2.41 · Proof of concept · Operate

Storm Plan Real

A storm or emergency plan run as work orders, with what the twin finds and what is escalated.

Picture: Headless capture of poc/index.html?v=storm&m=light, as the proof of concept renders it, 1400 by 875 at 2x scale.

Screen · Proof of concept · Operate

Storm Plan

A storm or emergency plan run as work orders, with what the twin finds and what is escalated.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Screen
Status
not linked
Airport layer
Screens: the POC story and the spines
Airport area
not linked
System
not linked
Sensor type
not linked
ScreensStorm Plan

Open the screen · Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

Open this screen in the proof of concept

Storm Plan, a capture of the screen
Capture of the screen: Storm Plan. Dark and light modes.

Narration line

Each checklist item is a work order in Simplify i3 with an owner and a deadline.

Source: poc/bearings/storm.json, beat "Work orders"

Group
Operate
Status as the app labels it
Real
Basis
The screen runs. Data: carefully crafted and curated test data for common use cases.
What the screen must do (5)
  • Run each plan in stages tied to the declared status: watch, warning, landfall, recovery
  • Make each checklist item a work order in Simplify i3 with an owner and a stage deadline
  • Find items that are normal on a calm day and urgent now: loose equipment, clogged drains, untested generators and pumps, open roof repairs
  • Escalate any item not done by its deadline: supervisor, duty manager, emergency lead, each step logged
  • Inspect in recovery and file every finding as evidence; replay a past run