behind obfuscation, a local model, or none) and the data classes each may see | 2027-04-30 | C 3.7; C 5.7 |
| DEP-16 | Airfield: which airfield sources are shared, and whether the lighting system's maker agrees to a read-only report | 2027-04-02 | C 1.3; C 6.9 |
| DEP-17 | Training attendees named per group, with their dates | 2027-05-14 | C 4.11; C 7.3 |
| DEP-18 | Acceptance criteria agreed and the acceptance testers named for 2027-06-01 to 2027-06-11 | 2027-05-28 | C 7.1; B iii |
| DEP-19 | The go-live decision | 2027-06-18 | C 7.1; B iii |
| DEP-20 | Approval of the Project Implementation Plan | 2027-03-05 | RFP 2.9; C 7.1 |
| DEP-21 | The grant agreement for the $1.2 million, with its reporting, records and acceptance terms | 2027-02-19 | RFP 3; B vi |
| DEP-22 | The order of later work, set by the Authority each year | 2027-07-01 | C 1.3; RFP 6.16 |
| DEP-23 | The acceptance signature, given in writing | 2027-06-30 | C 7.1 |