2.19 · Proof of concept · Maintenance
Trends and Alarms Real
The readings over time, the alarms they raised and who answered them.
Picture: Headless capture of poc/index.html?v=trends&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.
Screen · Proof of concept · Maintenance
The readings over time, the alarms they raised and who answered them.
- Sources
- Interchange
- Twin
- Screens
- Plan
- Kind
- Screen
- Status
- partly met
- Airport layer
- Screens: the POC story and the spines
- Airport area
- not linked
- System
- not linked
- Sensor type
- not linked
Open the screen · Open the detail
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
Open this screen in the proof of concept
Capture of the screen: Trends and Alarms. Dark and light modes.
Narration line
It lets you chart each tagged point over time with its alarm thresholds.
Source: poc/bearings/trends.json, beat "What it shows"
- Group
- Maintenance
- Status as the app labels it
- Real
- Basis
- The screen runs. Data: carefully crafted and curated test data for common use cases.
What the screen must do (3)
- Chart each tagged point over time with its alarm thresholds (REQ-SFB-063)
- Keep an alarm and event log with time, point, value, priority and who acknowledged it (REQ-SFB-063)
- Show a fault history timeline (REQ-SFB-063)
Requirements matrix rows that name this screen (13)
| Row | RFP section | Requirement | Status |
|---|
| M-003 | RFP 1.1 | Enhanced visualization, analytics, dashboards, workflows and decision support | partly met |
| M-016 | RFP 3, focus area | Vertical transportation (elevators, escalators, moving walkways) | partly met |
| M-017 | RFP 3, focus area | Passenger boarding bridge systems | partly met |
| M-018 | RFP 3, focus area | Baggage handling systems | partly met |
| M-019 | RFP 3, focus area | HVAC systems | partly met |
| M-028 | RFP 3, analytics | AI-enabled analytics where practical and beneficial | partly met |
| M-112 | C 4.10 | Initial use cases (fifteen listed) | partly met |
| M-119 | C 5.3; C 5.4 | Asset records, work orders, PM calendar, backlog, trends, alarm logs and KPIs in the shape maintenance staff know | partly met |
| M-123 | C 5.5 | Systems integration with status, state, alarms, faults, availability, performance, events, indicators, energy | partly met |
| M-124 | C 5.6 | Dashboards with maps, plans, locations, indicators, colour-coded conditions, charts, trends, KPIs, alarms, maintenance and work summaries | partly met |
| M-126 | C 5.7 | AI and analytics: predictive maintenance, performance, failure trends, alarm prioritization, patterns, recommendations, capacity, optimization, decision support, natural language query | partly met |
| M-132 | C 6.3 | BAS/BMS and HVAC information (status, health, alarms, environment, energy, runtime, availability, indicators, faults) | partly met |
| M-134 | C 6.5 | Baggage information (status, conveyor status, alarms, faults, maintenance, performance, events, condition, trends) | partly met |
Requirement identifiers (1)