AirfieldpathOrlando Sanford International

2.9 · Proof of concept · Terminal

Boarding Bridges Real

Which of the 16 boarding bridges are ready for the next flight.

Picture: Headless capture of poc/index.html?v=pbb&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.
Clip: Capture of poc/index.html?v=pbb&m=light, 4 seconds of the screen as it runs, 10 frames a second. No sound.

Screen · Proof of concept · Terminal

Boarding Bridges

Which of the 16 boarding bridges are ready for the next flight.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Screen
Status
partly met
Airport layer
Screens: the POC story and the spines
Airport area
not linked
System
not linked
Sensor type
not linked

Open the screen · Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Open this screen in the proof of concept

Boarding Bridges, a capture of the screen
Capture of the screen: Boarding Bridges. Dark and light modes.

Narration line

It shows each bridge with its status, availability, assignment, alarms and faults.

Source: poc/bearings/pbb.json, beat "What it shows"

Group
Terminal
Status as the app labels it
Real
Basis
The screen runs. Data: carefully crafted and curated test data for common use cases.
What the screen must do (3)
  • Show each bridge with its status, availability, assignment, alarms and faults (REQ-SFB-018)
  • Show maintenance, inspections, performance and history (REQ-SFB-018, REQ-SFB-007)
  • Show the path to the Allen-Bradley bridge controls, listed Not Connected, as an assessment first (REQ-SFB-018, REQ-SFB-023)
Requirements matrix rows that name this screen (5)
RowRFP sectionRequirementStatus
M-017RFP 3, focus areaPassenger boarding bridge systemspartly met
M-065B iiiAddress the terminal and airfield focus areaspartly met
M-109C 4.7Recommend information exchanges per systempartly met
M-123C 5.5Systems integration with status, state, alarms, faults, availability, performance, events, indicators, energypartly met
M-133C 6.4Boarding bridge information (status, availability, assignments, alarms, maintenance, faults, indicators, history, inspections)partly met
Requirement identifiers (3)

REQ-SFB-007, REQ-SFB-018, REQ-SFB-023