Phase 12: Year 5: real-time data on all Airport facilities

It renews the roadmap with the Authority for the years after the fifth and keeps support, sustainment and professional services running to 2032-01-31.

No picture for this component.

Plan · The RFP and the plan · Phases

Phase 12: Year 5: real-time data on all Airport facilities

It renews the roadmap with the Authority for the years after the fifth and keeps support, sustainment and professional services running to 2032-01-31.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Plan
Status
not linked
Airport layer
not linked
Airport area
not linked
System
not linked
Sensor type
not linked

Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

It renews the roadmap with the Authority for the years after the fifth and keeps support, sustainment and professional services running to 2032-01-31. It reaches the aim the President described to the Board on 2026-01-06, using only the standard and the configuration path set in phase 1.

Dates
2031-02-01 to 2032-01-31
Requirements delivered
4
Work units
8
Needs
Needs P11
Work units (8)
UnitTitleDatesRFPNeeds
WU-12-1Year 5 Environments at 40,000 Points2031-02-01 to 2032-01-31B vi, C 7.4
WU-12-2Year 5 Cost and Health Reporting2031-02-01 to 2032-01-31B vi, C 7.4
WU-12-3Facility Scope Confirmation for Year 52031-02-01 to 2032-01-31C 1.1, C 2.7, RFP 3DEP-22
WU-12-4Onboard Named Facilities by Configuration2031-02-01 to 2032-01-31C 1.1, C 2.7, RFP 3DEP-22
WU-12-5Live Data Coverage Registry by Facility2031-02-01 to 2032-01-31C 1.1, C 2.7, RFP 3DEP-22
WU-12-6Board Aim Verification2031-02-01 to 2032-01-31C 1.1, C 2.7, RFP 3DEP-22
WU-12-7Roadmap Renewal for Years After the Fifth2031-02-01 to 2032-01-31B iii, C 7.4DEP-22
WU-12-8Year 5 Support and Sustainment2031-02-01 to 2032-01-31B v, C 7.4DEP-22
WU-12-1: Year 5 Environments at 40,000 Points

Scale the development, staging and production environments from the 30,000-point sizing to the 40,000-point sizing through the existing templates and run them from 2031-02-01 to 2032-01-31 without a rebuild.

Depends on
none
Authority dependencies
none
Traces to
REQ-SFB-069
Functional requirements
3
WU-12-2: Year 5 Cost and Health Reporting

Depends on
WU-12-1
Authority dependencies
none
Traces to
REQ-SFB-069
Functional requirements
4
WU-12-3: Facility Scope Confirmation for Year 5

Record the facilities the Authority names under its refreshed DEP-22 order and map each one to the standard, the P11 gap survey and the retrofit route.

Depends on
none
Authority dependencies
DEP-22
Traces to
REQ-SFB-041, REQ-SFB-056
Functional requirements
4
WU-12-4: Onboard Named Facilities by Configuration

Bring each remaining named facility onto the twin through the phase 1 standard and the configuration path, with its sources registered read-only and its exchange sheets approved.

Depends on
WU-12-1, WU-12-3
Authority dependencies
DEP-22
Traces to
REQ-SFB-041, REQ-SFB-056
Functional requirements
4
WU-12-5: Live Data Coverage Registry by Facility

Build the point registry view by facility that shows live data and its source for every named facility, with no count shown that was not loaded.

Depends on
WU-12-4
Authority dependencies
DEP-22
Traces to
REQ-SFB-041, REQ-SFB-056
Functional requirements
4
WU-12-6: Board Aim Verification

Verify and record that every facility the Authority names shows live data with its source, as the closing evidence for the aim stated to the Board on 2026-01-06.

Depends on
WU-12-5
Authority dependencies
DEP-22
Traces to
REQ-SFB-041, REQ-SFB-056
Functional requirements
0
WU-12-7: Roadmap Renewal for Years After the Fifth

Renew the roadmap with the Authority from the P7 measures, the year 5 health data and the coverage registry, ordering each item with its value as the hand-off beyond 2032-01-31.

Depends on
WU-12-2, WU-12-5
Authority dependencies
DEP-22
Traces to
REQ-SFB-057
Functional requirements
4
WU-12-8: Year 5 Support and Sustainment

Run support, sustainment and professional services for year 5 to 2032-01-31 under the carried-forward terms and keep the support log as closing evidence.

Depends on
none
Authority dependencies
DEP-22
Traces to
REQ-SFB-053, REQ-SFB-054
Functional requirements
3
Requirements delivered (4)
IdRequirementAcceptanceEvidence
REQ-IMP-070the environments stay healthy and the bill tracks the model.the monthly cost and health report.
REQ-IMP-071Real-time data on all Airport facilities, as the President described the aim to the Board, with each source on the registry.every facility the Authority names shows live data with its source.the point registry by facility.
REQ-IMP-072The roadmap renewed with the Authority for the years after the fifth.the roadmap orders each item with its value.the roadmap.
REQ-IMP-073Support, sustainment and professional services for year 5.support terms met.the support log.