AirfieldpathOrlando Sanford International

3.23 · The RFP and the plan · Phases

Phase 10: Year 3: the wider terminal systems and prediction across classes

Brings in fire alarm, electrical, utility and energy management systems read-only through the registry, with licensed maintainers keeping control.

No picture for this component.

Plan · The RFP and the plan · Phases

Phase 10: Year 3: the wider terminal systems and prediction across classes

Brings in fire alarm, electrical, utility and energy management systems read-only through the registry, with licensed maintainers keeping control.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Plan
Status
not linked
Airport layer
not linked
Airport area
not linked
System
not linked
Sensor type
not linked

Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Brings in fire alarm, electrical, utility and energy management systems read-only through the registry, with licensed maintainers keeping control. Extends person-confirmed prediction from the phase 1 samples to every connected class, with intelligent visual analytics only where the Authority approves them and the model way chosen under DEP-15.

Dates
2029-02-01 to 2030-01-31
Requirements delivered
4
Work units
10
Needs
Needs P9
Work units (10)
UnitTitleDatesRFPNeeds
WU-10-1Year 3 environments scaled to 20,000 points2029-02-01 to 2030-01-31B vi, C 7.4
WU-10-2Year 3 order of work and gateway review2029-02-01 to 2030-01-31C 4.7, C 6.7DEP-22
WU-10-3Fire alarm read-only connector and exchange sheet2029-02-01 to 2030-01-31C 4.7, C 6.7DEP-22
WU-10-4Electrical and utility monitoring read-only connectors2029-02-01 to 2030-01-31C 4.7, C 6.7DEP-22
WU-10-5Energy management read-only connector2029-02-01 to 2030-01-31C 4.7, C 6.7DEP-22
WU-10-6Model way and data class gate per DEP-152029-02-01 to 2030-01-31C 1.1, C 3.7, C 5.7DEP-15, DEP-22
WU-10-7Prediction across every connected class2029-02-01 to 2030-01-31C 1.1, C 3.7, C 5.7DEP-15, DEP-22
WU-10-8Model cards and prediction coverage by class2029-02-01 to 2030-01-31B vi, C 7.4
WU-10-9Intelligent visual analytics behind the approval gate2029-02-01 to 2030-01-31C 1.1, C 3.7, C 5.7DEP-15, DEP-22
WU-10-10Year 3 support, sustainment and professional services2029-02-01 to 2030-01-31B v, C 7.4DEP-22
WU-10-1: Year 3 environments scaled to 20,000 points

Depends on
none
Authority dependencies
none
Traces to
REQ-SFB-069
Functional requirements
4
WU-10-2: Year 3 order of work and gateway review

Record the Authority's DEP-22 order for year 3 and obtain the DEP-07 network and security review for any new outbound-only gateways before systems are brought in.

Depends on
none
Authority dependencies
DEP-22
Traces to
REQ-SFB-026
Functional requirements
4
WU-10-3: Fire alarm read-only connector and exchange sheet

Register the fire alarm system's points through the registry as read-only, with its approved exchange sheet and licensed maintainers keeping control.

Depends on
WU-10-1, WU-10-2
Authority dependencies
DEP-22
Traces to
REQ-SFB-026
Functional requirements
4
WU-10-4: Electrical and utility monitoring read-only connectors

Register the electrical and utility monitoring systems' points through the registry as read-only, each with an approved exchange sheet and a place in the object model.

Depends on
WU-10-1, WU-10-2
Authority dependencies
DEP-22
Traces to
REQ-SFB-026
Functional requirements
4
WU-10-5: Energy management read-only connector

Register the energy management system's points through the registry as read-only with its exchange sheet, joined to the assets and spaces it measures.

Depends on
WU-10-1, WU-10-2
Authority dependencies
DEP-22
Traces to
REQ-SFB-026
Functional requirements
0
WU-10-6: Model way and data class gate per DEP-15

Apply the Authority's chosen model way and the data classes each way may see as an enforced gate on every prediction and visual analytics call, with each call on the record.

Depends on
none
Authority dependencies
DEP-15, DEP-22
Traces to
REQ-SFB-036, REQ-SFB-037
Functional requirements
3
WU-10-7: Prediction across every connected class

Extend the person-confirmed anomaly-to-work-request prediction from the phase 1 samples to every connected asset class, each prediction naming its inputs and waiting for a person.

Depends on
WU-10-6, WU-10-3, WU-10-4, WU-10-5
Authority dependencies
DEP-15, DEP-22
Traces to
REQ-SFB-036, REQ-SFB-037
Functional requirements
4
WU-10-8: Model cards and prediction coverage by class

Publish a model card per class and a coverage view showing which assets are predicted and which gaps remain for the year 4 retrofit survey.

Depends on
WU-10-7
Authority dependencies
none
Traces to
REQ-SFB-069
Functional requirements
3
WU-10-9: Intelligent visual analytics behind the approval gate

Enable intelligent visual analytics only for classes the Authority approves, within the Genetec evaluation limits on what is shown and to whom.

Depends on
WU-10-6
Authority dependencies
DEP-15, DEP-22
Traces to
REQ-SFB-036, REQ-SFB-037
Functional requirements
4
WU-10-10: Year 3 support, sustainment and professional services

Deliver year 3 support, upgrades and professional services against the contract terms and keep the support log and sustainment record that carry into years 4 and 5.

Depends on
WU-10-1
Authority dependencies
DEP-22
Traces to
REQ-SFB-053, REQ-SFB-054
Functional requirements
3
Requirements delivered (4)
IdRequirementAcceptanceEvidence
REQ-IMP-062the environments stay healthy and the bill tracks the model.the monthly cost and health report.
REQ-IMP-063Further terminal systems read where the Authority approves: fire alarm, electrical and utility monitoring, and energy management, read only, with licensed maintainers keeping control.each system joins read-only through the registry.the exchange sheets.
REQ-IMP-064Prediction across every connected class, with intelligent visual analytics where the Authority approves them.each prediction names its inputs and waits for a person.the model cards.
REQ-IMP-065Support, sustainment and professional services for year 3.support terms met.the support log.