AirfieldpathOrlando Sanford International

3.4 · The RFP and the plan · RFP statements

RS-02: Attachment C, 1.1 Overview (repeated in 3.5 Existing Systems Remain Systems of Record)

Existing systems will continue to perform their respective operational functions and remain the authoritative systems of record within their functional domains.

No picture for this component.

Document · The RFP and the plan · RFP statements

RS-02: Attachment C, 1.1 Overview (repeated in 3.5 Existing Systems Remain Systems of Record)

Existing systems will continue to perform their respective operational functions and remain the authoritative systems of record within their functional domains.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Document
Status
partly met, target
Airport layer
not linked
Airport area
not linked
System
not linked
Sensor type
not linked
SheetA-10

Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Existing systems will continue to perform their respective operational functions and remain the authoritative systems of record within their functional domains.
RFP 2027-006, Attachment C, 1.1 Overview (repeated in 3.5 Existing Systems Remain Systems of Record)
Source file
2027-006-RFP_-_Attachment_C_-_Detailed_Scope_of_Work.txt
Lines
23 to 25
Checked by
poc/build/check-rfp-says.py, against the RFP text

Every value names the source system that owns it, and the twin reads from those systems instead of replacing them.

Screens that carry this statement