3.1 · The RFP and the plan · The RFP

Requirements matrix

All 147 requirements of RFP 2027-006 and its Attachments A, B and C, section by section, with the screen that shows each.

No picture for this component.

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Status words

WordDefinitionRows
metAlready held by this work.9
partly metA proof-of-concept screen shows it with test data, and no production software exists yet.77
targetDesigned in the E1 or E2 requirement sets, or to be supplied by the delivery firm, and not shown in the proof of concept.58
not offeredNot provided by this work today.3

Each row gives the RFP section, the requirement in the RFP's words, the screens that show it and the capability class Attachment B III asks for. Standard means standard in the Airfieldpath product as designed. Airfieldpath is not a released commercial product today, so no row is met for software. Select a row to see its requirement-set references.

RowRFP sectionRequirementScreenClassStatus
M-001RFP 1.1Configure, integrate, deploy and support a commercially available Digital Twin PlatformPlatform Familystandardnot offered
M-002RFP 1.1A common operational environment integrating information from selected airport systemsTerminal Assets Now, Systems of Record, Point Registrystandardpartly met
M-003RFP 1.1Enhanced visualization, analytics, dashboards, workflows and decision supportThe Terminal in 3D, Trends and Alarms, Maintenance KPIs, Role Dashboards, Workflows, Predictive Maintenancestandardpartly met
M-004RFP 1.1; C 3.5Complement, not replace; existing systems remain authoritative systems of recordSystems of Record, Maintenance and Work Orders, Work Ordersstandardpartly met
M-005RFP 1.2A foundation for a long-term capability that evolvesImplementation and Roadmap, Rules and Data Librarystandardpartly met
M-006RFP 2.19System of Record defined as the authoritative source in its domainSystems of Record, Point Registrystandardpartly met
M-007RFP 3, objective 1A scalable platform for operations, maintenance and asset managementRules and Data Library, Platform Familystandardtarget
M-008RFP 3, objective 2Visibility into assets, condition, status, maintenance and lifecycleAsset Record, Terminal Assets Now, Maintenance KPIsstandardpartly met
M-009RFP 3, objective 3Better preventive and corrective maintenance through access to informationPM Calendar, Work Orders, Backlog, Predictive Maintenanceconfiguredpartly met
M-010RFP 3, objective 4Integrate selected enterprise and operational systemsSystems of Record, Point Registryintegrated third-partytarget
M-011RFP 3, objective 5Configurable dashboards, spatial visualizations, workflows, analytics and reportingRole Dashboards, Workflows, Spatial Enablementconfiguredpartly met
M-012RFP 3, objective 6A sustainable platform that expands through integrations and use casesImplementation and Roadmap, Supportstandardtarget
M-013RFP 3, objective 7Open, standards-based, interoperable, evolving without proprietary customizationOpen Standards, Point Registrystandardpartly met
M-014RFP 3, objective 8A formal process repository for post-project operation and maintenance
References: E2 REQ-SFB-049
Implementation and Roadmap, Security and Administrationconfiguredtarget
M-015RFP 3, initial scopeAsset management optimization as the first focusAsset Record, Work Orders, Maintenance KPIsconfiguredpartly met
M-016RFP 3, focus areaVertical transportation (elevators, escalators, moving walkways)Vertical Transportation, Trends and Alarms, Maintenance KPIsintegrated third-partypartly met
M-017RFP 3, focus areaPassenger boarding bridge systemsBoarding Bridges, Trends and Alarmsintegrated third-partypartly met
M-018RFP 3, focus areaBaggage handling systemsBaggage Handling, Trends and Alarmsintegrated third-partypartly met
M-019RFP 3, focus areaHVAC systemsHVAC and Building Management, Trends and Alarms, Predictive Maintenanceintegrated third-partypartly met
M-020RFP 3, focus areaAirfield infrastructureAirfield Now, Pavement, Airfield Lighting, Self-Inspectionstandardpartly met
M-021RFP 3, focus areaOther assets identified during implementationPoint Registry, Rules and Data Libraryconfiguredtarget
M-022RFP 3, planningProject initiation; validate priorities; implementation approach and scheduleImplementation and Roadmapconfiguredtarget
M-023RFP 3, configurationConfigure asset models, dashboards, workflows, reports, notifications, security and user interfacesRole Dashboards, Workflows, Security and Administration, Asset Recordconfiguredpartly met
M-024RFP 3, data integrationIntegrate CMMS/EAM, BAS/BMS, HVAC, PBB, BHS, vertical transportation and othersSystems of Record, Point Registryintegrated third-partytarget
M-025RFP 3, spatialIncorporate GIS, CAD, BIM, LiDAR, imagery, floor plans, drawings, asset locationsSpatial Enablement, The Airport in 3D, The Terminal in 3Dconfiguredpartly met
M-026RFP 3, dashboardsRole dashboards for engineering, facilities, maintenance, operations, IT and executivesRole Dashboardsconfiguredpartly met
M-027RFP 3, use casesUse cases for asset performance, maintenance optimization, status visibility, decision support
References: E2 REQ-SFB-034
Terminal Assets Now, Maintenance KPIs, Predictive Maintenance, Implementation and Roadmapconfiguredpartly met
M-028RFP 3, analyticsAI-enabled analytics where practical and beneficialPredictive Maintenance, Trends and Alarmsstandardpartly met
M-029RFP 3, trainingFormal O&M processes, training and knowledge transferImplementation and Roadmap, Supportconfiguredtarget
M-030RFP 3, documentationImplementation, configuration, integration and user documentationImplementation and Roadmapconfiguredtarget
M-031RFP 3, ongoingOngoing professional services for enhancementsImplementation and Roadmap, Supportconfiguredtarget
M-032RFP 3, characteristicsCommercially supported software; configuration before customization; open integration; sustainable support; measurable value; expansionPlatform Family, Open Standards, Maintenance KPIsstandardpartly met
M-033RFP 3, final paragraphBase the solution on Attachment C; provide software, licences, configuration, integration, documentation, training, supportRFP Compliancen/amet
M-034RFP 4Meeting rooms and accommodation requestsn/amet
M-035RFP 5.1Draft Contract to follow by addendumn/atarget
M-036RFP 6.1Responses binding 120 days after the deadlinen/atarget
M-037RFP 6.2Identify material assumptions, exclusions, constraints, dependencies, third-party requirements, risks and Authority resourcesImplementation and Roadmapn/amet
M-038RFP 6.3; A 3Questions only through the portal by the deadlinen/amet
M-039RFP 6.5Consent to inquiry and verificationn/atarget
M-040RFP 6.6Comply with all laws; hold licences and permitsn/atarget
M-041RFP 6.7, 6.8, 6.9Public entity crimes, scrutinized companies, suspension and debarment certificationsn/atarget
M-042RFP 6.10Non-discriminationn/atarget
M-043RFP 6.11; 10.2.2Insurance: CGL 1M and 2M, auto 1M, professional 1M, workers compensation, broker lettern/atarget
M-044RFP 6.12, 6.16Non-exclusive; no guaranteed work; priorities may changeImplementation and Roadmapn/amet
M-045RFP 6.15No work before contract and written authorizationImplementation and Roadmapn/amet
M-046RFP 7.1Disclosure warrantyn/atarget
M-047RFP 7.2Files in Word, Excel, PowerPoint or PDF, unlocked, printable, 150 dpin/atarget
M-048RFP 8.5; A 11Interviews and demonstrations 2027-01-11 and 12 for shortlisted firms; key personnel attendRFP Compliancen/apartly met
M-049RFP 9Evaluation weights 15, 25, 20, 15, 10, 15 with page limitsRFP Compliancen/amet
M-050RFP 10.1.1 to 10.1.5Florida registration; not on the convicted, scrutinized, federal or FDOT suspension listsn/atarget
M-051RFP 10.2.1; B II iTwo-page statement of ability with digital twin or comparable experiencePlatform Familyn/atarget
M-052RFP 10.2.3; B II iiiProof of Florida business licensingn/atarget
M-053RFP 10.3; B ITwo-page letter of interest with the listed fieldsn/atarget
M-054B i; RFP 10.4.1Experience implementing digital twin, asset visualization or integrated OT platformsPlatform Family, Drone Operationsn/apartly met
M-055B i; RFP 10.4.1Three to five projects of similar scope with client, dates, role, platform, integrations and referencesn/anot offered
M-056B iImplementation challenges and how they were resolvedn/atarget
M-057B iOrganizational resources, partners and platform relationshipsn/atarget
M-058B iiDescribe the platform, modules, architecture, hosting model, licensing, third-party componentsPlatform Family, Open Standardsstandardtarget
M-059B iiShow support for business value, simplicity, COTS, configuration first, systems of record, open integration, practical AI, spatial enablementMaintenance KPIs, Role Dashboards, Systems of Record, Open Standards, Predictive Maintenance, Spatial Enablementstandardpartly met
M-060B iiIntegration and data approach: APIs, middleware, web services, event-driven methods, data readiness, dependencies, interoperabilityPoint Registry, Systems of Recordstandardpartly met
M-061B iiSpatial approach for GIS, CAD, BIM, LiDAR, imagery, floor plans, drawings, asset locations, O&MSpatial Enablement, The Terminal in 3Dconfiguredpartly met
M-062B iiCapabilities for visualization, dashboards, workflows, reports, notifications, AI, security, administration, scalabilityThe Terminal in 3D, Role Dashboards, Workflows, Predictive Maintenance, Security and Administrationstandardpartly met
M-063B ii; B IIIIdentify which capabilities are standard, configured, integrated third-party, custom or conceptual; justify custom workRFP Compliancen/amet
M-064B iiiRecommend initial scope, priorities, systems, assets, integrations, use cases and spatial capabilitiesImplementation and Roadmapconfiguredpartly met
M-065B iiiAddress the terminal and airfield focus areasTerminal Assets Now, Vertical Transportation, Boarding Bridges, Baggage Handling, HVAC and Building Management, Airfield Nowconfiguredpartly met
M-066B iiiPhases, schedule, milestones, sequencing, testing and acceptance, deployment, transitionImplementation and Roadmapconfiguredtarget
M-067B iii; C 4.5Approach, staffing, effort and Authority participation for data collection and consolidation; data readiness risksImplementation and Roadmap, Intakeconfiguredtarget
M-068B iiiAuthority resources, third parties, assumptions, exclusions, constraints, dependencies, risks, mitigationsImplementation and Roadmapn/apartly met
M-069B iiiFuture roadmap for expansionImplementation and Roadmap, Sensor Gaps (concept), Drone Operationsconceptualpartly met
M-070B iv; RFP 10.4.4Organization chart, key personnel, project manager, technical lead, resumes, availability, substitution processn/atarget
M-071B v; RFP 10.4.5Training for administrators and user groupsGlossary, Implementation and Roadmapstandardpartly met
M-072B vDocumentation and knowledge transfer for routine administration, users and dashboardsImplementation and Roadmap, Security and Administrationconfiguredtarget
M-073B ii; B vEnvironments, monitoring, security and redundancyEnvironments and Operationsstandardtarget
M-074B v; C 7.4Post-go-live support, upgrades, issue resolution, maintenance, enhancement and continuous improvementSupportstandardpartly met
M-075B vLong-term maintainability, cost-effective administration, configuration-based expansionRole Dashboards, Workflowsconfiguredtarget
M-076B vi; RFP 10.4.6Pricing form with base implementation and recurring costs, shown separatelyn/atarget
M-077B viData support labour categories, rates and hours; optional services priced separatelyImplementation and Roadmapn/atarget
M-078RFP 10.5Miscellaneous questions on terminated contracts and suretyn/atarget
M-079A 2Cone of silence: no contact with Board, evaluators or staff except through Procurementn/amet
M-080A 5Public records: claim exemptions section by section with the statuten/atarget
M-081A 7Submit through the portal by the deadlineRFP Compliancen/atarget
M-082C 1.1Terminal and airfield asset management integrating existing systems into one environmentTerminal Assets Now, Airfield Nowstandardpartly met
M-083C 1.1An ecosystem that grows with integrations, enhanced analytics including intelligent visual analytics, and use casesImplementation and Roadmapconfiguredtarget
M-084C 1.2Work collaboratively; initial and ongoing professional servicesImplementation and Roadmap, Supportconfiguredtarget
M-085C 1.3Phased implementation focused on performance monitoring, preventive, corrective and predictive maintenance, awareness and decision supportImplementation and Roadmap, Predictive Maintenance, Maintenance KPIsconfiguredpartly met
M-086C 1.3Five initial asset classes; sequence refined at initiationTerminal Assets Now, Implementation and Roadmapconfiguredpartly met
M-087C 2.1Establish the platform: a common environment with spatial informationThe Terminal in 3D, The Airport in 3Dstandardpartly met
M-088C 2.2Visibility into utilization, condition, maintenance, performance, inspections, lifecycleAsset Record, Maintenance KPIsstandardpartly met
M-089C 2.3Proactive maintenance; customer service, response times, availability, workflowMaintenance KPIs, Backlog, Work Ordersconfiguredpartly met
M-090C 2.4Integrate systems; do not replace monitoring, control or management systemsSystems of Record, HVAC and Building Managementstandardpartly met
M-091C 2.5Dashboards, spatial mapping, AI analytics including intelligent visual analyticsRole Dashboards, Predictive Maintenancestandardpartly met
M-092C 2.6Timely information for decisions through dashboards, workflows, notifications, analyticsDuties and Deadlines, Workflows, Maintenance KPIsconfiguredpartly met
M-093C 2.7Commercially supported, configured with standard tools, vendor-agnosticOpen Standards, Rules and Data Librarystandardpartly met
M-094C 3.1Business value firstMaintenance KPIsn/apartly met
M-095C 3.2Keep it simple and sustainablen/apartly met
M-096C 3.3COTS preferred; standard capabilities; minimal custom developmentPlatform Familystandardnot offered
M-097C 3.4Configuration before customizationRole Dashboards, Workflowsconfiguredtarget
M-098C 3.5Existing systems remain systems of recordSystems of Record, Point Registrystandardpartly met
M-099C 3.6Open integration by standard interfaces, APIs, middleware, web services, event-driven methodsPoint Registry, Open Standardsstandardpartly met
M-100C 3.7Practical AI: predictive maintenance, performance analysis, patterns, trends, recommendations, decision supportPredictive Maintenancestandardpartly met
M-101C 3.8Spatial enablement across GIS, CAD, BIM, LiDAR, imagery, plans, drawings, utilities, O&M; organized for each user groupSpatial Enablement, Role Dashboardsconfiguredpartly met
M-102C 4.1Project initiation activitiesImplementation and Roadmapconfiguredtarget
M-103C 4.2Requirements validation without an extensive studyImplementation and Roadmap, RFP Complianceconfiguredtarget
M-104C 4.3Configure object models, hierarchy, spatial, dashboards, rules, workflows, UI, notifications, reports, administration, securityAsset Record, Role Dashboards, Workflows, Security and Administrationconfiguredpartly met
M-105C 4.4Incorporate spatial information; assess GIS maturity; roadmap for quality, completeness, governanceSpatial Enablementconfiguredtarget
M-106C 4.5Identify, configure, test and implement interfaces; data support on request with job descriptions and ratesSystems of Record, Implementation and Roadmapintegrated third-partytarget
M-107C 4.6Practical integration reusing existing interfaces; incremental additionSystems of Record, Point Registryintegrated third-partytarget
M-108C 4.7Interfaces with CMMS/EAM, BAS/BMS, HVAC, PBB, BHS, vertical transportation, VMS with analyticsSystems of Record, Point Registryintegrated third-partytarget
M-109C 4.7Recommend information exchanges per systemVertical Transportation, Boarding Bridges, Baggage Handling, HVAC and Building Managementconfiguredpartly met
M-110C 4.8Dashboards and UI for each group, with maps, plans, status, alarms, work, trends, KPIsRole Dashboards, Terminal Assets Nowconfiguredpartly met
M-111C 4.9Configurable workflows for PM, corrective, requests, coordination, inspections, assessments, outages, notifications, approvals, tasks, follow-up, monitoringWorkflows, PM Calendarconfiguredpartly met
M-112C 4.10Initial use cases (fifteen listed)Terminal Assets Now, Maintenance KPIs, Trends and Alarms, Implementation and Roadmapconfiguredpartly met
M-113C 4.11Training and knowledge transfer for each groupImplementation and Roadmapconfiguredtarget
M-114C 5.1Enterprise asset visualization, spatial asset management, dashboards, roles, workflows, analytics, reports, notifications, integration, expansionThe Terminal in 3D, Asset Record, Role Dashboards, Workflowsstandardpartly met
M-115C 5.1Desktop and web access; mobile where appropriate
References: E1 REQ-UI-008
Self-Inspectionstandardtarget
M-116C 5.2Incorporate GIS, CAD, BIM, LiDAR, plans, drawings, layouts, locations, O&M, imagery, CCTV and analyticsSpatial Enablement, Security and Administrationconfiguredpartly met
M-117C 5.2Do not require every source before implementationSpatial Enablementstandardpartly met
M-118C 5.3Asset identification, location, attributes, relationships, status, condition, history, inspections, maintenance history, trends, lifecycleAsset Recordstandardpartly met
M-119C 5.3; C 5.4Asset records, work orders, PM calendar, backlog, trends, alarm logs and KPIs in the shape maintenance staff knowAsset Record, Work Orders, PM Calendar, Backlog, Trends and Alarms, Maintenance KPIsstandardpartly met
M-120B ii; C 2.7Rules and data loaded as versioned packs, each in its true state, each rule traced to its screens; a duty registerRules and Data Library, Duties and Deadlinesstandardpartly met
M-121C 5.4CMMS/EAM integration is foundational: work requests, orders, PM, corrective, assets, schedules, inspections, history, labour, status, condition, documentsWork Orders, PM Calendar, Maintenance and Work Ordersintegrated third-partypartly met
M-122C 5.4Complement the CMMS/EAM, never replace its core functionsWork Ordersstandardpartly met
M-123C 5.5Systems integration with status, state, alarms, faults, availability, performance, events, indicators, energyVertical Transportation, Boarding Bridges, Baggage Handling, HVAC and Building Management, Trends and Alarmsintegrated third-partypartly met
M-124C 5.6Dashboards with maps, plans, locations, indicators, colour-coded conditions, charts, trends, KPIs, alarms, maintenance and work summariesTerminal Assets Now, Trends and Alarms, Maintenance KPIs, Role Dashboardsstandardpartly met
M-125C 5.6Dashboards for engineering, facilities, operations, leasing and concessions, executivesRole Dashboardsconfiguredpartly met
M-126C 5.7AI and analytics: predictive maintenance, performance, failure trends, alarm prioritization, patterns, recommendations, capacity, optimization, decision support, natural language queryPredictive Maintenance, Trends and Alarmsstandardpartly met
M-127C 5.8Workflow management with approvals and escalationWorkflowsconfiguredpartly met
M-128C 5.9Authentication, roles, administrative controls, audit logging, activity tracking, enterprise identitySecurity and Administrationstandardpartly met
M-129C 5.10Expansion to more systems, facilities, terminals, assets, dashboards, workflows, analytics, use cases, emerging technologiesRules and Data Library, Implementation and Roadmapstandardtarget
M-130C 6.1Evaluate each interface and recommend the approach; systems remain the recordSystems of Record, Point Registryintegrated third-partytarget
M-131C 6.2CMMS/EAM information to present (records, hierarchies, locations, requests, orders, PM, corrective, inspections, history, condition, availability, documents)Asset Record, Work Ordersintegrated third-partypartly met
M-132C 6.3BAS/BMS and HVAC information (status, health, alarms, environment, energy, runtime, availability, indicators, faults)HVAC and Building Management, Trends and Alarmsintegrated third-partypartly met
M-133C 6.4Boarding bridge information (status, availability, assignments, alarms, maintenance, faults, indicators, history, inspections)Boarding Bridgesintegrated third-partypartly met
M-134C 6.5Baggage information (status, conveyor status, alarms, faults, maintenance, performance, events, condition, trends)Baggage Handling, Trends and Alarmsintegrated third-partypartly met
M-135C 6.6Vertical transportation information (status, availability, alarms, faults, inspections, history, performance, condition, interruptions)Vertical Transportationintegrated third-partypartly met
M-136C 6.7Additional systems may be recommended: VMS, security, fire alarm, electrical, utility, passenger and flight information, energyImplementation and Roadmap, Systems of Recordintegrated third-partytarget
M-137C 6.8Section missing from the documentn/atarget
M-138C 6.9Representative systems: Genetec, Acuity SensorSwitch, Allen-Bradley BHS and PBB, Simplify i3, PMX, Schneider EcoStruxure, Skidata, Business Central, generator monitoringSystems of Record, Point Registry, Rules and Data Libraryintegrated third-partypartly met
M-139C 7.1Deliverables: Implementation Plan, configured platform, object models, dashboards, workflows, reports, rules, integrations, security, user acceptance supportImplementation and Roadmapconfiguredtarget
M-140C 7.2Concise documentation (configuration, integration, procedures, guidance, architecture, interfaces, training)Implementation and Roadmapconfiguredtarget
M-141C 7.3Training for administrators, engineering, facilities, maintenance, operations, IT, executivesImplementation and Roadmapconfiguredtarget
M-142C 7.4Ongoing enhancement and sustainment services (dashboards, workflows, integrations, use cases, AI, performance, UI, configuration, spatial, support, knowledge transfer, roadmap planning)Support, Implementation and Roadmapconfiguredtarget
M-143Beyond the RFPA platform proven on other placesPlatform Familyconceptualpartly met
M-144Beyond the RFPDrone inspections of the airfieldDrone Operations, Inspection Mission, Drone Cockpitconceptualtarget
M-145Beyond the RFPSensors where no maker data reachesSensor Gaps (concept)conceptualtarget
M-146Beyond the RFPGrant evidence for AIP, infrastructure law programs and FDOT grantsGrant Opportunities, Grant Application, Grant Pipelinestandardpartly met
M-147Beyond the RFPPart 139 records: self-inspection, condition reporting and NOTAM drafts, SMSSelf-Inspection, Condition and NOTAMs, Safety Management, Duties and Deadlinesstandardpartly met

Download

FileSizesha256
Requirements matrix, 147 rows (CSV)20 KB