2.15 · Proof of concept · Maintenance
Asset Record Real
One asset's full record: where it sits, what it is, its readings, its schedule and its history.
Picture: Headless capture of poc/index.html?v=asset&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.
Screen · Proof of concept · Maintenance
One asset's full record: where it sits, what it is, its readings, its schedule and its history.
- Sources
- Interchange
- Twin
- Screens
- Plan
- Kind
- Screen
- Status
- partly met
- Airport layer
- Screens: the POC story and the spines
- Airport area
- not linked
- System
- not linked
- Sensor type
- not linked
Open the screen · Open the detail
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
Open this screen in the proof of concept
Capture of the screen: Asset Record. Dark and light modes.
Narration line
It shows the asset hierarchy from site to component.
Source: poc/bearings/asset.json, beat "What it shows"
- Group
- Maintenance
- Status as the app labels it
- Real
- Basis
- The screen runs. Data: carefully crafted and curated test data for common use cases.
What the screen must do (4)
- Show the asset hierarchy from site to component (REQ-SFB-059)
- Show nameplate, status, criticality and open work orders (REQ-SFB-059)
- Show meters, the PM schedule, maintenance history and documents, from the systems that hold them (REQ-SFB-059, REQ-SFB-007)
- Write failure modes in the ISO 14224 style, mapped to the Authority's codes (REQ-SFB-059)
Requirements matrix rows that name this screen (9)
| Row | RFP section | Requirement | Status |
|---|
| M-008 | RFP 3, objective 2 | Visibility into assets, condition, status, maintenance and lifecycle | partly met |
| M-015 | RFP 3, initial scope | Asset management optimization as the first focus | partly met |
| M-023 | RFP 3, configuration | Configure asset models, dashboards, workflows, reports, notifications, security and user interfaces | partly met |
| M-088 | C 2.2 | Visibility into utilization, condition, maintenance, performance, inspections, lifecycle | partly met |
| M-104 | C 4.3 | Configure object models, hierarchy, spatial, dashboards, rules, workflows, UI, notifications, reports, administration, security | partly met |
| M-114 | C 5.1 | Enterprise asset visualization, spatial asset management, dashboards, roles, workflows, analytics, reports, notifications, integration, expansion | partly met |
| M-118 | C 5.3 | Asset identification, location, attributes, relationships, status, condition, history, inspections, maintenance history, trends, lifecycle | partly met |
| M-119 | C 5.3; C 5.4 | Asset records, work orders, PM calendar, backlog, trends, alarm logs and KPIs in the shape maintenance staff know | partly met |
| M-131 | C 6.2 | CMMS/EAM information to present (records, hierarchies, locations, requests, orders, PM, corrective, inspections, history, condition, availability, documents) | partly met |
Requirement identifiers (2)