Phase 7: Acceptance, go-live and the phase 1 close-out
This phase agrees the acceptance criteria with the Authority, runs user acceptance testing with the Authority's testers, and fixes each defect through the reviewed pipeline.
This phase agrees the acceptance criteria with the Authority, runs user acceptance testing with the Authority's testers, and fixes each defect through the reviewed pipeline.
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
This phase agrees the acceptance criteria with the Authority, runs user acceptance testing with the Authority's testers, and fixes each defect through the reviewed pipeline. It matters because 2027-06-30 is the hard end of the funded window, and payment depends on each deliverable carrying written acceptance.
Dates
2027-05-17 to 2027-06-30
Requirements delivered
6
Work units
6
Needs
Needs P6
Work units (6)
Unit
Title
Dates
RFP
Needs
WU-7-1
User acceptance plan and criteria
2027-05-17 to 2027-05-28
B iii, C 7.1
DEP-18
WU-7-2
UAT execution and defect log
2027-06-01 to 2027-06-11
B iii, C 7.1
DEP-18
WU-7-3
Defect fixes through the reviewed pipeline
2027-06-07 to 2027-06-18
B v, C 7.4
WU-7-4
Production go-live with failover and restore drills
2027-06-21 to 2027-06-23
B iii, C 7.1
DEP-19
WU-7-5
Written acceptance and baseline comparison
2027-06-24 to 2027-06-30
C 2.3, C 7.1, RFP 3
DEP-23
WU-7-6
Grant close-out package
2027-06-21 to 2027-06-30
B vi, RFP 3
DEP-21
WU-7-1: User acceptance plan and criteria
Draft the user acceptance plan with test cases and pass criteria traced to the validated requirements and kickoff baselines, ready for the Authority to sign by DEP-18 (REQ-IMP-046).
Depends on
none
Authority dependencies
DEP-18
Traces to
REQ-SFB-052
Functional requirements
4
WU-7-2: UAT execution and defect log
Run acceptance testing on staging with the Authority's testers, recording a pass or a logged defect against each criterion in the UAT record (REQ-IMP-047).
Depends on
WU-7-1
Authority dependencies
DEP-18
Traces to
REQ-SFB-052
Functional requirements
4
WU-7-3: Defect fixes through the reviewed pipeline
Fix each logged UAT defect through pull requests that need a reviewer and pass CI checks, then redeploy to staging for retest (REQ-IMP-048).
Depends on
WU-7-2
Authority dependencies
none
Traces to
REQ-SFB-068
Functional requirements
4
WU-7-4: Production go-live with failover and restore drills
Put production in service on the Authority's go-live decision and pass failover and restore drills on production, filing the drill records (REQ-IMP-049).
Depends on
WU-7-3
Authority dependencies
DEP-19
Traces to
REQ-SFB-069
Functional requirements
0
WU-7-5: Written acceptance and baseline comparison
Compare the phase 1 measures with the kickoff baselines in a measures report and obtain the Authority's signed acceptance (REQ-IMP-050).
Depends on
WU-7-4
Authority dependencies
DEP-23
Traces to
REQ-SFB-052, REQ-SFB-058
Functional requirements
4
WU-7-6: Grant close-out package
Assemble the state appropriation close-out package from filed evidence so each deliverable carries its written acceptance, submitted by 2027-06-30 (REQ-IMP-051).
Depends on
WU-7-5
Authority dependencies
DEP-21
Traces to
none
Functional requirements
3
Requirements delivered (6)
Id
Requirement
Acceptance
Evidence
REQ-IMP-046
The user acceptance plan and its criteria agreed with the Authority.
the criteria are signed before testing starts.
the acceptance plan.
REQ-IMP-047
User acceptance testing with the Authority's testers, with our support.
each criterion has a pass or a logged defect.
the UAT record.
REQ-IMP-048
Defects from acceptance testing fixed through the pipeline, each reviewed before release.
no change merges without a reviewer.
the issues and pull requests.
REQ-IMP-049
Go-live: production in service, with a failover and a restore drill passed.
both drills pass on production.
the drill records.
REQ-IMP-050
Acceptance signed, and the measures compared with the kickoff baselines.
the Authority signs acceptance.
the acceptance record and the measures report.
REQ-IMP-051
The phase 1 close-out package for the state appropriation, assembled from the evidence already filed under the grant agreement's terms.