Connects the Authority's systems to the twin and shows each one working end to end: Simplify i3 is read on a schedule and receives confirmed work requests, EcoStruxure is read through an outbound-only gateway, Business Central supplies cost, and Genetec is evaluated with images kept inside the security boundary.
Connects the Authority's systems to the twin and shows each one working end to end: Simplify i3 is read on a schedule and receives confirmed work requests, EcoStruxure is read through an...
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
Connects the Authority's systems to the twin and shows each one working end to end: Simplify i3 is read on a schedule and receives confirmed work requests, EcoStruxure is read through an outbound-only gateway, Business Central supplies cost, and Genetec is evaluated with images kept inside the security boundary. Each system gets an Authority-approved information exchange sheet, and the phase ends with the integration proof shown on the record on 2027-04-16. It matters because the P4 sensor samples are only credible if the interfaces underneath them work.
Dates
2027-03-08 to 2027-04-16
Requirements delivered
7
Work units
9
Needs
Needs P2
Work units (9)
Unit
Title
Dates
RFP
Needs
WU-3-1
Interface framework and run logging
2027-04-12 to 2027-04-16
C 4.5, C 4.6
DEP-02
WU-3-2
Information exchange sheet model and approval workflow
2027-03-08 to 2027-04-09
C 4.7, C 5.5
DEP-02
WU-3-3
Simplify i3 scheduled read and field map
2027-03-08 to 2027-03-26
C 5.4, C 6.2, C 6.9
DEP-04
WU-3-4
Simplify i3 confirmed work request write-back
2027-03-29 to 2027-04-09
C 5.4, C 6.2, RFP 2.19
DEP-04
WU-3-5
EcoStruxure outbound-only edge gateway read
2027-03-15 to 2027-04-02
C 3.5, C 6.3, C 6.9
DEP-07, DEP-08
WU-3-6
Business Central cost read
2027-03-22 to 2027-04-02
C 6.7, C 6.9
DEP-13
WU-3-7
Genetec evaluation inside the security boundary
2027-03-22 to 2027-04-09
C 4.7, C 6.7, C 6.9
DEP-14
WU-3-8
Exchange sheets completed per system
2027-04-12 to 2027-04-16
C 4.5, C 4.6
DEP-02
WU-3-9
Integration proof run and test records
2027-04-12 to 2027-04-16
C 4.5, C 4.6
DEP-02
WU-3-1: Interface framework and run logging
Build the shared scheduled-interface runner that registers each source in the P2 registry and records every call, run and failure in the audit log.
Depends on
none
Authority dependencies
DEP-02
Traces to
REQ-SFB-023
Functional requirements
0
WU-3-2: Information exchange sheet model and approval workflow
Create the per-system exchange sheet structure covering status, alarms, faults, availability, performance, events, maintenance indicators and energy, with Authority approval recorded against each sheet.
Depends on
none
Authority dependencies
DEP-02
Traces to
REQ-SFB-021, REQ-SFB-022
Functional requirements
3
WU-3-3: Simplify i3 scheduled read and field map
Read asset records, hierarchies, work orders, inspections and maintenance history from Simplify i3 on a schedule into the object model, keeping i3 as the maintenance record and publishing the field map.
Depends on
WU-3-1
Authority dependencies
DEP-04
Traces to
REQ-SFB-006, REQ-SFB-007
Functional requirements
0
WU-3-4: Simplify i3 confirmed work request write-back
Write work requests to Simplify i3 only after a person confirms them, and read the resulting work order status back into the twin.
Read EcoStruxure status, alarms, conditions and runtime through a gateway that publishes outward only, and show an air handler alarm with its age in the twin.
Depends on
WU-3-1
Authority dependencies
DEP-07, DEP-08
Traces to
REQ-SFB-017
Functional requirements
4
WU-3-6: Business Central cost read
Read fixed asset cost records from Business Central, join them to assets with their source shown, and ensure the twin writes nothing back.
Depends on
WU-3-1, WU-3-3
Authority dependencies
DEP-13
Traces to
REQ-SFB-026
Functional requirements
0
WU-3-7: Genetec evaluation inside the security boundary
Evaluate Genetec event clips and intelligent visual analytics with camera images kept inside the security boundary and document what is shown and to whom.
Depends on
WU-3-1
Authority dependencies
DEP-14
Traces to
REQ-SFB-025
Functional requirements
4
WU-3-8: Exchange sheets completed per system
Author and submit one Authority-approved exchange sheet for each connected system using the sheet model and the behavior observed in the working interfaces.
Depends on
WU-3-2, WU-3-3, WU-3-5, WU-3-6, WU-3-7
Authority dependencies
DEP-02
Traces to
REQ-SFB-023
Functional requirements
3
WU-3-9: Integration proof run and test records
Run each approved interface end to end before the Authority on 2027-04-16 and file the interface test records as evidence for acceptance and the grant close-out.
Depends on
WU-3-4, WU-3-8
Authority dependencies
DEP-02
Traces to
REQ-SFB-023
Functional requirements
0
Requirements delivered (7)
Id
Requirement
Acceptance
Evidence
REQ-IMP-017
Simplify i3 read on a schedule: asset records, hierarchies, work orders, inspections and maintenance history, i3 staying the record of maintenance.
asset records and work orders read from Simplify i3 on a schedule.
the interface run log and the field map.
REQ-IMP-018
Work requests written to Simplify i3 after a person confirms them, and the work order status read back.
a confirmed request appears in Simplify i3 and its status returns to the twin.
the write-back log.
REQ-IMP-019
Schneider EcoStruxure read through an edge gateway that publishes outward: status, alarms, conditions and runtime, the BMS staying the control system.
an air handler's alarm appears in the twin with its age.
the interface log.
REQ-IMP-020
Microsoft 365 Business Central read for the cost joined to each asset; the twin writes nothing to it.
an asset shows its cost from Business Central with its source.
the interface log.
REQ-IMP-021
Genetec Security Desk evaluated for event clips and intelligent visual analytics, with camera images kept inside the security boundary.
the evaluation states what is shown and to whom.
the evaluation note.
REQ-IMP-022
An information exchange sheet for each system, approved by the Authority: status, alarms, faults, availability, performance, events, maintenance indicators and energy where they apply.
one approved sheet per system.
the exchange sheets.
REQ-IMP-023
The integration proof shown to the Authority: each connected system working end to end in the twin, on the record.
each approved interface passes its test in front of the Authority.