Phase 5: Spatial, dashboards, workflows, use cases and the backlog
Configures everything a person uses on the data read so far: spatial sources in plan and 3D with a GIS maturity assessment, role dashboards, maintenance workflows that hand work to Simplify i3, and the records, KPIs, rules and reports built on loaded data.
Configures everything a person uses on the data read so far: spatial sources in plan and 3D with a GIS maturity assessment, role dashboards, maintenance workflows that hand work to Simplify i3,...
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
Configures everything a person uses on the data read so far: spatial sources in plan and 3D with a GIS maturity assessment, role dashboards, maintenance workflows that hand work to Simplify i3, and the records, KPIs, rules and reports built on loaded data. It also adds predictive maintenance on the sample points with a person confirming every proposal, places the fifteen C 4.10 use cases, and builds the risk-ranked deferred maintenance backlog. It matters because it turns the P3 interfaces and P4 sample sensors into what the Authority's staff will see, train on and accept, and every figure must recompute from loaded records only.
Dates
2027-04-05 to 2027-05-28
Requirements delivered
9
Work units
10
Needs
Needs P4
Work units (10)
Unit
Title
Dates
RFP
Needs
WU-5-1
Load spatial sources and show plan and 3D views
2027-04-05 to 2027-04-23
C 3.8, C 4.4, C 5.2
DEP-03
WU-5-2
GIS maturity assessment and roadmap
2027-04-12 to 2027-05-07
C 4.4
DEP-03
WU-5-3
Maintenance records, PM calendar, trends and KPI computation
2027-05-03 to 2027-05-21
C 2.7, C 5.3, C 5.4, C 5.6
DEP-04
WU-5-4
Rules library and duty register
2027-05-03 to 2027-05-21
C 2.7, C 5.3, C 5.4, C 5.6
DEP-04
WU-5-5
Role dashboards
2027-04-26 to 2027-05-14
C 4.8, C 5.6
DEP-02
WU-5-6
Configured reports and executive performance dashboard
2027-05-10 to 2027-05-21
C 4.10, C 4.3, C 5.1
WU-5-7
Maintenance workflows with Simplify i3 hand-off
2027-04-26 to 2027-05-21
C 4.9, C 5.8
DEP-04
WU-5-8
Predictive maintenance proposals with person confirmation
2027-05-03 to 2027-05-28
C 3.7, C 5.7
DEP-15
WU-5-9
Risk-ranked deferred maintenance backlog
2027-05-03 to 2027-05-28
C 2.3, C 5.4
DEP-04
WU-5-10
C 4.10 use case register
2027-05-17 to 2027-05-28
C 4.10
WU-5-1: Load spatial sources and show plan and 3D views
Load the spatial sources received at kickoff with their metadata and show the terminal in plan and 3D with assets placed on the floor plans (REQ-IMP-031).
Depends on
none
Authority dependencies
DEP-03
Traces to
REQ-SFB-012, REQ-SFB-014, REQ-SFB-016
Functional requirements
4
WU-5-2: GIS maturity assessment and roadmap
Score each spatial source for quality, completeness, governance and integration and order a roadmap of recommendations (REQ-IMP-032).
Depends on
WU-5-1
Authority dependencies
DEP-03
Traces to
REQ-SFB-013
Functional requirements
4
WU-5-3: Maintenance records, PM calendar, trends and KPI computation
Configure maintenance records, the PM calendar, trends and KPIs so every figure recomputes from loaded records only, with a pack manifest listing what was loaded (REQ-IMP-035, first part).
Build the dashboards for engineering, facilities management, maintenance, operations, executive management, IT and contractors with standard tools staff can change, each role opening on its own (REQ-IMP-033).
WU-5-6: Configured reports and executive performance dashboard
Produce configuration-built reports, including a monthly report and a plain-words executive performance dashboard a Board member can read (REQ-IMP-036).
Depends on
WU-5-3, WU-5-5
Authority dependencies
none
Traces to
REQ-SFB-033, REQ-SFB-035
Functional requirements
4
WU-5-7: Maintenance workflows with Simplify i3 hand-off
Implement preventive and corrective maintenance, work request, outage coordination and inspection workflows that hand work to Simplify i3, with role-based notifications and escalation of unanswered alarms (REQ-IMP-034).
Depends on
WU-5-3
Authority dependencies
DEP-04
Traces to
REQ-SFB-030, REQ-SFB-031, REQ-SFB-032
Functional requirements
4
WU-5-8: Predictive maintenance proposals with person confirmation
Detect anomalies on the sample points and propose work requests that a person confirms, with every model call logged, a model card, and the model way chosen under DEP-15 (REQ-IMP-037).
Build the deferred maintenance backlog in one place by asset, age, place and condition, ranked by risk and reconciled with open work in Simplify i3 (REQ-IMP-039).
Depends on
WU-5-3
Authority dependencies
DEP-04
Traces to
REQ-SFB-062
Functional requirements
4
WU-5-10: C 4.10 use case register
Map each of the fifteen representative use cases of C 4.10 to this release or a dated roadmap slot, with evidence from the built dashboards, spatial views, workflows and backlog (REQ-IMP-038).
Depends on
WU-5-2, WU-5-5, WU-5-6, WU-5-8, WU-5-9
Authority dependencies
none
Traces to
REQ-SFB-034
Functional requirements
4
Requirements delivered (9)
Id
Requirement
Acceptance
Evidence
REQ-IMP-031
The spatial sources present at kickoff loaded with their metadata, and the terminal shown in plan and in 3D with assets on the floor plans received.
each available source loads, and an asset opens from its place on the plan.
the spatial inventory and a capture.
REQ-IMP-032
The GIS maturity assessment, with recommendations and a roadmap for quality, completeness, governance and integration.
the assessment scores each source and orders the roadmap.
the assessment report.
REQ-IMP-033
Role dashboards for engineering, facilities management, maintenance, operations, executive management, IT and contractors, built with standard tools staff can change.
each role opens on its own dashboard.
captures per role.
REQ-IMP-034
Workflows for preventive and corrective maintenance, work requests, outage coordination and inspections, each handing work to Simplify i3, with notifications and escalation by role.
an outage workflow ends with a work request in Simplify i3, and an unanswered alarm escalates.
the workflow export and the notification log.
REQ-IMP-035
Maintenance records, the PM calendar, trends, KPIs, the rules library and the duty register configured on the data read so far.
each KPI recomputes from the records, and no count is shown that was not loaded.
the KPI sheet and the pack manifest.
REQ-IMP-036
Configured reports, including the executive performance dashboard in plain words a Board member reads.
a monthly report built from configuration.
the report.
REQ-IMP-037
Predictive maintenance on the sample points: an anomaly proposes a work request for a person to confirm, every model call on the record, and the model way the Authority chose.
a test anomaly yields a proposed request that a person confirms.
the confirmation log and the model card.
REQ-IMP-038
The fifteen representative use cases of C 4.10, each in this release or in a dated slot on the roadmap.
each use case has a release or a roadmap slot.
the use case register.
REQ-IMP-039
The deferred maintenance backlog built in one place from the Authority's records, by asset, age, place and condition, and ranked by risk.
the buckets reconcile with the open work in Simplify i3.