2.48 · Proof of concept · Assets
Maintenance and Work Orders Real
The repairs in progress, read from the Authority's work order system.
Picture: Headless capture of poc/index.html?v=work&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.
Screen · Proof of concept · Assets
The repairs in progress, read from the Authority's work order system.
- Sources
- Interchange
- Twin
- Screens
- Plan
- Kind
- Screen
- Status
- partly met
- Airport layer
- Screens: the POC story and the spines
- Airport area
- not linked
- System
- not linked
- Sensor type
- not linked
Open the screen · Open the detail
Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail
Open this screen in the proof of concept
Capture of the screen: Maintenance and Work Orders. Dark and light modes.
Narration line
It shows the open work orders read from the maintenance system of record, each placed on the airfield.
Source: poc/bearings/work.json, beat "What it shows"
- Group
- Assets
- Status as the app labels it
- Real
- Basis
- The screen runs. Data: carefully crafted and curated test data for common use cases.
What the screen must do (5)
- Show the open work orders read from the maintenance system of record, each placed on the airfield (REQ-FUNC-058, REQ-INT-004)
- Show where each work order came from (an inspection, an outage, a find, a schedule) (REQ-FUNC-058)
- Show preventive maintenance due and overdue against the schedule (REQ-FUNC-059)
- Never close a work order in the twin: closing happens in the maintenance system, and the twin shows it (REQ-FUNC-060)
- Read work orders, PM and inspections from Simplify i3, the Authority's CMMS/EAM, as the foundational interface (REQ-SFB-006, REQ-SFB-007)
Requirements matrix rows that name this screen (2)
| Row | RFP section | Requirement | Status |
|---|
| M-004 | RFP 1.1; C 3.5 | Complement, not replace; existing systems remain authoritative systems of record | partly met |
| M-121 | C 5.4 | CMMS/EAM integration is foundational: work requests, orders, PM, corrective, assets, schedules, inspections, history, labour, status, condition, documents | partly met |
Requirement identifiers (2)