3.7 · The RFP and the plan · RFP statements

RS-05: Attachment C, 3.4 Configuration Before Customization

the Platform should be configured using standard graphical configuration tools rather than custom software development whenever practical.

No picture for this component.

Document · The RFP and the plan · RFP statements

RS-05: Attachment C, 3.4 Configuration Before Customization

the Platform should be configured using standard graphical configuration tools rather than custom software development whenever practical.

  1. Sources
  2. Interchange
  3. Twin
  4. Screens
  5. Plan
Kind
Document
Status
partly met, target, met
Airport layer
not linked
Airport area
not linked
System
not linked
Sensor type
not linked
SheetA-10

Open the detail

Level 2 of 3 This component, complete on its own. Its files, sources and tests are the detail below. Open the detail

the Platform should be configured using standard graphical configuration tools rather than custom software development whenever practical.
RFP 2027-006, Attachment C, 3.4 Configuration Before Customization
Source file
2027-006-RFP_-_Attachment_C_-_Detailed_Scope_of_Work.txt
Lines
255 to 256
Checked by
poc/build/check-rfp-says.py, against the RFP text

Rooms, rules and workflows are set in the product's own configuration screens.